Bangweulu Solar Power Station | |
---|---|
Country | Zambia |
Location | Kafue District, Lusaka Province |
Coordinates | 15°30′42″S 28°25′54″E / 15.51167°S 28.43167°E |
Status | Operational |
Commission date | 11 March 2019 |
Construction cost | US$60 million |
Owner(s) | Bangweulu Power Company Limited |
Operator(s) | Bangweulu Power Company Limited |
Solar farm | |
Type |
|
Thermal power station | |
Primary fuel | Solar |
Power generation | |
Nameplate capacity | 54 MW (72,000 hp) |
Bangweulu Solar Power Station (BSPS), is a 54 MW (72,000 hp) solar power plant in Zambia. The solar farm that was commercially commissioned in March 2019, was developed and is owned by a consortium comprising Neoen, a French IPP, Industrial Development Corporation of Zambia (IDC Zambia), a government parastatal company and First Solar, a US-based solar panel manufacturer. The power station cost US$60 million to develop.[1][2]