This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed. Find sources: "Project management triangle" – news · newspapers · books · scholar · JSTOR(December 2008) (Learn how and when to remove this message)
(Learn how and when to remove this message)
The project management triangle (called also the triple constraint, iron triangle and project triangle) is a model of the constraints of project management. While its origins are unclear, it has been used since at least the 1950s.[1] It contends that:
The quality of work is constrained by the project's budget, deadlines and scope (features).
The project manager can trade between constraints.
Changes in one constraint necessitate changes in others to compensate or quality will suffer.
For example, a project can be completed faster by increasing budget or cutting scope. Similarly, increasing scope may require equivalent increases in budget and schedule. Cutting budget without adjusting schedule or scope will lead to lower quality.
"Good, fast, cheap. Choose two." as stated in the Common Law of Business Balance (often expressed as "You get what you pay for.") which is attributed to John Ruskin but without any evidence and similar statements are often used to encapsulate the triangle's constraints concisely.[2][3] Martin Barnes (1968) proposed a project cost model based on cost, time and resources (CTR) in his PhD thesis and in 1969, he designed a course entitled "Time and Cost in Contract Control" in which he drew a triangle with each apex representing cost, time and quality (CTQ).[4] Later, he expanded quality with performance, becoming CTP. It is understood that the area of the triangle represents the scope of a project which is fixed and known for a fixed cost and time. In fact the scope can be a function of cost, time and performance, requiring a trade off among the factors.
In practice, however, trading between constraints is not always possible. For example, throwing money (and people) at a fully staffed project can slow it down.[5] Moreover, in poorly run projects it is often impossible to improve budget, schedule or scope without adversely affecting quality.
^Atkinson, Roger (December 1999). "Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria". International Journal of Project Management. 17 (6): 337–342. doi:10.1016/S0263-7863(98)00069-6.
^Wyngaard, Charles Van (2012). "Theory of the triple constraint — A conceptual review". 2012 IEEE International Conference on Industrial Engineering and Engineering Management. pp. 1991–1997. doi:10.1109/IEEM.2012.6838095. ISBN 978-1-4673-2945-3. S2CID 12434391.
The projectmanagementtriangle (called also the triple constraint, iron triangle and projecttriangle) is a model of the constraints of project management...
A glossary of terms relating to projectmanagement and consulting. Contents: Top 0–9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z Agile software...
Construction management (CM) aims to control the quality of a project's scope, time, and cost (sometimes referred to as a projectmanagementtriangle or "triple...
accomplish project objectives managing the constraints of the projectmanagementtriangle, which are cost, time, scope and quality A project manager is...
up projectmanagement in Wiktionary, the free dictionary. Projectmanagement is the process of leading the work of a team to achieve all project goals...
basis of the popular projectmanagement aphorism "Quick, Cheap, Good: Pick two," conceptualized as the projectmanagementtriangle or "quality, cost, delivery"...
of the projectmanagementtriangle: scope, time, and costs. In a single integrated system, EVM is able to provide accurate forecasts of project performance...
the locked time, resources and scope (commonly known as the projectmanagementtriangle). Efforts to add scope to the fixed time and resources of agile...
description – in projectmanagement is a structured format of presenting information about a project product ProjectManagementTriangle – is a model of...
The Triangle Shirtwaist Factory fire in the Greenwich Village neighborhood of Manhattan, New York City, on Saturday, March 25, 1911, was the deadliest...
The Coral Triangle (CT) is a roughly triangular area in the tropical waters around the Philippines, Indonesia, Malaysia, Papua New Guinea, the Solomon...
engagement, different from working on individual projects. Global Benchmarking Network Projectmanagementtriangle Profit impact of marketing strategy Fifer...
but did not make money until in 1993 with the installment of new management, Triangle reworked itself into a competitive enterprise. In making dramatic...
greatest building projects ever undertaken" and all seven buildings are now designated as architecturally historic. Federal Triangle station is the Washington...
formal or informal Iron Triangle (also called Projecttriangle or Triple Constraint), a projectmanagement concept Triangle (musical instrument), also...
The Halaib Triangle is an area of land measuring 20,580 square kilometres (7,950 sq mi) located on the Northeast African coast of the Red Sea. The area...
Company, Mondelēz International, and Ingersoll Rand and a former CEO of Triangle Industries. Peltz was born to a Jewish family in 1942 in Brooklyn, New...
by agile principles-based projectmanagement approaches and for personal time management. Timeboxing is used as a project planning technique. The schedule...
"NOAA PIFSC CRED in the Coral Triangle: Building capacity for application of an Ecosystem Approach to Fisheries Management". National Oceanic and Atmospheric...
distribution, along with the PERT distribution, is also widely used in projectmanagement (as an input into PERT and hence critical path method (CPM)) to model...
The One Roxas Triangle, also known as the One Roxas Triangle Tower 1 or Roxas Triangle Tower One, is a residential condominium skyscraper located in Makati...
in the Mara Triangle and their counterparts in the eastern part of the Mara. A flow assessment and trans-boundary river basin management plan between...
The Goualougo Triangle is a 100-square-mile (260 km2) region on the southern end of the Nouabale-Ndoki National Park, located in the Republic of Congo...
operates five retail locations and a roasting facility in the Research Triangle area. 321 Coffee founders Lindsay Wrege and Michael Evans were freshmen...