Nine Elms Locomotive Works were built in 1839 by the London and South Western Railway (LSWR) adjoining their passenger terminus near the Vauxhall end of Nine Elms Lane, in the district of Nine Elms in the London Borough of Battersea. They were rebuilt in 1841 and remained the principal locomotive carriage and wagon workshops of the railway until closure in stages between 1891 and 1909. Thereafter a large steam motive power depot remained open on the site until 1967, serving Waterloo railway station.
and 25 Related for: Nine Elms Locomotive Works information
NineElmsLocomotiveWorks were built in 1839 by the London and South Western Railway (LSWR) adjoining their passenger terminus near the Vauxhall end of...
NineElms is an area of south-west London, England, within the London Borough of Wandsworth. It lies on the River Thames, with Battersea to the west,...
at Eastleigh Works in May 1945, and in that month was first shedded at NineElms shed, where it was to remain for most of its career, under both the Southern...
4-4-0 steam locomotives designed for the London and South Western Railway by William Adams. Ten were constructed at NineElmsLocomotiveWorks between 1885...
4-4-0 steam locomotives designed for the London and South Western Railway by William Adams. Twenty were constructed at NineElmsLocomotiveWorks between...
4-4-0 steam locomotives designed for the London and South Western Railway by William Adams. Ten were constructed at NineElmsLocomotiveWorks between 1895...
type ever to run in Britain. The first 25 were constructed at NineElmsLocomotiveWorks between March and November 1897. Thereafter the M7 class had a...
Carriage and Wagon Works from NineElms in London were transferred to Eastleigh. This was followed by the NineElmsLocomotiveWorks which were moved there...
railway locomotives. He was a member of the Institution of Automobile Engineers. Blake was born in Putney in 1867, trained at NineElmsLocomotiveWorks (1886-1889)...
constructed at the LSWR's NineElmsLocomotiveWorks. The success of the locomotive ensured that a second batch of 30 locomotives was ordered the next year...
Western Railway in 1862 as a draughtsman at NineElmsLocomotiveWorks. He succeeded his father as Locomotive Engineer of the LSWR following Joseph's death...
O2 class 0-4-4Ts, it was built by the LSWR in December 1891 at NineElmslocomotiveworks and numbered LSWR 209. It was based at Fratton before moving on...
Forty of the class were subsequently outshopped from the LSWR's NineElmsLocomotiveWorks. They were generally paired with a 6-wheel tender because of their...
and Nasmyth, Gaskell and Company. From Jan 1843 the LSWR's own NineElmsLocomotiveWorks started production with the 'Eagle' class singles. Gooch's designs...
locomotive was sent to Doncaster Works for repair and restored to its original condition.: 281–282 In February 1963, Mallard was sent to NineElms depot...
to Bournemouth. Other shed allocations included Weymouth Radipole and NineElms. 35022 was withdrawn from service in May 1966 after a working life of...
January 1910, locomotive building was likewise transferred to the new workshops at Eastleigh from NineElms in London. Among the locomotives produced by...
the three NineElms engines; and the last twelve, of 1874–75, had cylinders 15+1⁄2 in × 22 in (390 mm × 560 mm). The three NineElmslocomotives, and the...
locomotives were built, fifty at NineElmsWorks and forty by Neilson and Company, although the latter together with the final twenty from NineElms were...
South Western Railway T1 class was a class of fifty 0-4-4T steam tank locomotives designed for suburban passenger work by William Adams and built between...
engine designs. More are being restored all the time, covering for other locomotives as they themselves are taken out of service. In the near future, additional...
from his home at Surbiton to the new locomotiveworks at Eastleigh. The locomotive was built at NineElmsworks in 1899 at a cost of £1765. It was numbered...
conducted by Robert Urie, then Works Manager of NineElmsWorks found 108 of the LB&SCR's 541 locomotives (20%) were awaiting or under repair, and that...