46°50′09″N8°38′47″E / 46.83586°N 8.64647°E / 46.83586; 8.64647 (north portal)
46°22′22″N8°55′31″E / 46.37267°N 8.92535°E / 46.37267; 8.92535 (south portal)
Status
Interrupted since 10 August 2023[1] (Active since 11 December 2016)[2]
System
Swiss Federal Railways (SBB CFF FFS)
Crosses
Alps (western Glarus Alps and central Lepontine Alps at the eastern Gotthard Massif)
Start
Erstfeld, canton of Uri (north, 460 m or 1,510 ft)
End
Bodio, canton of Ticino (south, 312 m or 1,024 ft)
Operation
Work begun
4 November 1999[3]
Opened
1 June 2016[4]
Owner
SBB Infrastructure
Operator
SBB CFF FFS
Traffic
Railway
Character
Passenger and freight
Technical
Length
57.09 km (35.5 mi); total 151.840 km (94.3 mi) for all tunnels, shafts and passages[5]
Line length
57.104 km (35.5 mi) (east tunnel)
57.017 km (35.4 mi) (west tunnel)[5]
No. of tracks
2 single-track tubes[5]
Track gauge
1,435 mm (4 ft 8+1⁄2 in) (standard gauge)
Electrified
15 kV 16.7 Hz
Operating speed
Passenger (service):
200 km/h (125 mph)
Passenger (if delay):
230 km/h (145 mph)[6][7][8]
Max speed (technical):
250 km/h (155 mph)
Freight:
100 km/h (62 mph)
Highest elevation
549 m (1,801 ft)[5]
Lowest elevation
312 m (1,024 ft) (south portal)[5]
Tunnel clearance
5.20 m (17 ft 1 in) from top of rail to overhead conductor[5]
Grade
max 4.055‰ (north)
max 6.76‰ (south)[5]
Route map
The Gotthard Base Tunnel (GBT; German: Gotthard-Basistunnel, Italian: Galleria di base del San Gottardo, Romansh: Tunnel da basa dal Sogn Gottard) is a railway tunnel through the Alps in Switzerland. It opened in June 2016 and full service began the following December.[9][10] With a route length of 57.09 km (35.5 mi),[5] it is the world's longest railway and deepest traffic tunnel[11][12][13][note 1] and the first flat, low-level route through the Alps.[14] It lies at the heart of the Gotthard axis and constitutes the third tunnel connecting the cantons of Uri and Ticino, after the Gotthard Tunnel and the Gotthard Road Tunnel.
The GBT consists of a large complex with, at its core, two single-track tunnels connecting Erstfeld (Uri) with Bodio (Ticino) and passing below Sedrun (Grisons).
It is part of the New Railway Link through the Alps (NRLA) project, which also includes the Ceneri Base Tunnel further south (opened on 3 September 2020) and the Lötschberg Base Tunnel on the other main north–south axis.
It is referred to as a "base tunnel" since it bypasses most of the existing vertex line, the Gotthard railway line, a winding mountain route opened in 1882 across the Saint-Gotthard Massif, which was operating at its capacity before the opening of the GBT.
The new base tunnel establishes a direct route usable by high-speed rail and heavy freight trains.[15]
The main purpose of the Gotthard Base Tunnel is to increase local transport capacity through the Alpine barrier, especially for freight on the Rotterdam–Basel–Genoa corridor, and more specifically to shift freight volumes from trucks to freight trains. This both significantly reduces the danger of fatal road crashes involving trucks, and reduces the environmental damage caused by heavy trucks. The tunnel also provides a faster connection between the canton of Ticino and the rest of Switzerland, as well as between northern and southern Europe, cutting the Basel/Zürich–Lugano–Milan journey time for passenger trains by one hour (and from Lucerne to Bellinzona by 45 minutes).[16]
After 64 percent of Swiss voters accepted the NRLA project in a 1992 referendum, the first preparatory and exploratory work began in 1996. Construction began in November 1999 at Amsteg.[17] Drilling operations were completed in March 2011. The final cost is projected as CHF 9.560 billion.[18]
^"Gotthard Base Tunnel Derailment: everything you need to know for your trip". Berne, Switzerland: SBB CFF FFS. 16 August 2023.
^"Commissioning". Lucerne, Switzerland: AlpTransit Gotthard AG. Retrieved 12 May 2016.
^"Construction begins". Bern, Switzerland: Swiss Federal Archives SFA, Swiss Federal Office of Transport FOT, Swiss Confederation. 2016. Retrieved 4 July 2016.
^"155 days until opening". Lucerne, Switzerland: AlpTransit Gotthard AG. Retrieved 29 December 2015.
^ abcdefgh"Project data – raw construction Gotthard Base Tunnel" (PDF). Lucerne, Switzerland: AlpTransit Gotthard AG. 1 June 2016. Retrieved 15 December 2016.
^Axe nord-sud du Saint-Gothard (SBB/CFF website).
^Cite error: The named reference SBBoperation was invoked but never defined (see the help page).
^Giruno (SBB/CFF website).
^"Über und durch den Gotthard – eine Zeitreise durch die Jahrhunderte" (in German). Zürich, Switzerland: SRF Swiss Radio and Television. 1 June 2016. Retrieved 4 June 2016.
^"World's longest and deepest rail tunnel to open in Switzerland". BBC News. June 2016. Retrieved 1 June 2016.
^"Gotthard- und CeneriBasistunnel: die neue Gotthard-Bahn nimmt Gestalt an" (PDF). Geomatik Schweiz. Archived from the original (PDF) on 4 March 2016. Retrieved 8 June 2015.
