Orbiter Processing Facility (OPF) is a class of hangars where U.S. Space Shuttle orbiters underwent maintenance between flights. They are located west of the Vehicle Assembly Building, where the orbiter was mated with its external tank and Solid Rocket Boosters before transport to the launch pad. OPF-1 and OPF-2 are connected with a low bay between them, while OPF-3 is across the street.
OPF-3 was previously called the Orbiter Maintenance & Refurbishment Facility (OMRF), but was upgraded[when?] to a fully functioning OPF.
and 17 Related for: Orbiter Processing Facility information
OrbiterProcessingFacility (OPF) is a class of hangars where U.S. Space Shuttle orbiters underwent maintenance between flights. They are located west...
institution. Each orbiter incorporated over 21,000 tiles. About 42 reusable RS-25 engines have been part of the STS program, with three used per orbiter per mission...
was also the design lifetime of each orbiter). They were carefully inspected in the OrbiterProcessingFacility after each mission, and damaged or worn...
Building, OrbiterProcessingFacility, and Shuttle Landing Facility. Pathfinder is approximately the same size, shape and weight of an actual orbiter. Using...
In January 2014 it was announced that Boeing would lease the OrbiterProcessingFacility at Kennedy Space Center to enable the U.S. Air Force to efficiently...
and 31, LDEF was removed from Columbia's payload bay in KSC's OrbiterProcessingFacility, placed in a special payload canister, and transported to the...
Space Florida) Shuttle Landing Facility to Space Florida (who contracts use to private companies) OrbiterProcessingFacility (OPF)-3 to Boeing (for CST-100...
Extended Duration Orbiter pallet was used by the orbiter in thirteen of the pallet's fourteen flights, which aided lengthy stays in orbit for scientific...
approvals and funding. In October 2011, NASA announced that the OrbiterProcessingFacility-3 at Kennedy Space Center would be leased to Boeing for manufacture...
VAB and the pads, OrbiterProcessingFacility buildings, a Launch Control Center which contains the firing rooms, a news facility famous for the iconic...
attached to the external tank on the MLP. The orbiter vehicle was prepared at the OrbiterProcessingFacility (OPF) and transferred to the VAB, where a crane...
the orbiters to the Kennedy Space Center in Florida. Additionally the orbiters were routinely towed from the Shuttle Landing Facility to the Orbiter Processing...
de-stacked in the VAB and the orbiter returned to OrbiterProcessingFacility. The mission, STS-51E, was canceled and the orbiter was re-manifested with 51-B...
the orbiter would be accomplished in the adjacent Orbiter Maintenance and ProcessingFacility (OMPF). Between November 1984 and May 1985, the orbiter Enterprise...
Space Shuttle Endeavour (Orbiter Vehicle Designation: OV-105) is a retired orbiter from NASA's Space Shuttle program and the fifth and final operational...
Space Shuttle Atlantis (Orbiter Vehicle designation: OV‑104) is a retired Space Shuttle orbiter vehicle which belongs to NASA, the spaceflight and space...
orbiter, with only a mockup crew module installed and thermal insulation placed on its forward fuselage. NASA planned to refit the prototype orbiter Enterprise...