Transpennine Route Upgrade information


Map of the Trans-Pennine Routes. The TRU relates to the Huddersfield line, shown in light blue.
Calder Valley line for comparison

The Transpennine Route Upgrade (TRU) is a major investment being made in the railway between York and Manchester via Leeds and Huddersfield – the 76 miles (122 km) northern route over the Pennines,[1] most of which is also known as the Huddersfield line. As of 2023, the line is heavily used but is slow and lacks capacity.[2] It has Victorian infrastructure, covers difficult terrain including the 3-mile (4.8 km) Standedge Tunnel, and has poor access roads.

Since the rejection of Northern Powerhouse Rail's aspiration for a new high speed line within Yorkshire, it has been questioned whether an upgraded Huddersfield line will provide sufficient capacity for the region's needs.[3] However, the Integrated Rail Plan for the North and Midlands (IRP) that was announced in November 2021,[4][5] did include full electrification between Manchester and York,[6] and subsequently W12 loading gauge to accommodate 2.9 m × 2.6 m (9.5 ft × 8.5 ft) refrigerated shipping containers throughout has been promised.[7][8] The whole £9–11.5 billion programme has been defined as phase one of Northern Powerhouse Rail, and is claimed to be the biggest infrastructure project in the UK.[9] It consists of a succession of sub-projects[10] designed to give incremental benefits to rail users of a period of time, with an anticipated overall completion date of between 2036 and 2041.[11][12] In Manchester, the project interfaces with the Northern Hub.

There are three transpennine rail lines that connect Lancashire and Yorkshire. To the south of the Huddersfield line is the Hope Valley line which traverses even more difficult terrain including the 3.5-mile (5.6 km) Totley Tunnel, and which in 2021 was allocated £137 million investment to improve capacity and connectivity between Manchester and Sheffield.[13][14] To the north the Calder Valley line joins Manchester and Leeds via Rochdale and Bradford (where trains have to reverse). This line has been strengthened to allow its use as a diversionary route while the Huddersfield line is upgraded.[15]

Reopening the Woodhead line as a potential alternative Pennine crossing was ruled out early on.[16] The Skipton–East Lancashire Rail Action Partnership is a campaign that is seeking the reopening of the 12-mile (19 km) railway line that used to run between the Lancashire town of Colne and the Yorkshire town of Skipton. This could provide an additional transpennine route for both a commuter service and a relief transpennine freight route.[17][18]

  1. ^ "Coming soon Transpennine Railway Upgrade". Transpennine Route Upgrade. Archived from the original on 25 February 2022. Retrieved 25 February 2022.
  2. ^ "Plans to improve the Manchester – Leeds – York route are advancing". Modern Railways. 20 May 2021. Archived from the original on 27 December 2021. Retrieved 27 December 2021.
  3. ^ "Transpennine upgrade". Network Rail. Archived from the original on 1 February 2021. Retrieved 4 February 2021.
  4. ^ Department for Transport (18 November 2021). Integrated Rail Plan for the North and Midlands (PDF). Department for Transport. ISBN 978-1-5286-2947-8. Archived (PDF) from the original on 18 November 2021. Retrieved 18 November 2021.
  5. ^ Media, Insider. "Trans-Pennine Route Upgrade project moving to next phase". Insider Media Ltd. Archived from the original on 17 May 2022. Retrieved 22 March 2021.
  6. ^ "Northern Powerhouse Rail" (PDF). Parliament UK. 25 August 2022.
  7. ^ Abbott, James (February 2023). "2023: Key year for TRU". Modern Railways. No. 893. pp. 56–61.
  8. ^ "Freight RUS" (PDF). Archived from the original (PDF) on 2 March 2012. Retrieved 16 May 2009.
  9. ^ "Rail Technology Magazine August September 2022 Page 78". mag.railtechnologymagazine.com. Retrieved 31 August 2022.
  10. ^ Abbott 2023, pp. 56–61.
  11. ^ "The Transpennine Route Upgrade Programme – National Audit Office (NAO) Press release". National Audit Office. 19 July 2022. Retrieved 20 July 2022.
  12. ^ "NAO Transpennine Route Upgrade summary" (PDF). NAO UK government.
  13. ^ "Government invests to transform journeys on Hope Valley line". GOV.UK. 11 March 2021. Archived from the original on 17 May 2022. Retrieved 12 January 2022.
  14. ^ Abbott, James (20 May 2021). "Hope Valley Upgrade Third Express Path Per Hour". Modern Railways.
  15. ^ "Calder Valley rail route to keep Transpennine passengers moving this month". Network Rail Media Centre. Retrieved 5 August 2022.
  16. ^ "Trans-Pennine Woodhead rail tunnels not to reopen". BBC News. 11 November 2013. Archived from the original on 2 January 2021. Retrieved 4 February 2021.
  17. ^ "The Skipton-Colne Rail Corridor: The New Transpennine Northern Link" (PDF). Skipton–East Lancashire Rail Action Partnership. November 2020. Retrieved 18 May 2022.
  18. ^ "Campaign to reopen railway between Colne and Skipton intensifies". Rail Insider. 28 May 2021.

and 27 Related for: Transpennine Route Upgrade information

Request time (Page generated in 1.2928 seconds.)

Transpennine Route Upgrade

Last Update:

The Transpennine Route Upgrade (TRU) is a major investment being made in the railway between York and Manchester via Leeds and Huddersfield – the 76 miles...

