Continuous or uncontrolled growth in a project's scope, at any point after the project begins
This article is about project management. For the firearms term, see Telescopic sight § Mounting issues.
This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed. Find sources: "Scope creep" – news · newspapers · books · scholar · JSTOR(January 2022) (Learn how and when to remove this message)
Scope creep (also called requirement creep, or kitchen sink syndrome) in project management is continuous or uncontrolled growth in a project's scope, generally experienced after the project begins.[1] This can occur when the scope of a project is not properly defined, documented, or controlled. It is generally considered harmful.[2][3]: 13 It is related to but distinct from feature creep, because feature creep refers to features, and scope creep refers to the whole project.
^Lewis, James (2002). Fundamentals of Project Management (Second ed.). AMACOM. pp. 29, 63. ISBN 0-8144-7132-3.
^Kendrick, Tom (2015). "Chapter 3. Identifying Project Scope Risk". Identifying and Managing Project Risk: Essential Tools for Failure-Proofing Your Project (3rd ed.). AMACOM. pp. 50–52. ISBN 978-0-8144-3609-7.
^Sanghera, Paul (2019). PMP in Depth (Third ed.). Apress. ISBN 978-1-4842-3910-0.
Scopecreep (also called requirement creep, or kitchen sink syndrome) in project management is continuous or uncontrolled growth in a project's scope...
uncontrolled feature creep can lead to products that surpass the scope of what was originally intended; this is known as scopecreep. A common consequence...
Massachusetts Scope (horse), a racehorse Scope (mouthwash) Norfolk Scope, an arena in Norfolk, Virginia Scopecreep, the incremental expansion of the scope of a...
condition called scopecreep, where the inertia of the telescopic sight holds it still as the firearm recoils under it. Because of this, scope rings must be...
Mission creep is the gradual or incremental expansion of an intervention, project or mission, beyond its original scope, focus or goals, a ratchet effect...
Look up creep in Wiktionary, the free dictionary. Creep, Creeps, CREEP, or Creeping may refer to: Creeps (film), a 1956 short starring the Three Stooges...
to the phenomena of featuritis and scopecreep in the manufacture of various consumer goods, and of mission creep in military planning. In sociology,...
attempt to capture requirements in a series of automated acceptance tests. Scopecreep may occur from requirements moving over time. In Requirements management...
Management Institute Project plan Project slippage Project stakeholders Scopecreep Harold Kerzner (2003). Project Management: A Systems Approach to Planning...
which the team had devised a large number of classes, which had caused scopecreep and led Blizzard to cancel the project and cut the team. To save what...
Law of triviality List of media notable for being in development hell Scopecreep Turnaround (filmmaking) Vaporware Doyle, Barbara Freedman (2012). Make...
creep or rule creep occurs when instructions or rules accumulate over time until they are unmanageable or inappropriate. It is a type of scopecreep....
explanations account for overrun in terms of optimism bias with forecasters. Scopecreep, where the requirements or targets rises during the project, is common...
that it uses "creep" in a way that is contradictory to other terms such as "scopecreep", "feature creep", and "mission creep". "BRT creep" refers to how...
century, and especially accelerating in 2013. It has been compared to scopecreep and the overall expansion of the concept of safety in other areas, such...
the late 1950s and early 1960s Kitchen sink syndrome, also known as "scopecreep" in project management Kitchen sink regression, a usually pejorative...
training in computer science as managers and even engineers on the project Scopecreep as requirements were continually added to the system even as it was falling...
productivity. Scope of a project in project management is the sum total of all of its products and their requirements or features. Scopecreep refers to uncontrolled...
Choosing the incremental model for stable-requirement projects can lead to scopecreep and increased complexity, while selecting the waterfall model might cause...
development but also required legal and other systemic changes, resulting in scopecreep and cost overrun. TAURUS eventually cost £75 million and was replaced...
Domark obtained a licence to A View to a Kill. Despite delays caused by scopecreep, the eponymous game was released later in 1985 and was "actually quite...
release date of late 2007, and was put on hold, possibly cancelled due to scopecreep, unsatisfactory internal experiments, and the desire to develop the Source...
backers, Infinite Fall limited the number of stretch goals to avoid scopecreep. Benson names Chris Ware, Mike Mignola, Mary Blair, Flannery O’Connor...
overhead. Critics of XP claim this can lead to costly rework and project scopecreep beyond what was previously agreed or funded.[citation needed] Change-control...