Upper Cisokan Pumped Storage Power Plant | |
---|---|
Official name | Upper Cisokan Pumped Storage Hydro Electric Power Plant |
Country | Indonesia |
Location | West Java |
Coordinates | 6°56′52″S 107°13′07″E / 6.94778°S 107.21861°E |
Status | Proposed |
Opening date | 2025 (est.) |
Construction cost | US$800 million |
Owner(s) | Perusahaan Listrik Negara |
Upper reservoir | |
Creates | Cirumamis Reservoir |
Total capacity | 14,000,000 m3 (11,350 acre⋅ft) |
Lower reservoir | |
Creates | Cisokan Reservoir |
Total capacity | 63,000,000 m3 (51,075 acre⋅ft) |
Power Station | |
Hydraulic head | 276 m (906 ft) |
Pump-generators | 4 x 260 MW (275 MW in pump-mode) Francis pump-turbines |
Installed capacity | 1,040 MW |
The Upper Cisokan Pumped Storage Plant is a proposed pumped-storage hydropower facility in Indonesia, due for completion by 2025.[1]
The pant will be located 40 km (25 mi) west of Bandung in West Java, Indonesia, and its two reservoirs will occupy area in West Bandung Regency and Cianjur Regency.[2] It will have an installed capacity of 1,040 MW and will be Indonesia's first pumped-storage power plant.