Global Information Lookup Global Information

Uetsu Main Line information


Uetsu Main Line
Kirakira Uetsu (Joyful Train)
Overview
Native name羽越本線
StatusOperating
OwnerJR East
LocaleNiigata, Yamagata, Akita Prefectures
Termini
  • Niitsu Station
  • Akita Station
Stations61
Service
TypeHeavy rail
SystemJR East
Operator(s)JR East, JR Freight
History
OpenedSeptember 2, 1912; 111 years ago (1912-09-02)
Technical
Track length274.4 km (170.5 mi)
Number of tracksSections of double track and single track
Track gauge1,067 mm (3 ft 6 in)
1,435 mm (4 ft 8+12 in)
Electrification1,500 V DC, 20 kV AC 50 Hz
Operating speed120 km/h (75 mph)
Route map
Uetsu Main Line runs along Sea of Japan. One of the tunnels on the right is Uetsu Main Line, and the other is Japan National Route 345.

The Uetsu Main Line (羽越本線, Uetsu-hon-sen) is a railway line in the Tohoku and Chubu regions of Japan. Part of the East Japan Railway Company (JR East) system, it connects Niitsu Station in the city of Niigata and Akita Station in Akita. The name "Uetsu" refers to the ancient provinces of Dewa (出) and Echigo (後), which the line connects.[1]

  1. ^ "Uetsu Main line (Rail Enthusiasts)". TS Japan Rail. Retrieved 2021-07-25.

and 16 Related for: Uetsu Main Line information

Request time (Page generated in 1.0387 seconds.)

Uetsu Main Line

Last Update:

The Uetsu Main Line (羽越本線, Uetsu-hon-sen) is a railway line in the Tohoku and Chubu regions of Japan. Part of the East Japan Railway Company (JR East)...

Word Count : 850

Yonesaka Line

Last Update:

the Yamagata Shinkansen and Ōu Main Line can be made; while the Uetsu Main Line connects at Sakamachi Station. The line takes its name from the first kanji...

Word Count : 285

Mainline

Last Update:

Tōhoku Main Line Tōkaidō Main Line Toyama Chihō Railway Main Line Toyohashi Railroad Azumada Main Line Uetsu Main Line Korea Trans-Korean Main Line Pakistan...

Word Count : 1141

Inaho

Last Update:

which runs from Niigata to Sakata and Akita. The train runs along the Uetsu Main Line with views on the coast and Dewa Range. Three return workings daily...

Word Count : 1250

Railway Construction Act

Last Update:

(Tōhoku Main Line) Tokyo — Mito (Jōban Line) Nagoya — Kameyama — Tsuge — Kusatsu (Kansai Main Line and Kusatsu line) Osaka — Ōji — Nara (Tōkaidō Main Line and...

Word Count : 241

Yuza

Last Update:

education school for the handicapped. East Japan Railway Company - Uetsu Main Line Yuza - Fukura - Mega Nihonkai-Tōhoku Expressway – Yuza Interchange...

Word Count : 622

Suibara Station

Last Update:

station on the Uetsu Main Line in the city of Agano, Niigata, Japan, operated by East Japan Railway Company (JR East). It is the main train station for...

Word Count : 284

Akita Station

Last Update:

terminus of the Uetsu Main Line and is 298.7 kilometers from the starting point of that line at Niitsu and is also a station on Ōu Main Line. Most trains...

Word Count : 610

Majima Station

Last Update:

Uetsu Main Line in the city of Murakami, Niigata, Japan, operated by East Japan Railway Company (JR East). Majima Station is served by the Uetsu Main...

Word Count : 122

Akita Shinkansen

Last Update:

Morioka to Ōmagari, it uses the Tazawako Line tracks. The section from Ōmagari to Akita use the Ōu Main Line tracks. Services consist of Komachi trains...

Word Count : 580

E127 series

Last Update:

(originally used on Echigo Line, Hakushin Line, Uetsu Main Line) E127-100 series: 12 × 2-car sets for Matsumoto area (Oito Line, Shinonoi Line) ET127 series: 10...

Word Count : 1462

Akita Prefecture

Last Update:

(September) JR East Akita Shinkansen Gono Line Hanawa Line Kitakami Line Ōu Main Line Uetsu Main Line Oga Line Tazawako Line Akita Trans Inland Railway (Akita...

Word Count : 1920

Yamagata Prefecture

Last Update:

Shinkansen Senzan Line Aterazawa Line Yonesaka Line Rikuu West Line Rikuu East Line Flower Nagai Line Ōu Main Line Uetsu Main Line The temple of Yama-dera...

Word Count : 1675

Tsuruoka Station

Last Update:

Station is served by the Uetsu Main Line, and is located 139.4 kilometres (86.6 mi) kilometers from the starting point of the line at Niitsu Station. The...

Word Count : 202

Niitsu Station

Last Update:

three lines. ■ Uetsu Main Line ■ Banetsu West Line ■ Shinetsu Main Line It is the terminus of the Uetsu Main Line and the Banetsu West Line. It is also served...

Word Count : 339

East Japan Railway Company

Last Update:

operated by JR East, operated by JR Central and JR-West over the Tokaido Main Line, part of which JR East owns between Tokyo and Atami) During fiscal 2017...

Word Count : 1000

PDF Search Engine © AllGlobal.net