Side platform Platform-1 → Rashtreeya Vidyalaya Road Platform-2 → Bommasandra Side platform (TBC) Platform-3 - Train Terminates Here Platform-4 - Krishnarajapuram or KIAL Terminals Platform numbers (TBC)
Tracks
4 (TBC)
Construction
Structure type
Elevated, Double track
Platform levels
(TBC)
Parking
(TBC)
Accessible
(TBC)
Other information
Status
Under Construction
Station code
(TBC)
History
Opening
November 2024; 5 months' time (November 2024)(TBC) 2026; 2 years' time (2026)(TBC)
Electrified
750 V DC third rail (TBC)
Services
Preceding station
Namma Metro
Following station
BTM Layout
towards Rashtreeya Vidyalaya Road
Yellow Line
(Operational around November 2024)
Bommanahalli
towards Bommasandra
Terminus
Blue Line
(Future Service around 2026)
HSR Layout
towards Krishnarajapura or KIAL Terminals
Route map
Legend
Rashtreeya Vidyalaya Road
Green Line
Ragigudda
Jayadeva Hospital
Pink Line
Under Construction
BTM Layout
Central Silk Board
Blue Line
Under Construction
Bommanahalli
Hongasandra
Kudlu Gate
Singasandra
Hosa Road
Beratena Agrahara
Konappana Agrahara
Electronic City
Huskur Road
Hebbagodi
Hebbagodi Depot (U/C)
Bommasandra
Legend
Central Silk Board
Yellow Line
Under Construction
HSR Layout
Agara
Ibbaluru
Bellandur
Kadubeesanahalli
Kodibeesanahalli
Marathahalli
ISRO
Doddanekundi
DRDO Sports Complex
Sarasvathi Nagar
Krishnarajapuram
Purple Line
Baiyappanahalli Depot (U/C)
Kasturi Nagar
Horamavu
HRBR Layout
Kalyan Nagar
HBR Layout
Nagawara
Pink Line
Under Construction
Veerannapalya
Kempapura
Orange Line
Proposed
Hebbal
Kodigehalli
Jakkur Cross
Jakkur Plantation (No Scope)
Yelahanka
Bagalur Cross
Bettahalasuru (No Scope)
Chikkajala
Doddajala
Doddajala Depot (U/C)
Airport City
KIAL Terminals
Location
Preview warning: Page using Template:Infobox station with deprecated parameter "ADA". Replace with "accessible".
Central Silk Board is an upcoming important elevated interchange metro station on the North-South corridor of the Yellow Line and Blue Line[1] of Namma Metro in Bangalore, India. This metro station serves the Central Silk Board area.
As per latest reports, the Yellow Line is stated to be operational around November 2024 due to the upcoming Indian general election which will occur during April–May 2024 and lots of trial runs along with more trainsets are required for commencement of operations [2][3][4][5][6] (under Blue Line, around 2026).
^"Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
^"Bengaluru Metro's Yellow Line to Open in November 2024, Tejasvi Surya Shares Key Details". TimesNow. 9 March 2024. Retrieved 10 March 2024.
^DHNS. "Bengaluru metro's Yellow Line to start only after general elections". Deccan Herald. Retrieved 14 December 2023.
^"RV Road-Bommasandra Metro stretch to open by April: CM Siddaramaiah". The New Indian Express. Retrieved 11 November 2023.
^"Metro Yellow Line to E-City & extended Green Line to open by April 2024: CM Siddramaiah". The Times of India. 21 October 2023. ISSN 0971-8257. Retrieved 11 November 2023.
^"Bengaluru metro's yellow line connecting Bommasandra to Silk Board to open by February 2024, says MP Tejasvi Surya". Hindustan Times. 6 October 2023. Retrieved 11 November 2023.
and 28 Related for: Central Silk Board metro station information
CentralSilkBoard is an upcoming important elevated interchange metrostation on the North-South corridor of the Yellow Line and Blue Line of Namma Metro...
