This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed. Find sources: "Nigerian National Integrated Power Project" – news · newspapers · books · scholar · JSTOR(July 2013) (Learn how and when to remove this message)
The Nigerian National Integrated Power Project (NIPP) was conceived in 2004[1] when Olusegun Obasanjo was the President of the Federal Government of Nigeria. It was formed to address the issues of insufficient electric power generation and excessive gas flaring from oil exploration in the Niger Delta region. Seven power plants were designed in gas-producing states as part of the project.
Planned power plants included:[2]
Ihovbor Power Station Benin, Edo State with the capacity of 4 x 112.5 MW (ISO 126 MW).
Calabar Power Station, Cross River State with the capacity of 5 x 112.5112.5 MW (ISO 126 MW).
Egbema Power Station, Imo State with the capacity of 3 x 112.5 MW (ISO 126 MW).
Gbarain Power Station, Yenagoa, Bayelsa State with the capacity of 2 x 112.5 MW (ISO 126 MW).
Sapele Power Station, Delta State with the capacity of 4 x 112.5 MW (ISO 126 MW).
Omoku Power Station, Rivers State with the capacity of 2 x 112.5 MW (ISO 126 MW).
Ikot Abasi Power Station, Akwa Ibom with the capacity of 2 x 112.5 MW (ISO 126 MW) (replaced later by Ibom Power Station).
Together, the projects generated contracts worth $414,000,000 for the supply of turbines and electricity generation equipment to General Electric (GE).[3] The primary turbine is GE 9E gas turbine with a nominal ISO rating of 126MW. After adjusting for site conditions, the capacity was set to 112.5 MW.
The plants are low efficiency simple cycle but have provision for future extension to combined cycle.[4]
Administration changes in 2007 interrupted funding for more than two years.[5]
The NIPP project includes 11 power plants and 4 FGN Power Stations:
Alaoji Power Station, Abia State, combined cycle plant with the capacity of 4 x 112.5 MW (ISO 125 MW) and 2x steam 255 MW
Omotosho II Power Station, Ondo State, with the capacity of 4 x 112.5 (ISO 125 MW)
Olorunsogo II Power Station, Ogun State, combined cycle plant with the capacity of 4 x 125 MW and 2 x steam 125 MW
Geregu II Power Station, Kogi State, with the capacity of 434 MW [6]
Following the Afam V and Geregu I plants, Geregu II is now the third gas-turbine power plant to be constructed by Siemens in Nigeria as a turnkey project and completed on schedule. The scope of delivery supplied by Siemens for Geregu II included three SGT5-2000E gas turbines, three SGen5-100A generators, as well as all the electrical systems and the SPPA-T3000 control system.[7]
The Ikot Abasi NIPP power plant has been replaced by Ibom Power, which is a 190 MW project of the Akwa Ibom State Government.
The revised project involves large scale transmission projects across all of Nigeria which are crucial to ensure power distribution from generation plants to final customers.[8]
^"Niger Delta Power Holding Company Limited". Archived from the original on 7 February 2014. Retrieved 25 November 2012.
^"NIPP Grid Study" (PDF). Archived from the original (PDF) on 3 October 2013. Retrieved 25 November 2012.
^Africa Oil+Gas Report
^Federal Ministry of Information Archived 4 March 2013 at the Wayback Machine
^NDPHC Archived 7 February 2014 at the Wayback Machine. Nidelpower.com.
^Film about Geregu II Power Station
^PennEnergy article about Geregu II
^"Niger Delta Power Holding Company Limited". Archived from the original on 4 November 2013. Retrieved 15 March 2013.
and 28 Related for: Nigerian National Integrated Power Project information
sector is the NigerianNationalIntegratedPowerProject, NIPP, a project that was initiated in 2004 to fast-track the development of new power plants in...
government in Nigeria (Federal, State, and Local). These power plants are referred to as being part of the NationalIntegratedPowerProject (NIPP). Wholly...
privatized legacy power plants, eight (8) are NigerianNationalIntegratedPowerProjects (NIPP) plants, and nine (9) are Independent Power Plants (IPP)....
NigerianNational Petroleum Corporation (NNPC) is a for profit oil company in Nigeria. Formerly a government-owned corporation, it was transformed from...
between Shiroro and Jebba dams. The power will subsequently be integrated into the Nigerian electricity grid. The project cost has been reported as 1.3 billion...
owned by National Thermal Power Corporation are done by respective regional load dispatch centers, which are the apex body to ensure integrated operation...
Europe, Nneka is one of the best-known Nigerian pop musicians. One of the very few Nigerian artists living in Nigeria who has had commercial success in Europe...
lists current or past ministries. Cabinet of NigeriaNigerian Civil Service "Government Ministries in Nigeria and their ministers with their state of origin"...
Universal Basic Education for every Nigerian child of school-going age. In 2000, Nigeria passed into law the National Policy on Women guided by the global...
graduates of an autonomous Nigerian university. The university has four campuses: University of Nigeria, Nsukka, UNN, University of Nigeria Enugu campus, UNEC...
Nigeria, holding office until 1912. In the new Southern Nigeria, the old Lagos Colony became the Western Province, and the former Southern Nigerian Protectorate...
than others in Nigeria. Recently, the Nigerian Association of Water-Well Drilling Rig Owners and Practitioners (AWDROP) urged the Nigerian government to...
Idahosa "Hosa" Wells Okunbo (7 January 1958 – 8 August 2021) was a Nigerian business magnate, investor, philanthropist, and trained commercial pilot. He...
in Nigeria is a constant phenomenon. In 2012, Nigeria was estimated to have lost over $400 billion to corruption since its independence. Nigerian politicians...
Petrolex Oil & Gas Limited is a Nigerian company and part of Petrolex Group, an African integrated energy conglomerate. The company was founded in February...
Adara, Berom, Tiv and Tarok). The most impacted states are those of the Nigerian Middle Belt like Benue, Taraba and Plateau. Violence has reached two peaks...
College of Education(F C E zaria) Nigerian College of Aviation Technology Nigerian Institute of Transport Technology, Nigeria Institute of Leather and Science...
power generated here is integrated into the Gambian national electricity grid, through the National Water and Electricity Company network. The power station...
Lake Turkana Wind PowerProject (LTWP) is a wind farm in Kenya. It is located in Loiyangalani District, in Marsabit County, approximately 545 kilometres...
The Nigeria Olympic Committee (NOC) is the National Olympic Committee for Nigeria, responsible for co-ordinating and supporting Nigerian competitors in...
the leaders of the First Nigerian Republic after Nigerian independence. Tinubu Square is the most popular square in Nigeria. Tafawa Balewa Square is a...
Imoke listen (born 10 July 1961) is a Nigerian politician who served as the governor of Cross River State, Nigeria from 29 May 2007 till 29 may 2015. He...
Sector stakeholders in Nigeria. She was the principal consultant for General Electric (GE) on the NationalIntegratedPowerProject (NIPP) with the Federal...
receiving terminal project in the Philippines. In September 2018, it also signed a memorandum of understanding with NigerianNational Petroleum Corporation...
the Nigerian government sold 60% equity to the Nigerian public in an initial public offering. By February 1992, Unipetrol was listed on the Nigerian Stock...
solar 32-inch digital TV integrated terminal systems. A total of 20,000 Nigerian rural families will benefit from the project. Kpaduma, an underdeveloped...
administration and developed the Aba INTEGRATEDPowerProject (Aba IPP) based on a Lease Agreement with the Federal Government of Nigeria (FGN). The Obasanjo Administration...