This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these template messages)
The neutrality of this article is disputed. Relevant discussion may be found on the talk page. Please do not remove this message until conditions to do so are met.(September 2014) (Learn how and when to remove this message)
This article contains weasel words: vague phrasing that often accompanies biased or unverifiable information. Such statements should be clarified or removed.(September 2014)
(Learn how and when to remove this message)
TPP Kostolac
Country
Serbia
Location
Kostolac, Požarevac
Status
Operational
Operator(s)
Elektroprivreda Srbije
Thermal power station
Primary fuel
Coal
Power generation
Units operational
4
Nameplate capacity
1,010 MW
Annual net output
5.717 GWh[1]
[edit on Wikidata]
TPP Kostolac is a coal fired thermal power plant complex operated by Elektroprivreda Srbije, located on the right bank of Danube river, in Kostolac, Požarevac. It is the second largest power plant in Serbia after TPP Nikola Tesla. Within the complex, there are 4 operational units as of October 2020. It makes around 10% of the total available capacity of the electric power system of Serbia and almost 11 percent of the total electric power production in EPS's (Elektroprivreda Srbije) system.
^""TPPs-OCMs Kostolac"" (PDF). eps.rs. Retrieved 21 October 2020.
TPPKostolac is a coal fired thermal power plant complex operated by Elektroprivreda Srbije, located on the right bank of Danube river, in Kostolac, Požarevac...
recently opened to the public. Kostolac has two thermal power plants which comprise the TPPKostolac. These are: TPP "Kostolac A" – with 2 blocks – total...
reserves in Europe, and it produces 5.7 million tonnes of coal per year. TPPKostolac "Mineral deposits of Serbia". docstoc.com. 2012. Archived from the original...
tallest structure in Serbia is currently the chimney of Thermal power plant Kostolac B which rises 295 m (968 ft). These lists rank Serbia's tallest completed...
wagon is 15.16m long, has four axles and capacity of 56.4 tons. "TPPs-OCMs Kostolac" (PDF). eps.rs. Retrieved 21 October 2020. Основни подаци из консолидованог...
State University, 1953, 240 m (787 ft) Chimney of TPPKostolac B, Kostolac, 295 m (968 ft) Chimney of TPP Nikola Tesla B, Obrenovac, 280 m (919 ft) Stubline...
expected to take months. Further east, the thermoelectric power plant TPPKostolac, which supplies 11% of electricity in Serbia, was threatened by floods...
with the Danube east of the village of Selo Kostolac and west of the Kostolac B TPP. Its length is 4.3 km from the brush to the mouth, and from the yellow...
Smederevo, Sevojno and Bor; thermal power plants in Obrenovac, Lazarevac and Kostolac. Other documented sources of air pollution include fossil fuel-based individual...