Upper Cisokan Pumped Storage Power Plant
Official nameUpper Cisokan Pumped Storage Hydro Electric Power Plant
CountryIndonesia
LocationWest Java
Coordinates6°56′52″S 107°13′07″E / 6.94778°S 107.21861°E / -6.94778; 107.21861
StatusProposed
Opening date2025 (est.)
Construction costUS$800 million
Owner(s)Perusahaan Listrik Negara
Upper reservoir
CreatesCirumamis Reservoir
Total capacity14,000,000 m3 (11,350 acre⋅ft)
Lower reservoir
CreatesCisokan Reservoir
Total capacity63,000,000 m3 (51,075 acre⋅ft)
Power Station
Hydraulic head276 m (906 ft)
Pump-generators4 x 260 MW (275 MW in pump-mode) Francis pump-turbines
Installed capacity1,040 MW

The Upper Cisokan Pumped Storage Plant is a proposed pumped-storage hydropower facility in Indonesia, due for completion by 2025.[1]

The pant will be located 40 km (25 mi) west of Bandung in West Java, Indonesia, and its two reservoirs will occupy area in West Bandung Regency and Cianjur Regency.[2] It will have an installed capacity of 1,040 MW and will be Indonesia's first pumped-storage power plant.

  1. ^ "Development of PumpedStorage Hydropower in Java Bali System Project (P172256)" (PDF). World Bank. 20 December 2019. Retrieved 20 April 2020.
  2. ^ "Pembangunan PLTA Cisokan Selesai 4 Tahun". Retrieved September 1, 2012.

and 2 Related for: Upper Cisokan Pumped Storage Power Plant information

Request time (Page generated in 0.8109 seconds.)

Upper Cisokan Pumped Storage Power Plant

Last Update:

The Upper Cisokan Pumped Storage Plant is a proposed pumped-storage hydropower facility in Indonesia, due for completion by 2025. The pant will be located...

Word Count : 912

List of power stations in Indonesia

Last Update:

following lists some of the larger power stations in Indonesia. Data are not included for a large number of small isolated plants (mostly diesel) in the Outer...

Word Count : 765

PDF Search Engine © AllGlobal.net