Great Western Main Line upgrade
The station at Goring & Streatley with the new footbridge and electrification in progress

In the 2010s Network Rail modernised the Great Western Main Line, the South Wales Main Line, and other associated lines. The modernisation plans were announced at separate times but their implementation overlapped in the 2010s.

The work included electrification, resignalling, new rolling stock and station upgrades. The programme began in June 2010 and at that time was due to end in 2017.[1] The project was completed in 2020, allowing electric services to run between London Paddington and Cardiff.[2]

The project had several delays.[3] Four sections were deferred indefinitely:[3][4]

  • Oxford to Didcot Parkway
  • Bristol Parkway to Bristol Temple Meads
  • Thingley Junction, near Chippenham, to Bath Spa and Bristol Temple Meads
  • Thames Valley branches to Henley and Windsor[5][6]

The Cardiff to Swansea electrification was cancelled in 2017.[7]

Under the Intercity Express Programme (IEP), 21 electric Class 801 trains were ordered as replacements for the ageing InterCity 125 diesels. In May 2016 it was confirmed that the new trains would be built as 'bi-mode' Class 800s instead, meaning they can run on either diesel power or electric overhead wire.[8]

  1. ^ "Modernising the Great Western" (PDF). Network Rail. June 2011. Archived from the original (PDF) on 13 April 2013. Retrieved 24 August 2016.
  2. ^ "Network Rail completes Great Western electrification". International Railway Journal. 5 June 2020. Archived from the original on 18 June 2021. Retrieved 8 May 2021.
  3. ^ a b Cite error: The named reference bbc-20161108 was invoked but never defined (see the help page).
  4. ^ Paul Maynard (8 November 2016). "Written statement to Parliament, Rail update: rail investment in the Great Western route". gov.uk. Archived from the original on 8 November 2016. Retrieved 8 November 2016.
  5. ^ Topham, Gwyn (21 October 2015). "Cost of Great Western mainline electrification project triples to £2.8bn". The Guardian. London. Archived from the original on 16 July 2021. Retrieved 27 December 2016.
  6. ^ "Great Western electrification projects deferred". Railway Gazette International. London. 8 November 2016. Archived from the original on 28 December 2016. Retrieved 27 December 2016.
  7. ^ Barry, Sion (20 July 2017). "UK Government scraps rail electrification plans to Swansea". Wales On Line. Archived from the original on 14 August 2017. Retrieved 14 August 2017.
  8. ^ Wilkinson, Michael (8 November 2016). "£3bn plans to electrify Great Western rail route to be delayed by six years". The Telegraph. London. Archived from the original on 28 December 2016. Retrieved 28 December 2016.

and 21 Related for: Great Western Main Line upgrade information

Request time (Page generated in 1.1294 seconds.)

Great Western Main Line upgrade

Last Update:

In the 2010s Network Rail modernised the Great Western Main Line, the South Wales Main Line, and other associated lines. The modernisation plans were announced...

Word Count : 7629

Great Western Main Line

Last Update:

The Great Western Main Line (GWML) is a main line railway in England that runs westwards from London Paddington to Bristol Temple Meads. It connects to...

Word Count : 4714

Midland Main Line upgrade

Last Update:

The Midland Main Line upgrade is an ongoing upgrade to the Midland Main Line (MML), a major railway line in the United Kingdom. There have been a number...

Word Count : 3923

Chiltern Main Line

Last Update:

the Great Western Railway's main line from London Paddington to Birmingham Snow Hill, Wolverhampton Low Level and Birkenhead Woodside. Most main line services...

Word Count : 4208

Acton Main Line railway station

Last Update:

Acton Main Line is a railway station on the Great Western Main Line in Acton, west London, England. Located 4 miles 21 chains (6.9 km) down the line from...

Word Count : 1729

Midland Main Line

Last Update:

services using parts of the line. The Midland Main Line is undergoing a major upgrade of new digital signalling and full line electrification from London...

Word Count : 4396

Ealing Broadway station

Last Update:

Elizabeth line services on the National Rail Great Western Main Line. On the Underground, it is one of three western termini of the District line, the next...

Word Count : 2481

London Paddington station

Last Update:

terminus of services provided by the Great Western Railway and its successors since 1838. Much of the main line station dates from 1854 and was designed...

Word Count : 6114

West Coast Main Line

Last Update:

Railway East Coast Main Line Great Central Main Line Highland Main Line Irish Sea tunnel Midland Main Line Midland Main Line railway upgrade Portpatrick Railway...

Word Count : 8041

Great Western Railway

Last Update:

The Great Western Railway (GWR) was a British railway company that linked London with the southwest, west and West Midlands of England and most of Wales...

Word Count : 11419

Swindon railway station

Last Update:

Swindon railway station is on the Great Western Main Line in South West England, serving the town of Swindon, Wiltshire. The station is 77 miles 23 chains...

Word Count : 2215

Rail transport in Wales

Last Update:

Central railway station, which was electrified as part of the Great Western Main Line upgrade, and was completed in 2020. Plans to extend the electrification...

Word Count : 3043

Elizabeth line

Last Update:

Great Western Main Line west of Paddington station to Abbey Wood and via Whitechapel to the Great Eastern Main Line near Stratford; along the Great Western...

Word Count : 5065

Tilehurst railway station

Last Update:

on the Great Western Main Line between Reading to the east and Pangbourne to the west; it is served by local services operated by Great Western Railway...

Word Count : 641

Transpennine Route Upgrade

Last Update:

21st-century modernisation of the Great Western Main Line Felixstowe–Nuneaton railway upgrade History of rail transport in Great Britain 1995 to date List of...

Word Count : 6921

Western Railway zone

Last Update:

operated by Western Railway zone are as follows: New Delhi–Mumbai main line Ahmedabad–Mumbai main line Ahmedabad–Delhi main line Jaipur–Ahmedabad line Udhna–Jalgaon...

Word Count : 2315

East Coast Main Line

Last Update:

Newcastle. The line is a key transport artery on the eastern side of Great Britain running broadly parallel to the A1 road. The main line acts as a 'spine'...

Word Count : 8424

Cardiff Central railway station

Last Update:

improvements, and resignalling along parts of the Great Western Main Line and the South Wales Main Line. The changes would see the retirement of InterCity...

Word Count : 3929

East West Rail

Last Update:

the Marston Vale line from Bletchley to Bedford. The existing Cherwell Valley line will form a link to the Great Western Main Line at Didcot Parkway...

Word Count : 8285

Golden Valley line

Last Update:

the remainder of the line, including the tunnel at Sapperton, was completed. The line diverges from the Great Western Main Line at Swindon. After passing...

Word Count : 819

Crossrail

Last Update:

Elizabeth line, that crosses the capital from suburbs on the west to east and connects two major railway lines terminating in London: the Great Western Main Line...

Word Count : 9116

PDF Search Engine © AllGlobal.net