The Proterra EcoRide BE35 is a 35 foot (11 m) (nominal length) fast-charge battery electric bus that seats 38 (including the driver) with a total passenger capacity of 60 in its composite low floor body. Foothill Transit was the first transit agency to operate the buses in revenue service, starting in September 2010.[3][4] It is the first 30 ft (9 m) or larger, heavy-duty all-electric bus ever to complete federally required durability, reliability and safety testing at the Bus Research and Testing Center in Altoona, Pennsylvania. The 12yr/500,000 mi (800,000 km) STURAA test was completed on March 5, 2012.[1]
The BE35's electric traction motor draws from lithium-titanate batteries supplied by Altairnano that can be recharged in 5–10 minutes while stopped at a bus stop via overhead terminals connected to a charging station, without driver involvement.[5] The quick charging during a brief layover typically enables a further 26 miles (42 km) of operation.[6][7]
^ abcdefghSTURAA Test: 12 Year, 500,000 mile bus from Proterra, Inc. | Model BE-35 (Report). Pennsylvania Transportation Institute. April 2012.
^ abcdefgSTURAA Test: 12 Year, 500,000 mile bus from Proterra, Inc. | Model BE-35 (Report). Pennsylvania Transportation Institute. May 2013.
^"L.A. Gets World's First Rapid-Charge Electric Bus". TechChunks. US. September 20, 2010. Retrieved April 18, 2016.
^Barry, Keith (September 13, 2010). "Quick-charge electric bus rolls into L.A. County". Wired. Retrieved July 12, 2018.
^Barry, Keith (November 4, 2009). "Altairnano batteries make Proterra a magic bus". Wired. Retrieved July 12, 2018.
^"California City First To Get 2nd-Generation Proterra Electric Bus".
^"Electric bus manufacturers BYD and Proterra are making serious moves". 22 July 2014.
The ProterraEcoRide BE35 is a 35 foot (11 m) (nominal length) fast-charge battery electric bus that seats 38 (including the driver) with a total passenger...
Pomona, California, since September 2010 at Foothill Transit. The ProterraEcoRide BE35 uses lithium-titanate batteries and is able to fast-charge in...
earlier EcoRide as the company's flagship product. In 2014 Proterra introduced the Catalyst, a fast-charge 100% electric bus to replace the EcoRide BE35...
DART First State's fleet of battery electric buses are manufactured by Proterra and Gillig. DART First State operates thirty fixed route bus routes throughout...
Transit Authority operates a fleet of 46 Gillig Low Floor buses, 6 ProterraEcoRide battery electric buses, and 35 Ford E350 minibuses. Free public transport...
portal Alliance of Automobile Manufacturers ASOTRECOL Crucible Industries EcoCAR General Motors Hy-wire General Motors proving grounds General Motors Technical...
and repair approximately 100,000 automobiles equipped with a 3.0-liter V6 EcoDiesel engine having a prohibited defeat device, pay $311 million in total...
Current Ford E100 Flex sold in the Brazilian market are the Courier, Ford EcoSport, Ford Fiesta, Ford Focus, and Ford Ka. In 2004, Ford and Toyota agreed...
the pilot program, including buses from competitors New Flyer (XE40), Proterra (ZX5), and Nova Bus (LFSe). IndyGo purchased 13 BYD K11M Electric Buses...
SchoolRun School bus Wrightbus Bodywork for Volvo B7R United Kingdom EcoRide Single deck Proterra 2010 to 2014 Electric United States Effeuno Single deck Iveco...
ordered 2 Enviro500EV variants with an all-electric drivetrain supplied by Proterra, expected to enter service in 2019. These buses were delivered on 20 January...
(PDF). Germany: Kraftfahrt-Bundesamt. 2018-01-15. Retrieved 2019-01-08. ECO Sticker. car.go.th. Archived from the original on 2021-10-16. Tag Image car...
Windcrest, many of them are within driving proximity of outlying park-and-ride facilities. VIA was created in 1977 when the citizens of Bexar County voted...
Association's top five Vans of the Year. In December 2009, it was named the 2010 Eco Van of the Year by What Van magazine. In 2012, the Edison was upgraded to...