Loadfactor may refer to: Loadfactor (aeronautics), the ratio of the lift of an aircraft to its weight Loadfactor (computer science), the ratio of the...
electrical engineering, the power factor of an AC power system is defined as the ratio of the real power absorbed by the load to the apparent power flowing...
Passenger loadfactor, or loadfactor, measures the capacity utilization of public transport services like airlines, passenger railways, and intercity...
capacity factor can also be expressed and converted to full load hours. Nuclear power plants are at the high end of the range of capacity factors, ideally...
Look up occupancy in Wiktionary, the free dictionary. Within the context of building construction and building codes, occupancy is the use (actual or intended)...
context of electricity, the diversity factor is the ratio of the sum of the individual non-coincident maximum loads of various subdivisions of the system...
factors plus "error" terms, hence factor analysis can be thought of as a special case of errors-in-variables models. Simply put, the factorloading of...
The cooling load temperature difference (CLTD) calculation method, also called the cooling loadfactor (CLF) or solar cooling loadfactor (SCL) method...
Look up load in Wiktionary, the free dictionary. Load or LOAD may refer to: Loadfactor (aeronautics), the ratio of the lift of an aircraft to its weight...
very high fixed costs, high plant loadfactor but very low marginal costs.[citation needed] On the other hand, peak load generators, such as natural gas...
of Loadfactor. The Loadfactor is the ratio of the load that a piece of equipment actually draws (time averaged) when it is in operation to the load it...
The loss factor is often confused with loadfactor, but the formulas for each term vary. The loss factor is calculated as follows: Loss factor = (Rentable...
gradient factor k G {\displaystyle k_{G}} . When it comes to bending and torsional loading, the gradient factor is also taken into consideration. Load modifying...
how much stronger a system is than it needs to be for an intended load. Safety factors are often calculated using detailed analysis because comprehensive...
spacecraft refers to the capabilities of a design in terms of airspeed and loadfactor or atmospheric density, often simplified to altitude. The term is somewhat...
as the ratio of average load to capacity or the ratio of average load to peak load in a period of time. A higher loadfactor is advantageous because a...
Limit State Design (LSD), also known as Load And Resistance Factor Design (LRFD), refers to a design method used in structural engineering. A limit state...
choice would be to double the table size when the loadfactor would exceed 1/2, causing the loadfactor to stay between 1/4 and 1/2. It is also possible...
related to the loadfactor which is the average load divided by the peak load in a specified time period. f Load = Average load Maximum load in given time...
the load profile that the transformer is expected to be subjected to. This includes such characteristics as average loadfactor, diversity factor, utilization...
known as Minimum Breaking Load (MBL) divided by a safety factor, usually ranging from 4 to 6 on lifting equipment. The factor can be as high as 10:1 or...
corresponds to a loadfactor proportional to stick deflection independent of aircraft speed. When the stick is neutral and the loadfactor is 1g, the aircraft...