This article is about the second Europipe. For the first Europipe, see Europipe I.
Europipe II gas pipeline
Europipe II at Kårstø
Location of Europipe II gas pipeline
Location
Country
Norway, Germany
General direction
north–south
From
Kårstø, Norway
Passes through
North Sea
To
Dornum, Germany
General information
Type
natural gas
Owner
Gassled
Operator
Gassco
Technical service provider
Statoil
Commissioned
1999
Technical information
Length
658 km (409 mi)
Maximum discharge
24 billion m3/a (850 billion cu ft/a)
Diameter
42 in (1,067 mm)
Europipe II is a natural gas pipeline from the Kårstø processing plant north of Stavanger to a receiving terminal at Dornum in Germany. It came on stream on 1 October 1999.[1]
^
"Europipe II on stream" (Press release). Statoil. 1 October 1999. Retrieved 29 January 2010.
EuropipeII is a natural gas pipeline from the Kårstø processing plant north of Stavanger to a receiving terminal at Dornum in Germany. It came on stream...
in Germany EuropipeII - a natural gas pipeline between the Kårstø processing plant in Norway and the Dornum terminal in Germany EUROPIPE - a German manufacturer...
provider is Statoil. Germany portal Energy portal EuropipeII MIDAL Norpipe Grann, Henning (1997). "Europipe Development Project: Managing a Pipeline Project...
The Baltic Pipe is a natural gas pipeline between EuropipeII (which traverses the North Sea between Norway and Germany) and Poland. It is a strategic...
1995-1999, Saipem was the main contractor for the construction of Europipe I and EuropipeII natural gas pipelines, connecting Norway to Germany. In the 21st...
Sea, including Blue Stream, Greenstream, Medgaz, Trans-Mediterranean, EuropipeII, and BBL pipelines. The vessel also laid most of the Nord Stream 1 pipeline...
involved in a number of pipelines, including Zeepipe, Statpipe, Europipe I and EuropipeII, and Franpipe from the Norwegian continental shelf to Western...
were still living in Dornum. The receiving terminal for gas through Europipe I and II lies at Dornum. The gas is transported on from here through a 48-kilometre...
the UK through a 7 975-kilometre network of pipelines. Haltenpipe EuropipeEuropipeII Norne Gas Transport Franpipe Åsgard Transport Norpipe Statpipe Rich...
North Sea Everest gasfield to Teesside, England. Europipe I, from North Sea to Dornum, Germany. EuropipeII, from Stavanger, Norway to Dornum, Germany. FLAGS...
Stream 2 pipe, Denmark says". Reuters. 5 October 2022. "Norway inspects EuropipeII subsea gas link to Germany". Reuters. 7 October 2022. "After Nord Stream...
and operated by Open Grid Europe. Germany portal Energy portal Europipe I EuropipeII "Case No IV/M.1383 ñ Exxon/Mobil" (PDF). The Commission of the European...
processing plant in western Norway, where it was to be connected with the EuropipeII. It was to be run to eastern Norway, western Sweden and Denmark with...
bypass pipe laid around the platform. Germany portal Energy portal Europipe I EuropipeII Franpipe MIDAL "ConocoPhillips Gets Go Ahead to Use Norpipe Oil...
Draupner E was installed in 1994 as part of the Europipe I pipeline. Europipe I, Franpipe and Zeepipe II B are connected to the Draupner E, while Statpipe...
using pipes with an outer diameter of 810 mm (32 in), manufactured by Europipe GmbH of Germany, Vyksa Steel Works of OMK and Izhora Pipe Mill of Severstal...
was laid by Saipem's pipe-laying vessel C10. Pipes were manufactured by EUROPIPE, OMK and the Chelyabinsk Pipe-Rolling Plant (Chelpipe), and were coated...
September 2007, the pipe supply contracts were awarded to pipe producers EUROPIPE and OMK. In February 2008, the concrete weight coating and logistics services...
a rather impressive track record that includes landfalls for Zeepipe, Europipe and the Interconnector, TransMed and the Gela to Mehlila pipeline, the...