Ruling gradient information


The term ruling grade is usually used as a synonym for "steepest climb" between two points on a railroad. More simply, the steepest grade to be climbed dictates how powerful the motive power (or how light the train) must be in order for the run to be made without assistance. Even if 99% of the line could be run with a low-powered (and inexpensive) locomotive, if at some point on the line there is a steeper gradient than such train would be able to climb, this gradient "rules" that a more powerful locomotive must be used, in spite of it being far too powerful for the rest of the line. This is why special "helper engines" (also dubbed "Bankers") are often stationed near steep grades on otherwise mild tracks. It is cheaper than running a too-powerful locomotive over the entire track mileage just in order to make the grade, especially when multiple trains run over the line each day (to help justify the fixed daily cost of the helper operation).

In the 1953 edition of Railway Engineering William H. Hay says "The ruling grade may be defined as the maximum gradient over which a tonnage train can be hauled with one locomotive....The ruling grade does not necessarily have the maximum gradient on the division. Momentum grades, pusher grades, or those that must regularly be doubled by tonnage trains may be heavier." This means the "ruling grade" may change if the management chooses to operate the railroad differently.

and 24 Related for: Ruling gradient information

Request time (Page generated in 0.8317 seconds.)

Ruling gradient

Last Update:

Hay says "The ruling grade may be defined as the maximum gradient over which a tonnage train can be hauled with one locomotive....The ruling grade does not...

Word Count : 1029

List of steepest gradients on adhesion railways

Last Update:

steep gradients on railways avoids the expensive engineering work required to produce more gentle gradients. However the maximum feasible gradient is limited...

Word Count : 684

Track geometry

Last Update:

distance of the track. The allowable gradients may be based on the ruling gradient which is the maximum gradient over which a tonnage train can be hauled...

Word Count : 2802

Mountain railways of India

Last Update:

(318 ft). The route has a gradient of 1:12.5 up to Coonoor, and past Coonoor to the final station the track has a ruling gradient of 1:23. The Kalka–Shimla...

Word Count : 2664

South Coast Railway zone

Last Update:

Vijayawada division of SCoR. This is an important mineral route with ruling gradient of 1 in 60 with some block sections prone for stalling of loaded freight...

Word Count : 807

Union Pacific Big Boy

Last Update:

drawbar horsepower at 41.4 mph. Designed to haul 3,600 tons up the 1.14% ruling gradient over this subdivision, the tests demonstrated that a Big Boy could...

Word Count : 3227

Rack railway

Last Update:

Britain to 1830 List of rack railways List of steepest gradients on adhesion railways Ruling gradient Slippery rail Slope car Jehan, David (2003). Rack Railways...

Word Count : 3734

Cable railway

Last Update:

Funicular Grade (slope) Incline elevator Rack railways Reaction ferry Ruling gradient San Francisco cable car system Steep grade railway Carrington D.C....

Word Count : 2554

Howrah Bridge

Last Update:

longitudinal ruling gradient of 1 in 40 from either end, joined by a vertical curve of radius 4,000 feet (1,200 m). The cross gradient of deck is 1 in...

Word Count : 4106

Devonshire Tunnel

Last Update:

Tunnels Greenway. The tunnel had a gradient of 1 in 50, on a line where the ruling gradient was also 1 in 50. "Image gradient profile". Two Tunnels Shared Path...

Word Count : 151

North Island Main Trunk

Last Update:

elevation differences with grades suitable for steam engines, the ruling gradient being 1 in 50. When the first sections of the NIMT were built, there...

Word Count : 7809

Barker Road

Last Update:

The length of this road is 5,660 feet and the ruling gradient 2 in 40, while the steepest gradients being 1 in 20 make it available for rickshaw traffic...

Word Count : 460

Cascade Tunnel

Last Update:

locomotives. It was built with a 1.7% (1:58.8) gradient eastbound, which was too close to the ruling gradient of 2.2%. Because of the steepness of the line...

Word Count : 2106

Wolverton Viaduct

Last Update:

Stephenson was determined that the route would have minimal gradients and curves; the ruling gradient on the line is 1:330. Stephenson took advantage of natural...

Word Count : 1885

Big Hill

Last Update:

extra track effectively double the length of the climb and reduce the ruling gradient to 2.2%. The new distance between Field and Wapta Lake, where the track...

Word Count : 1342

Kenya Standard Gauge Railway

Last Update:

200 m (3,900 ft) (800 m or 2,600 ft at difficult locations) Maximum (ruling) gradient: 1.85% (1 in 54) Length of arrival & departure track at passing loops:...

Word Count : 1763

Talla Railway

Last Update:

ran an inspection train from Edinburgh to the site. The line had a ruling gradient of 1 in 50.[page needed] The contract for the construction of the reservoir...

Word Count : 1189

Horseshoe curve

Last Update:

Queensland through Richmond Gap. The railway line climbs at a steady ruling gradient from Kyogle to the summit at a tunnel at the border between the two...

Word Count : 1785

Midland and South Western Junction Railway

Last Update:

company. There was a 647-yard (592 m) tunnel near Marlborough and the ruling gradient was 1 in 100, markedly easier than over the Marlborough Railway. The...

Word Count : 7508

Matheran Hill Railway

Last Update:

9 kg/m) rails, but were upgraded to 42 lb/yd (20.8 kg/m) rails. The ruling gradient is 1:20 (five percent), with tight curves, and speed is limited to...

Word Count : 1117

Talyllyn Railway

Last Update:

although this is where some of the steepest gradients on the line are to be found. The ruling gradient of the line is 1 in 60. More local halts follow...

Word Count : 8329

Sri Lanka Railways

Last Update:

via the Parnepettia Pass, with a total length of 127 km (79 mi), a ruling gradient of one in 60, with a short Tunnel at an estimated cost of £856,557...

Word Count : 4503

BR Standard Class 9F

Last Update:

proportion of adhesive weight were well suited to coping with the 1 in 50 ruling gradient on the Bath extension. On one occasion, a 9F was set to haul an express...

Word Count : 3463

Combe Down Tunnel

Last Update:

related to Combe Down Tunnel. List of tunnels in the United Kingdom Ruling gradient#Other tunnels "Two Tunnels Greenway". Twotunnels.org.uk. Archived from...

Word Count : 742