The Harvey O. Banks Pumping Plant is located 2.5 miles (4.0 km) southwest of the Clifton Court Forebay and 12 miles (19 km) northwest of Tracy, CA. The plant is the first pumping plant for the California Aqueduct and the South Bay Aqueduct. It provides the necessary fluid head (potential energy) for the California Aqueduct to flow for approximately 80 miles (130 km) south past the O'Neill Forebay and the San Luis Reservoir to the Dos Amigos Pumping Plant. The Banks Pumping Plant initially flows into the Bethany Reservoir. It is from the Bethany Reservoir that the South Bay Aqueduct begins.
The John E. Skinner Delta Fish Protective Facility is located 2 miles upstream from the facility and prevents fishes from reaching the pumping plant.[1]
Limits on water pumping from the Sacramento Delta is a politically contentious issue.[2] In dry years, water pumped from the Delta creates a hazard to spring-run salmon. As the Banks Pumping Plant pulls water from the Sacramento River southward across the Delta, it disrupts the normal flow direction of east to west that salmon smolt follow to the Pacific Ocean. Populations of salmon and steelhead trout have reached critically low levels in the decades after SWP water withdrawals began. The fish migration issue has become hotly contested in recent years, with rising support for the construction of the Peripheral Canal, which would divert water around the Delta, restoring the natural flow direction.
^"Where Water Runs Uphill". 2008-06-06.
^Kasler, Dale (22 December 2016). "With environmental review finalized, could construction on the Delta tunnels begin in 2018?". The Sacramento Bee. Retrieved 7 July 2023. (subscription required)
and 23 Related for: Banks Pumping Plant information
O'Neill Forebay and the San Luis Reservoir to the Dos Amigos PumpingPlant. The BanksPumpingPlant initially flows into the Bethany Reservoir. It is from the...
Joaquin-Sacramento River Delta at the BanksPumpingPlant, which pumps from the Clifton Court Forebay. Water is pumped by the BanksPumpingPlant to the Bethany Reservoir...
in the Central Valley until needed. Construction of the Harvey O. BanksPumpingPlant, located near Tracy, California, also began in 1963. Though the DWR...
The Ludington Pumped Storage Plant is a hydroelectric plant and reservoir in Ludington, Michigan. It was built between 1969 and 1973 at a cost of $315...
the water must be pumped 2,882 feet (878 m) over the Tehachapi Mountains, with 1,926 feet (587 m) at the Edmonston PumpingPlant alone, the highest single...
The Colorado River Aqueduct added six pumps to the original three at each of its five pumping stations. CRA pumping expanded from about 16,500 acre-feet...
tunnels. When pumping water moves through the same conduits back to the upper reservoir. The power plant will contain four Francis pump-turbines which...
here, the BanksPumpingPlantpumps water into the California Aqueduct and the South Bay Aqueduct; the nearby C.W. Bill Jones PumpingPlantpumps water into...
needed and allows the plant to serve as a peaking power plant. The plant generates 737 GWh annually but consumes 1,021 GWh pumping. Although it consumes...
in the Delta to facilitate water flow from the Sacramento to the BanksPumpingPlant and the California Aqueduct, which can carry as much as 4.2 million...
43 MW in pump mode. The installed capacity of the hydroelectric power plant is 235.5 MW, and 135 MW is in pumping mode. Operating in pumping mode, the...
Attaqa Mountain Pumped Storage Power Plant is an ongoing hydroelectricity power plant currently in development with a planned total capacity of 2400MWp...
of Heat Pumping Technologies in Switzerland – Texts". www.aramis.admin.ch. Archived from the original on 2021-11-23. Retrieved 2023-09-14. Banks, David...
to 7,079 MW. The Pump-Generating Plant contains six pump-generators with an installed capacity of 314 MW. When pumping water into Banks Lake they consume...
the pumping power consumption. The consumed pumping power is compensated fully by the enhanced generation from the 44 MW capacity mini hydel plants located...
piped to the Toronto Island Water Treatment Plant for potable water treatment, then to the John Street Pumping Station, where an Energy Transfer Station...
from the engine. Inline pumps still find favour on large multi-cylinder engines such as those on trucks, construction plant, static engines and agricultural...
Kota Thermal Power Plant is Rajasthan's first major coal-fired power plant. It is located on the west bank of the Chambal River in Kota. Kota Thermal...
Clifton Court Forebay near Tracy, California where the Jones and BanksPumpingPlants draw water from the Delta in order to deliver it south. The canals...
weaving the trenches of the pit. 1961 June: first concrete plant was built. July: start of the pumping of the gateway August: first cubic meter of concrete...
having three banks of cylinders, has its crankshafts rotating in the opposite direction. The exhaust lead of 20° is added to the 60° between banks, giving...