Anjanapura Township side CentralSilkBoardmetrostation List of Namma Metrostations Transport in Karnataka List of metro systems List of rapid transit...
metro station is the Electronic City Elevated Expressway connecting CentralSilkBoard to Electronic City, including the Infosys campus and Wipro Floating...
Transport Corporation Raggigudda-SilkBoard Flyover Portals: Bangalore Trains Transport Engineering "Bengaluru Metro's Yellow Line to Open in November...
Hebbal in the north and SilkBoard in the south. This metrostation is slated to become operational around June 2026. Station Layout - To Be Confirmed...
from Ragigudda to CentralSilkBoard Level 4 → Yellow Line Platforms Level 5 → Pink Line Platforms Bangalore List of Namma Metrostations Transport in Karnataka...
areas like Agara, SilkBoard, Sarjapura and Madiwala. This metrostation is slated to become operational around June 2026. Station Layout - To Be Confirmed...
through two other interchange stations: Jayadeva Hospital station, where it crosses the Pink Line; and CentralSilkBoardstation, where the Blue Line will...
important elevated metrostation on the North-South corridor of the Blue Line of Namma Metro in Bangalore, India. This metrostation will serve the main...
ISSN 0971-8257. Retrieved 11 November 2023. "Bengaluru metro's yellow line connecting Bommasandra to SilkBoard to open by February 2024, says MP Tejasvi Surya"...
northern terminal metrostation on the North-South corridor of the Pink Line and upcoming elevated metrostation on the Blue Line of Namma Metro in Bangalore...
ISSN 0971-8257. Retrieved 11 November 2023. "Bengaluru metro's yellow line connecting Bommasandra to SilkBoard to open by February 2024, says MP Tejasvi Surya"...
ISSN 0971-8257. Retrieved 11 November 2023. "Bengaluru metro's yellow line connecting Bommasandra to SilkBoard to open by February 2024, says MP Tejasvi Surya"...
operational 65 metrostations of Namma Metro as of October 2023, there are 56 elevated stations, 8 underground stations and 1 at-grade station. The first...
ISSN 0971-8257. Retrieved 11 November 2023. "Bengaluru metro's yellow line connecting Bommasandra to SilkBoard to open by February 2024, says MP Tejasvi Surya"...
metrostation on the Yellow Line of the Namma Metro serving the Hebbagodi suburb. In 2020, Biocon Group signed an agreement with the Bangalore Metro Rail...
ISSN 0971-8257. Retrieved 11 November 2023. "Bengaluru metro's yellow line connecting Bommasandra to SilkBoard to open by February 2024, says MP Tejasvi Surya"...
interchange metrostation on the North-South corridor of the Green Line and the East-West corridor of the upcoming Yellow Line of Namma Metro serving the...
ISSN 0971-8257. Retrieved 11 November 2023. "Bengaluru metro's yellow line connecting Bommasandra to SilkBoard to open by February 2024, says MP Tejasvi Surya"...
ISSN 0971-8257. Retrieved 11 November 2023. "Bengaluru metro's yellow line connecting Bommasandra to SilkBoard to open by February 2024, says MP Tejasvi Surya"...
ISSN 0971-8257. Retrieved 11 November 2023. "Bengaluru metro's yellow line connecting Bommasandra to SilkBoard to open by February 2024, says MP Tejasvi Surya"...
ISSN 0971-8257. Retrieved 11 November 2023. "Bengaluru metro's yellow line connecting Bommasandra to SilkBoard to open by February 2024, says MP Tejasvi Surya"...
Ragigudda is an upcoming elevated metrostation on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India. Located in between...
terminal metrostation on the East-West corridor of the Blue Line of Namma Metro in Bangalore, India. This will be an important metrostation which will...
elevated metrostation on the East-West corridor of the Purple Line as well as the South-North corridor of the upcoming Blue Line of Namma Metro in Bengaluru...
upcoming elevated metrostation on the North-South corridor of the Blue Line of Namma Metro in Bangalore, India. This metrostation serves mainly Embassy...