Global Information Lookup Global Information

Ragigudda metro station information


Ragigudda
Namma Metro station
Final stages of this metro station under Namma Metro
General information
Location45th Cross, Marenahalli, 5th Block, Jayanagar, Bengaluru, Karnataka 560041
Coordinates12°55′02″N 77°35′18″E / 12.91711°N 77.58837°E / 12.91711; 77.58837
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Yellow Line
PlatformsSide platform
Platform-1 → Rashtreeya Vidyalaya Road
Platform-2 → Bommasandra
Tracks2 (TBC)
Construction
Structure typeElevated, Double track
Platform levels(TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station code(TBC)
History
OpeningNovember 2024; 5 months' time (November 2024) (TBC)
Electrified750 V DC third rail (TBC)
Services
Preceding station Namma Metro Following station
Rashtreeya Vidyalaya Road
Terminus
Yellow Line
(Operational around November 2024)
Jayadeva Hospital
towards Bommasandra
Location
Map
Preview warning: Page using Template:Infobox station with deprecated parameter "ADA". Replace with "accessible".

Ragigudda is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India. Located in between Jayanagar 9th Block & J.P. Nagar 2nd Phase, the station is named after the Ragigudda Anjaneya Temple.

As per latest reports, the Yellow Line is stated to be operational around November 2024 due to the upcoming Indian general election which will occur during April–May 2024 and lots of trial runs along with more trainsets are required for commencement of operations.[1][2][3][4][5]

  1. ^ "Bengaluru Metro's Yellow Line to Open in November 2024, Tejasvi Surya Shares Key Details". TimesNow. 9 March 2024. Retrieved 10 March 2024.
  2. ^ DHNS. "Bengaluru metro's Yellow Line to start only after general elections". Deccan Herald. Retrieved 14 December 2023.
  3. ^ "RV Road-Bommasandra Metro stretch to open by April: CM Siddaramaiah". The New Indian Express. Retrieved 11 November 2023.
  4. ^ "Metro Yellow Line to E-City & extended Green Line to open by April 2024: CM Siddramaiah". The Times of India. 21 October 2023. ISSN 0971-8257. Retrieved 11 November 2023.
  5. ^ "Bengaluru metro's yellow line connecting Bommasandra to Silk Board to open by February 2024, says MP Tejasvi Surya". Hindustan Times. 6 October 2023. Retrieved 11 November 2023.

and 20 Related for: Ragigudda metro station information

Request time (Page generated in 0.8262 seconds.)

Ragigudda metro station

Last Update:

Ragigudda is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India. Located in between...

Word Count : 268

Jayadeva Hospital metro station

Last Update:

Level 2 → Street Level surface connecting Ragigudda and BTM Layout Level 3 → Elevated Flyover from Ragigudda to Central Silk Board Level 4 → Yellow Line...

Word Count : 384

List of Namma Metro stations

Last Update:

operational 65 metro stations of Namma Metro as of October 2023, there are 56 elevated stations, 8 underground stations and 1 at-grade station. The first...

Word Count : 1395

Ragigudda Anjaneya Temple

Last Update:

The Ragigudda Sree Prasanna Anjaneyaswamy Temple, commonly referred to as Ragigudda Temple or Ragigudda Anjaneya Temple is a temple dedicated to Lord...

Word Count : 782

Bommasandra metro station

Last Update:

terminal metro station on the Yellow Line of the Namma Metro serving the Bommasandra neighbourhood with its Industrial Area and Heelalige railway station connected...

Word Count : 254

BTM Layout metro station

Last Update:

BTM Layout is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India. As per latest reports...

Word Count : 249

Central Silk Board metro station

Last Update:

interchange metro station on the North-South corridor of the Yellow Line and Blue Line of Namma Metro in Bangalore, India. This metro station serves the...

Word Count : 293

Kudlu Gate metro station

Last Update:

Kudlu Gate is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India. As per latest reports...

Word Count : 249

Electronic City metro station

Last Update:

Electronic City is an upcoming elevated metro station on the Yellow Line of the Namma Metro in southern Bengaluru, India, being built to serve the Information...

Word Count : 334

Singasandra metro station

Last Update:

Singasandra is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India. As per latest reports...

Word Count : 248

Rashtreeya Vidyalaya Road metro station

Last Update:

interchange metro station on the North-South corridor of the Green Line and the East-West corridor of the upcoming Yellow Line of Namma Metro serving the...

Word Count : 345

Hosa Road metro station

Last Update:

Hosa Road is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India. As per latest reports...

Word Count : 249

Konappana Agrahara metro station

Last Update:

Agrahara is an upcoming important elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India. As per latest reports...

Word Count : 250

Huskur Road metro station

Last Update:

Veerasandra) is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India. As per latest reports...

Word Count : 253

Hebbagodi metro station

Last Update:

metro station on the Yellow Line of the Namma Metro serving the Hebbagodi suburb. In 2020, Biocon Group signed an agreement with the Bangalore Metro Rail...

Word Count : 317

Namma Metro

Last Update:

underground metro system in South India. Namma Metro has a mix of underground, at grade, and elevated stations. Out of the 66 operational metro stations of Namma...

Word Count : 14677

Beratena Agrahara metro station

Last Update:

Beratena Agrahara is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India. As per latest reports...

Word Count : 249

Bommanahalli metro station

Last Update:

Roopena Agrahara) is an upcoming elevated metro station on the north–south corridor of the Yellow Line of Namma Metro in Bangalore, India. As per latest reports...

Word Count : 253

Silk Board junction

Last Update:

road-cum-rail flyover between Ragigudda and Silk Board junction. The flyover will be built 8 metres (26 ft) above the ground while the metro line is planned to be...

Word Count : 746

Hongasandra metro station

Last Update:

Garvebhavi Palya) is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India. As per latest reports...

Word Count : 253

PDF Search Engine © AllGlobal.net