Global Information Lookup Global Information

Capacity factor information


US EIA monthly capacity factors 2011-2013

The net capacity factor is the unitless ratio of actual electrical energy output over a given period of time to the theoretical maximum electrical energy output over that period.[1] The theoretical maximum energy output of a given installation is defined as that due to its continuous operation at full nameplate capacity over the relevant period. The capacity factor can be calculated for any electricity producing installation, such as a fuel consuming power plant or one using renewable energy, such as wind, the sun or hydro-electric installations. The average capacity factor can also be defined for any class of such installations, and can be used to compare different types of electricity production.

The actual energy output during that period and the capacity factor vary greatly depending on a range of factors. The capacity factor can never exceed the availability factor, or uptime during the period. Uptime can be reduced due to, for example, reliability issues and maintenance, scheduled or unscheduled. Other factors include the design of the installation, its location, the type of electricity production and with it either the fuel being used or, for renewable energy, the local weather conditions. Additionally, the capacity factor can be subject to regulatory constraints and market forces, potentially affecting both its fuel purchase and its electricity sale.

The capacity factor is often computed over a timescale of a year, averaging out most temporal fluctuations. However, it can also be computed for a month to gain insight into seasonal fluctuations. Alternatively, it can be computed over the lifetime of the power source, both while operational and after decommissioning. A capacity factor can also be expressed and converted to full load hours.

  1. ^ "Capacity factor (net)". nrc.gov. Retrieved 2017-02-11.

and 29 Related for: Capacity factor information

Request time (Page generated in 0.8537 seconds.)

Capacity factor

Last Update:

The net capacity factor is the unitless ratio of actual electrical energy output over a given period of time to the theoretical maximum electrical energy...

Word Count : 2864

Nameplate capacity

Last Update:

sun on a clear summer day. Capacity factor measures the ratio of actual output over an extended period to nameplate capacity. Power plants with an output...

Word Count : 557

Capacity

Last Update:

container Capacity of a set, in Euclidean space, the total charge a set can hold while maintaining a given potential energy Capacity factor, the ratio...

Word Count : 333

Retardation factor

Last Update:

this context. However, in column chromatography, the retention factor or capacity factor (k) is defined as the ratio of time an analyte is retained in...

Word Count : 544

Availability factor

Last Update:

availability factor should not be confused with the capacity factor. The capacity factor for a given period can never exceed the availability factor for the...

Word Count : 476

Levelized cost of electricity

Last Update:

including adjustment for expected inflation. The assumption of the capacity factor has a significant impact on the calculation of LCOE as it determines...

Word Count : 1719

Wind power

Last Update:

Wind farms sited offshore have less visual impact and have higher capacity factors, although they are generally more expensive. Offshore wind power currently...

Word Count : 10954

Bearing capacity

Last Update:

geotechnical engineering, bearing capacity is the capacity of soil to support the loads applied to the ground. The bearing capacity of soil is the maximum average...

Word Count : 1438

Load factor

Last Update:

within a data structure Load factor (electrical), the average power divided by the peak power over a period of time Capacity factor, the ratio of actual energy...

Word Count : 151

Cost of electricity by source

Last Update:

plants load following which reduces the capacity factor. Peaking power plants have particularly low capacity factors but make up for it by selling electricity...

Word Count : 9519

South America

Last Update:

wind power was 22 GW, with average capacity factor of 58%. While the world average wind production capacity factors is 24.7%, there are areas in Northern...

Word Count : 19017

Nuclear power

Last Update:

low-carbon electricity per year with an average capacity factor of 92%. Average global capacity factor is 89%. Most new reactors under construction are...

Word Count : 21810

Capacity credit

Last Update:

Capacity credit (CC, also capacity value or de-rating factor) is the fraction of the installed capacity of a power plant which can be relied upon at a...

Word Count : 1507

Carrying capacity

Last Update:

a range of factors depending on the species concerned, but can include insufficient space, food supply, or sunlight. The carrying capacity of an environment...

Word Count : 7700

Heat capacity ratio

Last Update:

constant pressure (CP) to heat capacity at constant volume (CV). It is sometimes also known as the isentropic expansion factor and is denoted by γ (gamma)...

Word Count : 2318

CANDU reactor

Last Update:

capacity factor of 85% and Unit 2 with a capacity factor of 78%, As of 2010, refurbished units at Pickering and Bruce had lifetime capacity factors between...

Word Count : 9599

Solar panel

Last Update:

and other factors. In the United Kingdom, seasonal capacity factor ranges from 2% (December) to 20% (July), with average annual capacity factor of 10–11%...

Word Count : 8427

Nuclear power in India

Last Update:

generally low capacity factors. As of 2021, the lifetime weighted energy availability factor of the Indian fleet is 66.1%. However, capacity factors have been...

Word Count : 7491

Scout Moor Wind Farm

Last Update:

The expected capacity factor for Scout Moor Wind Farm, calculated from the company's projected figures, is 27%. The actual capacity factor calculated from...

Word Count : 3527

Robert Moses Niagara Power Plant

Last Update:

installed capacity of 2,525 MW (3,386,000 hp) with an average annual net generation of 15,897,000 MWh between 2014 and 2023, and a capacity factor of 71.9%...

Word Count : 1636

Utilization factor

Last Update:

engineering, utilization factor, k u {\displaystyle k_{\text{u}}} , is the ratio of the maximum load which could be drawn to the rated capacity of the system. This...

Word Count : 265

Chernobyl Nuclear Power Plant

Last Update:

three other reactors remained operational post-accident maintaining a capacity factor between 60 and 70%. In total, units 1 and 3 had supplied 98 terawatt-hours...

Word Count : 4408

Wind generation potential in the United States

Last Update:

the capacity to install 200,000 MW at 50% capacity factor 100 m (330 ft)-high turbines. Texas, although not as windy, is larger, and has the capacity to...

Word Count : 466

Darlington Nuclear Generating Station

Last Update:

it is often among the most reliable plants in the world in terms of capacity factor. As of 2023[update], the plant is undergoing a mid-life upgrade, with...

Word Count : 4412

Wind power by country

Last Update:

generation that was wind, total wind capacity in gigawatts, percent growth in wind capacity, and the wind capacity factor for that year. Data are sourced from...

Word Count : 361

Variable renewable energy

Last Update:

usable wind or high sun on a clear summer day. Capacity factor, average capacity factor, or load factor is the ratio of actual electrical generation over...

Word Count : 7661

Vital capacity

Last Update:

and may be the result of conflation with environmental factors. Lung volumes and lung capacities refer to the volume of air associated with different phases...

Word Count : 822

Rance Tidal Power Station

Last Update:

in 2010); thus the average output is approximately 57 MW, and the capacity factor is approximately 24%. The turbines are "bulb" Kaplan turbines, of nominal...

Word Count : 1138

Benban Solar Park

Last Update:

potential plant capacity factor of approximately 26%, i.e. the average capacity will be 26% of the nameplate capacity. If the planned capacity of 1,8 GW is...

Word Count : 956

PDF Search Engine © AllGlobal.net