Private railway in Pilbara region of Western Australia
Roy Hill railway
Map of the Roy Hill railway
Overview
Status
Operational
Locale
Pilbara, Western Australia
Termini
Roy Hill mine
Port Hedland, SP1 & SP2 Berths
Service
Type
Heavy rail
System
Pilbara
Operator(s)
Roy Hill Infrastructure Pty Ltd
History
Opened
2015
Technical
Line length
344 km (213.75 mi)
Track gauge
1,435 mm (4 ft 8+1⁄2 in)
The Roy Hill railway, officially the Roy Hill Infrastructure railway, owned and operated by Hancock Prospecting, is a private rail network in the Pilbara region of Western Australia built to carry iron ore.
In addition to the Hancock Prospecting network, several other independent iron ore rail lines comprise the Pilbara Iron Ore Railways:
The RoyHillrailway, officially the RoyHill Infrastructure railway, owned and operated by Hancock Prospecting, is a private rail network in the Pilbara...
The RoyHill mine is an iron ore mine in the Chichester Range in the Pilbara region of Western Australia, located 115 kilometres (71 mi) north of Newman...
Hamersley & Robe River railway, BHP operates the Goldsworthy and Mount Newman railways and Hancock Prospecting the RoyHillrailway. FMG originally planned...
Hamersley & Robe River railway, the Fortescue Metals Group operates the Fortescue railway and Hancock Prospecting the RoyHillrailway. In May 1966, the 112...
Goldsworthy railway, and recently in 2008 with Fortescue Metals Group's Fortescue railway and in 2015 with RoyHill Holdings' RoyHillrailway. These lines...
accompanying hydrogen fuel cells. The first battery locomotives were for the RoyHillrailway. Chang, Sue (February 21, 2019). "Wabtec to replace Goodyear Tire on...
Port Hedland through the Fortescue railway, where it is loaded onto ships. Construction on a 280 km long railway from Cloudbreak to the Herb Elliott...
Metals Group berths 1,2,3 and 4,5 (in South West Creek) South West Creek - RoyHill Stanley Point SP 1 & SP 2 Inner Harbour berths - PPA Wharves 1,2 & 3 and...
the world's heaviest haul railwayRailway Gazette International 14 July 2008 Rail RoyHill East Pilbara Independent Railway Aurizon Trainline 2 Statistical...
connects Eliwana to the previously existing parts of the Fortescue railway. The railway line was eventually completed in March 2021. The mine forms the core...
is a list of railway stations in India. The railway operations are managed by Indian Railways (IR) in the country. List of Indian Railways stations whose...
Munnar (IPA: [muːn̪ːɐːr]) is a town and hill station located in the Idukki district of the southwestern Indian state of Kerala. Munnar is situated at around...
Primrose Hillrailway station, now housing a business, sits on the railway lines that separate the Primrose Hill area from Camden Town. Primrose Hill Tunnel...
in regards to using the company's rail infrastructure, the Goldsworthy railway. BHP, in late 2010, had agreed to a joint feasibility study into how an...
Pilbara to develop was the Goldsworthy mine in 1965, and the Goldsworthy railway line as well as port facilities at Finucane Island were constructed. On...
mine to develop was the Goldsworthy mine in 1965 and a railway line, the Goldsworthy railway, as well as port facilities at Finucane Island were constructed...
There is another marble jain temple on hill known as Jal Mandir. It is easily accessible from Parasnath railway station. This is one of the most holy and...
and Kings Valley mine, and 127km of new railway line to connect the mines with the existing Fortescue railway. Mine life, at the time, was predicted to...
Broken Hill also used to be a break of gauge station where the state railway systems of South Australia and New South Wales met. Broken Hill is Australia's...