^"Wer hat die grösste Röhre?" [Who has the longest tube?]. Tages-Anzeiger (graphical animation) (in German). Zürich, Switzerland. 14 April 2016. Retrieved 11 May 2016.
^"Gotthard tunnel: World's longest and deepest rail tunnel opens in Switzerland". BBC News. 1 June 2016. Retrieved 1 June 2016.
^Yücel Erdem, Tülin Solak, Underground Space Use. Analysis of the Past and Lessons for the Future, CRC Press, 2005 (p. 485)
^Malins, Richard (December 2010). "Crossing the Alps". Modern Railways. London. pp. 79–81. ISSN 0026-8356.
^Monnat, Lucie (11 December 2014). "Le tunnel de base du Gothard révolutionnera le rail dans deux ans". 24 heures. Lausanne. Retrieved 7 June 2015.
^"Chronology of a Project of the Century: Milestones in the Construction History up to 2010" (PDF). Lucerne, Switzerland: AlpTransit Gotthard AG. Archived from the original (PDF) on 13 March 2012. Retrieved 20 April 2013.
^Thomas Müller; Isidor Baumann (29 April 2016). "Oberaufsicht über den Bau der Neat im Jahre 2015: Bericht der Neat-Aufsichtsdelegation der eidgenössischen Räte zuhanden der Finanzkommissionen, der Geschäftsprüfungskommissionen und der Kommissionen für Verkehr und Fernmeldewesen" (PDF). Bundesblatt (in German, French, and Italian). Vol. 2016, no. 16.005. NRLA supervisory board of the federal councils. p. 6686. BBl 2016 6665 (-6732). Retrieved 6 June 2017.
Cite error: There are <ref group=note> tags on this page, but the references will not show without a {{reflist|group=note}} template (see the help page).
and 24 Related for: Gotthard Base Tunnel information
The GotthardBaseTunnel (GBT; German: Gotthard-Basistunnel, Italian: Galleria di base del San Gottardo, Romansh: Tunnel da basa dal Sogn Gottard) is a...
The GotthardTunnel (German: Gotthardtunnel, Italian: Galleria del San Gottardo) is a 15-kilometre-long (9.3 mi) railway tunnel that forms the summit...
The Gotthard Road Tunnel in Switzerland runs from Göschenen in the canton of Uri at its northern portal, to Airolo in Ticino to the south, and is 16.9...
the Gotthard Rail Tunnel (1882), the Gotthard Road Tunnel (1980) and the GotthardBaseTunnel (2016). With the Lötschberg to the west, the Gotthard is...
Gotthard axis as part of the NRLA project. This route involves the construction of the new GotthardBaseTunnel and Ceneri BaseTunnel. The Gotthard Base...
including three new basetunnels several hundred metres below the existing apex tunnels, the 57-kilometre (35 mi) GotthardBaseTunnel, the 35-kilometre...
steep mountain railways across Gotthard, Ceneri and Lötschberg through the construction of a number of base-level tunnels that enabled trains to more rapidly...
the tunnel with traditional blasting methods and only drill a small part using a faster tunnel boring machine (TBM). Both the CBT and GotthardBase Tunnels...
world, after the GotthardBaseTunnel in Switzerland and (depending on their relative completion dates) the Mont d'Ambin BaseTunnel between France and...
longest main-line railway tunnel after the GotthardBaseTunnel in Switzerland, opened in 2016. The tunnel was constructed using conventional construction...
the Simplon Tunnel was also the lowest direct Alpine crossing for 110 years, until the opening of the GotthardBaseTunnel in 2016. The tunnel has a maximum...
making it the world's second deepest operational tunnel after the GotthardBaseTunnel. The Mont Blanc Tunnel was originally managed by the two building companies...
materials science. Existing major tunnels, such as the Channel Tunnel, Seikan Tunnel and the GotthardBaseTunnel, despite using less expensive technology...
GotthardBaseTunnel, in Switzerland, had a diameter of about 9 metres (30 ft). A larger TBM was built to bore the Green Heart Tunnel (Dutch: Tunnel Groene...
the Alps via the Gotthard Line through the GotthardBaseTunnel (Milano-Chiasso-Lugano-Luzern/Zurich-Basel line) and the Simplon Tunnel (Domodossola to...
line 2 "Project data – raw construction GotthardBaseTunnel" (PDF). Lucerne, Switzerland: AlpTransit Gotthard Ltd. 1 June 2016. Archived (PDF) from the...
as for example a double barrel tunnel longer than 20 km it is feasible. The GotthardBaseTunnel was a 57 km long tunnel. Excavated rock utilized as concrete...
through the 57 kilometre-long GotthardBaseTunnel. As a consequence, the Giruno is also referred to as the "Gotthard train". The 11-car units operate...
Ticino ("Terrace of Ticino") since the opening of the GotthardBaseTunnel in 2016. The Gotthard railway's station was opened in 1874, as part of that...
facility" To be used in urban planning project]. The Nikkei (in Japanese). 22 January 2013. Retrieved 21 March 2017. GotthardBaseTunnel Sapaesan Tunnel [ko]...
GotthardBaseTunnel, in Switzerland, had a diameter of about 9 metres (30 ft). A larger TBM was built to bore the Green Heart Tunnel (Dutch: Tunnel Groene...
A tunnel boring machine (TBM), also known as a "mole", is a machine used to excavate tunnels. Tunnels are excavated through hard rock, wet or dry soil...