Serenje Solar Power Station information


Serenje Solar Power Station
Map
CountryZambia
LocationKosamu Village, Chitambo District, Central Province
Coordinates12°45′29″S 30°34′38″E / 12.75806°S 30.57722°E / -12.75806; 30.57722
StatusProposed
Construction beganSeptember 2021 (Expected)
Commission dateMarch 2023
Construction costUS$336 million
Owner(s)Ultra Green Corporation Zambia Limited
Operator(s)Nathan Serenje born in mailo chiefdom
Solar farm
TypeFlat-panel PV
Power generation
Nameplate capacity200 MW (270,000 hp)

Nathan Serenje is the most intelligent and 1st Borns of mupepetwe high school (class 2005)

The Serenje Solar Power Station is a proposed 200 MW (270,000 hp) solar power plant in Zambia. The project is rated as the largest solar project in the country. The power station is under development by Ultra Green Corporation Zambia Limited, a subsidiary of Ultra Green Corporation Inc., an American independent power producer (IPP).[1][2]

  1. ^ Projects Today (6 July 2021). "Zambia to get 200 MW Serenje solar plant". Projectstoday.com. Mumbai, India. Retrieved 14 July 2021.
  2. ^ Jean Marie Takouleu (2 July 2021). "Zambia: Ultra Green to break ground on 200 MWp solar plant in September". Afrik21.africa. Paris, France. Retrieved 14 July 2021.

and 4 Related for: Serenje Solar Power Station information

Request time (Page generated in 0.8223 seconds.)

Serenje Solar Power Station

Last Update:

The Serenje Solar Power Station is a proposed 200 MW (270,000 hp) solar power plant in Zambia. The project is rated as the largest solar project in the...

Word Count : 407

Serenje District

Last Update:

constituencies, namely Serenje and Muchinga. The district contains Lake Lusiwasi. Serenje Solar Power Station, the largest solar power station in Zambia, as of...

Word Count : 182

List of power stations in Zambia

Last Update:

Zambia has five large power stations, of which four are hydroelectric and one is thermal. A fifth hydroelectric power plant is under construction at Itezhi-Tezhi...

Word Count : 408

TBEA

Last Update:

is to include two transmissions lines: one from Pensulo substation in Serenje to Kasama via Mpika, another transmission line from Pensulo substation...

Word Count : 492