Word Count : 6921

TransPennine Express

Last Update:

as part of the Transpennine Route Upgrade (TRU). TransPennine Trains took over all services operated by its predecessor, TransPennine Express, on 28 May...

Word Count : 1565

Huddersfield line

Last Update:

though the Transpennine upgrade work covers the additional section to York which accounts for 76 miles (122 km). From spring 2019, the whole route is being...

Word Count : 1956

Heaton Lodge Junction

Last Update:

Freight operators also use the section of line. As part of the Transpennine Route Upgrade, the junction will be remodelled so that the line between Huddersfield...

Word Count : 1557

Cross Country Route

Last Update:

between Leeds and York has electrification planned as part of the Transpennine Route Upgrade, which itself is part of the Integrated Rail Plan for the North...

Word Count : 1017

Tru

Last Update:

Union Thompson Rivers University, in British Columbia, Canada Transpennine Route Upgrade, between Manchester and York Transuranic waste Tru by Hilton,...

Word Count : 225

Huddersfield Viaduct

Last Update:

Viaduct is the longest in the Kirklees district. As part of the Transpennine Route Upgrade (TRU), the viaduct will again have four lines along the whole...

Word Count : 1877

British Rail Class 802

Last Update:

businesstraveller.com. 5 January 2022. "Full electrification in scope as Transpennine Route Upgrade makes progress". railwaygazette.com. 20 July 2022. "Our named...

Word Count : 3365

Shipley TCC

Last Update:

The decision to build a depot on the site was prompted by the Transpennine Route Upgrade (TRU), which in the late 2020s, will be working on the section...

Word Count : 858

Castleford railway station

Last Update:

December 2023 to accommodate extra services as part of the Transpennine Route Upgrade project. The route from Church Fenton continues to be used for freight...

Word Count : 1397

Integrated Rail Plan

Last Update:

HS2, Northern Powerhouse Rail, the Transpennine Route Upgrade, the East Coast and Midland Main Line railway upgrades, the Midlands Rail Hub and the Traction...

Word Count : 4395

List of proposed railway electrification routes in Great Britain

Last Update:

(IRP) confirmed this. The electrification of this part of the Transpennine Route Upgrade is underway and due for completion in 2025. It was announced in...

Word Count : 3868

Crossrail 2

Last Update:

Budget 2017, HM Treasury, 22 November 2017 Grayling: progress on Transpennine route upgrade and Crossrail 2 to advance in lockstep, Department for Transport...

Word Count : 4482

Huddersfield railway station

Last Update:

at the station in May 2013. Work is underway on Network Rail's Transpennine Route Upgrade project, which will see electrification of the Huddersfield Line...

Word Count : 1821

Church Fenton railway station

Last Update:

(pick-up only) en route to Moorthorpe (there now being no rail service to Sheffield via Pontefract on Sundays). The Transpennine Route Upgrade includes electrification...

Word Count : 939

Ulleskelf railway station

Last Update:

the Transpennine Route Upgrade, it was confirmed electrification of the line between York and Church Fenton would happen along with other upgrades. Further...

Word Count : 853

Andrew Stephenson

Last Update:

State at the Department for Transport, responsible for HS2, the Transpennine Route Upgrade and Northern Powerhouse Rail projects. His appointment came after...

Word Count : 3218

Midland Main Line upgrade

Last Update:

electrification routes in Great Britain North West England electrification schemes Overhead line Railway electrification in Scotland TransPennine Route Upgrade West...

Word Count : 3956

NorthOnTrack

Last Update:

through the city. The proposed route involves the connection of the Chat Moss line to the Transpennine Route Upgrade including two new stations: Salford...

Word Count : 1062

Greenfield railway station

Last Update:

National Rail timetable, December 2023 "Coming soon Transpennine Railway Upgrade". Transpennine Route Upgrade. Retrieved 25 February 2022. Wikimedia Commons...

Word Count : 842

North West England electrification schemes

Last Update:

Victoria to Miles Platting. This section of line is now part of the Transpennine Route Upgrade though. Most of the schemes first planned in the 2010 timeframe...

Word Count : 3108

Stalybridge railway station

Last Update:

December 2008 the new entrance was completed. As part of the Transpennine Route Upgrade the station, platforms and railway tracks have been reworked in...

Word Count : 2069

Northern Hub

Last Update:

onwards to Leeds. This section is now officially part of the Transpennine Route Upgrade project. Northern Hub is expected to deliver the following improvements:...

Word Count : 3441

Railway electrification in Scotland

Last Update:

electrification schemes Overhead line Transpennine Route Upgrade Transport in Scotland West Coast Main Line route modernisation Dennis, Gareth (22 May...

Word Count : 2461

First TransPennine Express

Last Update:

First TransPennine Express was a British train operating company jointly owned by FirstGroup and Keolis which operated the TransPennine Express franchise...

Word Count : 2856

Hope Valley line

Last Update:

Sidings, where it is taken over by Freightliner. Great Rocks Line Transpennine Route Upgrade Joy 1984, p. 171. Joy 1984, p. 267. Body, Geoffrey (1986). Railways...

Word Count : 1815

Northern Powerhouse Rail

Last Update:

Line Manpool Northern Hub Northern Powerhouse The Northern Way TransPennine Route Upgrade UK Ultraspeed Woodhead line "Northern Powerhouse Rail" (PDF)....

Word Count : 4860

PDF Search Engine © AllGlobal.net