The Hamiltonhill Branch was constructed by the Caledonian Railway in 1894 with the intention to provide a large goods yard at Hamiltonhill on the Forth and Clyde Canal. There was also a branch to the Saracen Foundry but this had to be closed as it was in breach of an agreement with the North British Railway.
and 28 Related for: Hamiltonhill Branch information
The HamiltonhillBranch was constructed by the Caledonian Railway in 1894 with the intention to provide a large goods yard at Hamiltonhill on the Forth...
Dundas to the south. To the west of Hamiltonhill is a nature reserve bordering the Forth and Clyde Canal's Glasgow Branch section (with Firhill Stadium on...
the City Union Line was extended to Springburn in 1871, and the HamiltonhillBranch Line opened in 1894. Initially located outside the Glasgow boundary...
of the Fraserburgh branch, and in fact the company had considered abandoning it. However it decided to alter the route, branching from the Peterhead line...
Street terminus, on the north-east side of the city. A branch from Balornock to Hamiltonhill had been promoted in 1883; intended to serve iron foundries...
Inveresk; a short mineral branch to Tranent, opened in 1849; the North Berwick branch from Drem, opened in 1850; the Dunse branch line, opened in 1849; Dunse...
line from Edinburgh to Berwick-upon-Tweed with a 4-mile-50-chain (7.4 km) branch to Haddington. The company's chairman and founder was John Learmonth, the...
built a branch to Ballachulish, which included the construction of Connel Bridge, a remarkable bridge at Connel over Loch Etive. The branch opened in...
its network and reached Edinburgh and Aberdeen, with a dense network of branch lines in the area surrounding Glasgow. It was absorbed into the London,...
agreement.[page needed] The Edinburgh and Glasgow Railway opened its Shieldhill branch on 28 August 1847. This ran from the Slamannan Railway at Causewayend, heading...
Glasgow in Scotland, was developed by a company known as The Lesmahagow Branches (later known as The Lesmahagow Guarantee Company). It was not an independent...
network have been electrified. Many of the earlier mineral workings, and branches constructed to serve them, have ceased, and many local passenger stations...
Coalburn Branch was a branch line constructed by the Caledonian Railway from Lesmahagow railway station to Bankend railway station. It was the main branch of...
significant part of the traffic. The first section to open was the Campsie branch of the Edinburgh and Glasgow Railway, to Lennoxtown, in 1848; this became...
053, and sanctioning the Leith Branch. The third Act, on 27 June 1834, authorised a further £54,875 to build branches to Fisherrow, and "allowing a certain...
connecting Maryhill in the north west of the city with Dalmarnock, on a short branch from Rutherglen on the main line, in the south east. It would run through...
part of the London, Midland and Scottish Railway. Although its shorter branches have closed, former Highland Railway lines remain open from Inverness to...
The North Berwick Branch is a short railway branch line built by the North British Railway to connect North Berwick, in East Lothian, Scotland to the East...
opened in 1840. The Joint Committee, which controlled the line, built a branch to Govan and later to Cessnock Dock, and then Prince's Dock. With the passing...
Line. The North British Railway had opened its Bridgeton terminus, on a branch from High Street, and a short spur was proposed to enable eastbound trains...
and Glasgow Railway near Castlecary. The line opened in 1848 including a branch to South Alloa. The line immediately became part of the forming trunk railway...
The Darvel Branch was an extension of the former Glasgow, Paisley, Kilmarnock and Ayr Railway in Scotland built by the Glasgow and South Western Railway...
The Fortrose Branch, also known as the Black Isle Railway, was a railway branch line serving Fortrose in the Black Isle, in the north of Scotland. It was...
The Leadhills and Wanlockhead Light Railway was a short branch railway built in Scotland to serve mining settlements, high in the Lowther Hills, connecting...
company in Scotland operating a main line from Perth to Aberdeen, with branches to Kirriemuir, Brechin and Montrose. It was created when the Aberdeen Railway...
Tayport ferry terminal has closed, and some sections of the Dunfermline branch have closed. The natural barrier of the Firth of Forth had for centuries...
loss." The Wick line stopped at the town boundary of Wick, and the Thurso branch at the edge of town, without giving access to Wick harbour or Scrabster...
line CR Cleland and Midcalder CR Main Line CR Douglas Branch CR Hamilton Branch CR HamiltonhillBranch CR The Switchback Independent lines worked by the Caledonian...