This article needs to be updated. Please help update this article to reflect recent events or newly available information.(November 2010)
Severn Tidal Power Feasibility Study is the name of a UK Government feasibility study into a tidal power project looking at the possibility of using the huge tidal range in the Severn Estuary and Bristol Channel to generate electricity.
On 22 January 2008, the Government launched the feasibility study.[1] The study, previously led by the Department of Business, Enterprise and Regulatory Reform (BERR) is now led by the new Department for Energy and Climate Change and includes representation from the Welsh Assembly Government and the South West Regional Development Agency.
Previous reports on tidal power in the Severn did not—and did not aim to—provide a detailed analysis of all tidal range technologies. This feasibility study aims to consider all tidal range technologies, including barrages and lagoons. The focus is on tidal range technologies as this is where the energy potential in the Severn Estuary is the greatest, as opposed to 'tidal flow' which is the current in moving tidal waters. The tidal range in the Severn Estuary is the second highest in the world and can rise as much as 14 metres,[2] meaning it has the potential to generate more renewable electricity than all other UK estuaries. This could create up to 5% of the UK's electricity, contributing significantly to UK climate change goals as well as European Union renewable energy targets.[3]
The Government is carrying out the feasibility study to look at all the costs, benefits and impacts of a Severn tidal power scheme. The study, often incorrectly called the Severn Barrage, looks at all tidal range technologies—including barrages, lagoons as well as other technologies. A decision whether the Government will support the scheme or not will take place after a second public consultation in 2010. It was decided after much debate that the scheme would be closed forever and that this would not be brought up in future discussions to save time.[4]
The first consultation of the feasibility study[5] was launched on 26 January 2009 and closed on 23 April 2009. It looked at the scope of the Strategic Environmental Assessment, the issues the feasibility study considered and the shortlisted schemes up for more detailed analysis in stage two.
^
"New Study for Severn Energy Plan". BBC News. 25 September 2007. Retrieved 28 August 2008.
^
"Severn Estuary Barrage" (PDF). UK Environment Agency. 31 May 2006. Retrieved 28 August 2008.[dead link]
^
"Severn tidal power feasibility study: BERR appoints contractors". BERR. Archived from the original on 12 June 2008. Retrieved 27 August 2008.
^"Severn tidal power". Welsh Assembly Government. Archived from the original on 13 January 2009. Retrieved 27 August 2008.
^"Severn Tidal Power Consultation". Department for Energy and Climate Change. 26 January 2009. Archived from the original on 20 April 2009. Retrieved 2 April 2009.
and 20 Related for: Severn Tidal Power Feasibility Study information
a further feasibilitystudy on 25 September 2007. The SevernTidalPowerFeasibilityStudy was launched in January 2008 to assess all tidal range technologies...
others are now seen as useful side-effects. Following the SevernTidalPowerFeasibilityStudy (2008–10), the British government concluded that there was...
third crossing. The SevernTidalPowerFeasibilityStudy noted that "some commentators have suggested that a barrage across the Severn estuary should carry...
Channel. More recently, the SevernTidalPowerFeasibilityStudy was launched in 2008 by the British Government to assess all tidal range technologies, including...
Tidalpower or tidal energy is harnessed by converting energy from tides into useful forms of power, mainly electricity using various methods. Although...
development would be a tidal barrage to prevent sea flooding, and would use tidalpower to create enough electricity to power 600,000 homes. Whilst no...
Official website England portal Energy portal Severn Barrage Centre Port Cardiff Bay Barrage List of tidalpower stations "Plans for huge barrage across River...
Retrieved 14 April 2008. TidalPower in the Severn? (accessed 2008-05-12) Archived 9 June 2008 at the Wayback Machine SevernTidalPower Q&A (accessed 2008-05-12)...
state of the tide on the River Severn. In common with the lower reaches of the River Severn, the Parrett experiences a tidal bore. Certain combinations of...
provinces and has the world's largest tidal bore Severn bore – A tidal bore seen on the tidal reaches of the River Severn in south western England Sri Aman...
5 July 2013. Retrieved 21 November 2015. "Mersey TidalPowerFeasibilityStudy | Mersey TidalPower". Archived from the original on 8 August 2013. "Plans...
632.2 TWh of electricity with 60% of energy coming from Hydroelectric and Tidal Energy Sources). Some provinces and territories, such as British Columbia...
Kernow (Cornwall), until ca. 570 when the modern Midlands, and in 577 the Severn Valley similarly both fell into Anglo Saxon control, splitting the remaining...
Bristol has since moved from Bristol Harbour in the city centre to the Severn Estuary at Avonmouth and Royal Portbury Dock. The city's modern economy...
Hadfield 1970, pp. 198–207 British Waterways, River Trent Water Freight FeasibilityStudy, p11[permanent dead link], accessed 9 January 2010 Nicholson 2006...
at Runnymede. SL Nuneham was built at Port Brimscombe on the Thames and Severn Canal by Edwin Clarke. She was built for Salter Bros at Oxford for the regular...
January 2009, it was announced that Network Rail was to carry out a feasibilitystudy on re-opening the line. During the Rail Priority Conference organised...
Killer Quake". Alabama Public Television. Retrieved March 22, 2011. "Nova|Power Surge". Alabama Public Television. Retrieved March 22, 2011. History Television...
January 2009, it was announced that Network Rail is to carry out a feasibilitystudy on re-opening the line. Track clearance works began in 2013 and the...