Električno preduzeće Srbije (1945–1965) Združeno Elektroprivredno preduzeće Srbije (1965–1991)
Founded
1 July 2005; 18 years ago (2005-07-01) (current form) 1991; 33 years ago (1991) (founded)
Headquarters
Belgrade
,
Serbia
Area served
Serbia
Key people
Oluf Ulseth (Supervisory Board Chairman)[1] Dušan Živković (acting director)[2]
Products
Electric power Coal
Production output
36.461 TWh (2016)[3]
Services
Electricity generation and distribution, electricity retailing, mining
Revenue
€2.726 billion (2021)[4]
Net income
(€132.05 million) (2021)[4]
Total assets
€8.182 billion (2021)[5]
Total equity
€5.132 billion (2021)[5]
Owner
Government of Serbia (100%)
Number of employees
24,013 (2021)
Subsidiaries
EPS Distribucija Belgrade EPS Trgovanje Ljubljana
Website
eps.rs
Footnotes / references Business ID: 20053658 Tax ID: 103920327[6]
Elektroprivreda Srbije (abbr. EPS; full legal name: Javno preduzeće Elektroprivreda Srbije Beograd) is a joint-stock electric utility power company fully owned by the Government of Serbia, with headquarters in Belgrade, Serbia. It was founded in 1991 and it has 24,013 employees (as of 2021), making it the largest enterprise in the country.
The company has an installed capacity of 7,326 MW and generates 36.461 TWh of electricity per year.[3] Its installed capacity in lignite-fired thermal power plant is 4,390 MW, gas-fired and liquid fuel-fired combined heat and power plants is 336 MW, and hydro power plants is 2,936 MW.[7] EPS also operates three power plants of total capacity 461 MW which are not in the ownership of the company.[8]
EPS is also the largest producer of lignite in Serbia operating in the Kolubara and Kostolac basins, producing around 37 million tonnes per year.[9]
^"Organizaciona šema". www.eps.rs.
^"Izvršni odbor". Elektroprivreda Srbije (in Serbian). Retrieved 22 June 2023.
^ ab"Производња електричне енергије". eps.rs. Retrieved 16 August 2018.
^ ab"Bilans uspeha (2021) - Elektroprivreda Srbije" (pdf). apr.gov.rs (in Serbian). Retrieved 9 April 2023.
^ ab"Bilans stanja (2021) - Elektroprivreda Srbije" (pdf). apr.gov.rs (in Serbian). Retrieved 9 April 2023.
^"Основни подаци о привредном друштву". apr.gov.rs (in Serbian). Serbian Business Registers Agency. Retrieved 24 February 2018.
^"Производни капацитети". eps.rs (in Serbian). Archived from the original on 15 January 2018. Retrieved 15 January 2018.
^"About Us". eps.rs. Archived from the original on 12 August 2014. Retrieved 17 July 2014.
^"EPS". Energy Fundamentals. Archived from the original on 6 November 2013. Retrieved 15 June 2013.
and 26 Related for: Elektroprivreda Srbije information
ElektroprivredaSrbije (abbr. EPS; full legal name: Javno preduzeće ElektroprivredaSrbije Beograd) is a joint-stock electric utility power company fully...
Kostolac is a coal fired thermal power plant complex operated by ElektroprivredaSrbije, located on the right bank of Danube river, in Kostolac, Požarevac...
transmission of electrical power. EPS Elektrokosmet was founded by ElektroprivredaSrbije (EPS) on 27 December 1989.[citation needed] Following the Kosovo...
organization Edappadi K. Palaniswami, former Chief Minister of Tamil Nadu ElektroprivredaSrbije, the electric power utility of Serbia Espoon Palloseura, a men's...
headquarters in Obilić, Kosovo. EPS Surface Mining Kosovo was founded by ElektroprivredaSrbije (EPS) on 21 December 1991.[citation needed] Following the Kosovo...
with headquarters in Obilić, Kosovo. EPS TPP Kosovo was founded by ElektroprivredaSrbije (EPS) on 23 December 1991.[citation needed] Following the Kosovo...
Tesla, commonly known as TENT, is a power plant complex operated by ElektroprivredaSrbije, located on the right bank of the river Sava, approximately 40 km...
Iron Gate III or Đerdap III (Serbian: Ђердап III) is a planned pumped storage power station on the Danube in Serbia, near the village of Dobra in the Golubac...
The Iron Gate I Hydroelectric Power Station (Romanian: Porțile de Fier I, Serbian: Ђердап I/Đerdap I) is the largest dam on the Danube river and one of...
353 MW. The entire production of electricity is concentrated in ElektroprivredaSrbije (EPS), public electric-utility power company. The current oil production...
353 MW. The entire production of electricity is concentrated in ElektroprivredaSrbije (EPS), public electric-utility power company. The current oil production...
24–28. ISBN 978-86-6283-067-8. "Energetski potencijali Srbije" (in Serbian). ElektroprivredaSrbije. Archived from the original on 2010-04-14. Retrieved...
year. Since Kolubara mining basin is the largest coal supplier for ElektroprivredaSrbije it plays a vital role in the country's energy independence. About...
The Iron Gate II (Romanian: Porțile de Fier II, Serbian: Ђердап II, romanized: Đerdap II) is a large dam on the Danube River, between Romania and Serbia...
Lenenergo Moscow United Electric Grid Company Tyumenenergo Yantarenergo ElektroprivredaSrbije ENEKOD Restart Energy DOO Singapore Power Elektro Celje Elektro...
put into operation. The main producer of electricity in Serbia is ElektroprivredaSrbije. The company has an installed capacity of 7,662 MW and generates...
It is estimated that the level fell for up to 5 m (16 ft). The ElektroprivredaSrbije (EPS), a state-owned electric utility power company admitted that...
structures are currently under construction like Airport City Belgrade, ElektroprivredaSrbije HQ., West 65 business-residential complex, etc. Many IT companies...
worth 1 billion euros to the government-owned companies such as ElektroprivredaSrbije. Even with high copper prices on global markets, RTB Bor continued...
the minister of mining and energy, and cancelling the reform of ElektroprivredaSrbije from a public company to a joint-stock company. They organised another...
UNMIK administration was established in Kosovo on 1 July 1999, ElektroprivredaSrbije (EPS) lost its access to the local coal mines and power plants,...
UNMIK administration was established in Kosovo on 1 July 1999, ElektroprivredaSrbije (EPS) lost its access to the local coal mines and power plants,...
their exposure of alleged corruption in the state energy company ElektroprivredaSrbije. Vucic called BIRN "liars" and accused them of being paid by the...
5 m (1 ft 8 in) of dry land over night. The water was used by the ElektroprivredaSrbije (EPS), a state-owned electric utility power company, for enlarged...