Side platform Platform-1 → Central Silk Board / Rashtreeya Vidyalaya Road Platform-2 → Bommasandra Platform numbers (TBC)
Tracks
2 (TBC)
Construction
Structure type
Elevated, Double track
Platform levels
(TBC)
Parking
(TBC)
Accessible
(TBC)
Other information
Status
Under Construction
Station code
(TBC)
History
Opening
November 2024; 4 months' time (November 2024)(TBC)
Electrified
750 V DC third rail (TBC)
Previous names
Hebbagodi
Services
Preceding station
Namma Metro
Following station
Huskur Road
towards Central Silk Board or Rashtreeya Vidyalaya Road
Yellow Line
(Operational around November 2024)
Bommasandra
Terminus
Route map
Legend
Rashtreeya Vidyalaya Road
Green Line
Ragigudda
Jayadeva Hospital
Pink Line
Under Construction
BTM Layout
Central Silk Board
Blue Line
Under Construction
Bommanahalli
Hongasandra
Kudlu Gate
Singasandra
Hosa Road
Beratena Agrahara
Konappana Agrahara
Electronic City
Huskur Road
Hebbagodi
Hebbagodi Depot (U/C)
Bommasandra
Location
Biocon Hebbagodi (formerly known as Hebbagodi) is an upcoming elevated metro station on the Yellow Line of the Namma Metro serving the Hebbagodi suburb.
In 2020, Biocon Group signed an agreement with the Bangalore Metro Rail Corporation Ltd to contribute ₹65 crore towards the construction of the metro station and donated land worth ₹30 crore for the project. Consequently, Biocon obtained the naming rights for the station for 30 years, and the station was renamed from Hebbagodi to Biocon Hebbagodi.[1][2]
This will also be the depot for all the Yellow Line Namma Metro trains for maintenance purposes. As per latest reports, the Yellow Line is stated to be operational around November 2024 due to the upcoming Indian general election which will occur during April–May 2024 and lots of trial runs along with more trainsets are required for commencement of operations. [3][4][5][6][7]
^"'Biocon Hebbagodi' station name to remain same: BMRCL MD". The New Indian Express. 11 January 2024. Retrieved 2 May 2024.
^"Biocon to fund Hebbagodi metro station". Deccan Herald. Retrieved 2 May 2024.
^"Bengaluru Metro's Yellow Line to Open in November 2024, Tejasvi Surya Shares Key Details". TimesNow. 2024-03-09. Retrieved 2024-03-10.
^DHNS. "Bengaluru metro's Yellow Line to start only after general elections". Deccan Herald. Retrieved 2023-12-14.
^"RV Road-Bommasandra Metro stretch to open by April: CM Siddaramaiah". The New Indian Express. Retrieved 2023-11-11.
^"Metro Yellow Line to E-City & extended Green Line to open by April 2024: CM Siddramaiah". The Times of India. 2023-10-21. ISSN 0971-8257. Retrieved 2023-11-11.
^"Bengaluru metro's yellow line connecting Bommasandra to Silk Board to open by February 2024, says MP Tejasvi Surya". Hindustan Times. 2023-10-06. Retrieved 2023-11-11.
and 22 Related for: Hebbagodi metro station information
Biocon Hebbagodi (formerly known as Hebbagodi) is an upcoming elevated metrostation on the Yellow Line of the Namma Metro serving the Hebbagodi suburb...
operational 65 metrostations of Namma Metro as of October 2023, there are 56 elevated stations, 8 underground stations and 1 at-grade station. The first...
Roopena Agrahara) is an upcoming elevated metrostation on the north–south corridor of the Yellow Line of Namma Metro in Bangalore, India. As per latest reports...
interchange metrostation on the North-South corridor of the Yellow Line and Pink Line of Namma Metro in Bangalore, India. This metrostation will be the...
Electronic City is an upcoming elevated metrostation on the Yellow Line of the Namma Metro in southern Bengaluru, India, being built to serve the Information...
Singasandra is an upcoming elevated metrostation on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India. As per latest reports...
Kudlu Gate is an upcoming elevated metrostation on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India. As per latest reports...
BTM Layout is an upcoming elevated metrostation on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India. As per latest reports...
interchange metrostation on the North-South corridor of the Yellow Line and Blue Line of Namma Metro in Bangalore, India. This metrostation serves the...
Hosa Road is an upcoming elevated metrostation on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India. As per latest reports...
Agrahara is an upcoming important elevated metrostation on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India. As per latest reports...
terminal metrostation on the Yellow Line of the Namma Metro serving the Bommasandra neighbourhood with its Industrial Area and Heelalige railway station connected...
interchange metrostation on the North-South corridor of the Green Line and the East-West corridor of the upcoming Yellow Line of Namma Metro serving the...
Veerasandra) is an upcoming elevated metrostation on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India. As per latest reports...
Beratena Agrahara is an upcoming elevated metrostation on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India. As per latest reports...
interchange metrostation on the North-South corridor of the Blue Line, Orange Line and Red Line of Namma Metro in Bengaluru, India. This metrostation serves...
Ragigudda is an upcoming elevated metrostation on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India. Located in between...
Garvebhavi Palya) is an upcoming elevated metrostation on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India. As per latest reports...
would have grown as a village. Like this we have Adugodi (ಆಡುಗೋಡಿ) and Hebbagodi (ಹೆಬ್ಬಗೋಡಿ). Of course, the place names symbolises our proud heritage...
and parks. It is near APMC Market at Singena Agrahara, and comes under Hebbagodi City Municipal Council (CMC) and is within BMRDA jurisdiction. St. Francis...