Global Information Lookup Global Information

China Railway CRH2 information


China Railway CRH2 EMU
CRH2A at Nanjing railway station
In service2007–present
ManufacturerKawasaki Heavy Industries,
CRRC Qingdao Sifang
Family nameShinkansen (E2 series)
Number builtCRH2A: 60+40 trainsets (800 cars)
CRH2B: 20 trainsets (320 cars)
CRH2C (stage 1): 30 trainsets (240 cars)
CRH2C (stage 2): 20 trainsets (160 cars)
CRH2E: 20 trainsets (320 cars)
FormationCRH2A: 8 cars per trainset (4M4T)
CRH2B/E: 16 cars per trainset (8M8T)
CRH2C: 8 cars per trainset (6M2T)
CapacityCRH2A: 610/571/562/588/600/608
CRH2B: 1230
CRH2C: 610/626
CRH2E: 630/880(CRH2E-2463, 2464 and 2465)
OperatorsChina Railway
- CR Beijing
- CR Shanghai
- CR Jinan
- CR Xi'an
- CR Wuhan
- CR Nanchang
- CR Zhengzhou
- CR Taiyuan
- CR Chengdu
- CR Guangzhou
- CR Nanning
Lines servedMost 200-250km/h high speed rail lines across China, plus some conventional lines
Specifications
Train lengthCRH2A/C: 201.4 m (660 ft 9 in)
CRH2B/E: 401.4 m (1,316 ft 11 in)
Width3,380 mm (11 ft 1 in)
Height3,700 mm (12 ft 2 in)
Platform height1,250 mm (4 ft 1 in)
Maximum speedCRH2A/B/E: 250 km/h (155 mph)
CRH2C (stage 1): 300 km/h (186 mph)
CRH2C (stage 2): 350 km/h (217 mph)
Traction systemWater cooling IGBT–VVVF inverter control
(CRH2B/E: Mitsubishi Electric type MAP-304-A25V141,
CRH2A/C: Hitachi type CII-HHR1420A/B/D, Zhuzhou CSR Times Electric type TGA10/10A/10E/10G)
Traction motors3-phase AC induction motors
(CRH2B/E: Mitsubishi Electric type MB-5120-A, Zhuzhou CSR Times Electric type MT-205
CRH2A/C: Hitachi/CRRC Yongji Electric type YJ-92A, Zhuzhou CSR Times Electric type YQ-365)
Power outputCRH2A: 4.8 MW (6,437 hp)
CRH2B/E: 9.6 MW (12,874 hp)
CRH2C:
  • Stage 1: 7.2 MW (9,655 hp)
  • Stage 2: 8.76 MW (11,747 hp)
  • TransmissionAC-DC-AC
    Electric system(s)25 kV 50 Hz AC Overhead catenary
    Current collector(s)Pantograph
    Braking system(s)Regenerative, electronically controlled pneumatic brakes
    Track gauge1,435 mm (4 ft 8+12 in) standard gauge

    The CRH2 Hexie (simplified Chinese: 和谐号; traditional Chinese: 和諧號; pinyin: Héxié Hào; lit. 'Harmony') is one of the high-speed train models in China. The CRH2 is based on the E2-1000 Series Shinkansen design from Japan with the license purchased from a consortium formed of Kawasaki Heavy Industries, Mitsubishi Electric, and Hitachi, and represents the second Shinkansen train model to be exported.

    In 2004, the Ministry of Railway in China purchased an initial 60 sets of the train from Kawasaki Heavy Industries with a maximum speed of 250 km/h (155 mph). However, the newer versions of the CRH2 are not related to the E2-1000 Series despite having the same exterior shell.[1]

    1. ^ Japan Inc Shoots Itself on the Foot

    and 14 Related for: China Railway CRH2 information

    Request time (Page generated in 0.8218 seconds.)

    China Railway CRH2

    Last Update:

    The CRH2 Hexie (simplified Chinese: 和谐号; traditional Chinese: 和諧號; pinyin: Héxié Hào; lit. 'Harmony') is one of the high-speed train models in China. The...

    Word Count : 2197

    China Railway CRH380A

    Last Update:

    Sifang. As a continuation of the CRH2-380 program it both replaces foreign (Japanese) technology in the CRH2 with Chinese developments and increases its...

    Word Count : 2280

    Rail transport in China

    Last Update:

    cars. China Railway High-speed (CRH): CRH1, CRH2, CRH3, CRH5, CRH6, CRH380A, CR400AF, CR400BF, CR300AF, CR300BF Zefiro 380 X 2000 Blue Arrow China Star...

    Word Count : 9985

    China Railway comprehensive inspection trains

    Last Update:

    2008. Formation CRH2A-2010 (formerly CRH2-010A) is the first high-speed test train in China and the first CRH2 trainset manufactured by CSR Sifang. The...

    Word Count : 1141

    China Railway CRH1

    Last Update:

    2011, CRH1-046B was hit on ZY104600 car by CRH2-139E in Yongtaiwen PFL accident. On October 31, 2007, the Chinese MOR ordered 20 sets of CRH1E trains (CRH1-061E~CRH1-080E)...

    Word Count : 1547

    China Railway CRH6

    Last Update:

    Daxing Airport Express (currently 4-car and 8-car Type D.) China Railway CRH2 China Railway NDJ3 "CRRC SIFANG". "The Standard Finance". Archived from the...

    Word Count : 683

    China Railway CRH3

    Last Update:

    Beijing" (in Chinese). worldtrailway.cn. 9 December 2009. Archived from the original on 7 October 2011. Retrieved 29 May 2010. "时速超400公里的是CRH2型的380级别的动车吗-城际高铁-地铁族"...

    Word Count : 2172

    Kawasaki Railcar Manufacturing

    Last Update:

    Tama Toshi Monorail Dhaka Metro Rail – Green Train Chinese Ministry of Railways – Type 6K, Type CRH2 Hong Kong MTR – SP1900 EMU Hong Kong MTR Light Rail...

    Word Count : 923

    Fastest trains in China

    Last Update:

    2011 was on the Wuhan–Guangzhou high-speed railway, where from December 2009 until July 1, 2011, the CRH3/CRH2 coupled-train sets averaged 312.5 km/h (194...

    Word Count : 946

    Shinkansen

    Last Update:

    service in 2007, with a maximum speed of 300 km/h (190 mph). The China Railway CRH2, built by CSR Sifang Loco & Rolling stocks corporation, with the license...

    Word Count : 13735

    Wenzhou train collision

    Last Update:

    Regina, while the second train CRH2-139E is a derivative of the Japanese E2 Series Shinkansen 'bullet train.' The Chinese maker has been attempting to patent...

    Word Count : 7264

    Changsha South railway station

    Last Update:

    increased greatly. Inside the waiting hall of Changsha South railway station Platform view of a CRH2 train CRH3 trainsets going northwards A south-bound CRH3...

    Word Count : 628

    Suzhou Industrial Park railway station

    Last Update:

    will be served by Line 8 of Suzhou Rail Transit. Station Hall Platform A CRH2 train was stopped at Suzhou Industrial Park. SIP Administrative Commission...

    Word Count : 192

    Campaign to raise the speed of railway travel in China

    Last Update:

    series trains raised travel speed. During the sixth railway speedup campaign, 52 CRH trainsets (CRH1, CRH2 and CRH5) were put into operation, service as 280...

    Word Count : 904

    PDF Search Engine © AllGlobal.net