The Toledo Assembly Complex is a 3,640,000 sq ft (338,000 m2) automotive factory complex in Toledo, Ohio. Now owned by Stellantis North America, sections of the facility have operated as an automobile assembly plant since 1910, initially for Willys-Overland. The Toledo complex has assembled Jeeps since the 1940s, and comprises two factories: Toledo North and Toledo South, which includes the Stickney Plant and the Parkway Annex.
FCA (the predecessor of Stellantis NA) announced that the Toledo Machining Plant would assemble the power electronics module and components for the Jeep Wrangler Plug-in Hybrid launched in 2020.[2]
^ abc"Toledo Assembly Complex". Stellantis North America. December 2022. Retrieved April 13, 2023.
^Schoenberger, Robert (August 12, 2018). "FCA taps Toledo Machining for plug-in hybrid Jeep Wrangler components". todaysmotorvehicles.com. Archived from the original on March 4, 2021. Retrieved April 13, 2023.
The Toledo Assembly Complex is a 3,640,000 sq ft (338,000 m2) automotive factory complex in Toledo, Ohio. Now owned by Stellantis North America, sections...
recent generation, was unveiled in late 2017 and is produced at Jeep's ToledoComplex. The Wrangler is a direct progression from the World War II Jeep, through...
University of Toledo Medical Center, in the West Toledo neighborhood of Toledo; the Center for the Visual Arts is located in downtown Toledo at the Toledo Museum...
technology. For the final production design of this antenna and its highly complex drive mechanism, the Army's Signal Corps Laboratories turned to Chrysler's...
Trenton Engine Complex is Stellantis North America automotive factory complex in Trenton, Michigan. It is composed of two plants, North and South. The...
Mary of Toledo (Spanish: Catedral Primada Santa María de Toledo), otherwise known as Toledo Cathedral, is a Roman Catholic church in Toledo, Spain. It...