"NATM" redirects here. For other uses, see NATM (disambiguation).
The New Austrian tunneling method (NATM), also known as the sequential excavation method (SEM) or sprayed concrete lining method[1] (SCL), is a method of modern tunnel design and construction employing sophisticated monitoring to optimize various wall reinforcement techniques based on the type of rock encountered as tunneling progresses. This technique first gained attention in the 1960s based on the work of Ladislaus von Rabcewicz, Leopold Müller, and Franz Pacher between 1957 and 1965 in Austria. The name NATM was intended to distinguish it from earlier methods, with its economic advantage of employing inherent geological strength available in the surrounding rock mass to stabilize the tunnel wherever possible rather than reinforcing the entire tunnel.[2]
NATM/SEM is generally thought to have helped revolutionise the modern tunneling industry. Many modern tunnels have used this excavation technique.
The Sequential Excavation Method is very cost effective, even in karst conditions.[3]
^Alun Thomas (2019). Sprayed Concrete Lined Tunnels – 2nd ed. Abingdon, UK: Taylor & Francis. p. 288. ISBN 9780367209759.
^Levent Özdemir (2006). North American Tunneling. Abingdon, UK: Taylor & Francis. p. 246. ISBN 0-415-40128-3.
^Zhang, D., Xiong F., Zhang L., 2016
and 28 Related for: New Austrian tunneling method information
[citation needed] Channel Tunnel – Undersea rail tunnel linking France and England NewAustriantunnelingmethod – Method of modern tunnel design and construction...
Shotcrete used in the NewAustriantunnellingmethod, use of a tunnel boring machine (TBM) or tunnelling shield. But still tunnels are constructed which...
Thessaloniki. Built using the NewAustriantunnelingmethod, it was opened for traffic on 20 February 2024. The tunnel features four pedestrian crossings...
latest NewAustrianTunnelingMethod (NATM) is much below the snow line allowing all weather travel without the challenges of snow clearance. The tunnel will...
on Katraj Ghat. This tunnel replaced the Old Katraj Tunnel. The Tunnel was constructed using NATM (NewAustrianTunnellingMethod). It was opened on 15...
suitable for modern tunnelingmethods using shotcrete and rock bolts. Reference: Terzaghi, K. (1946). "Rock defects and loads on tunnel supports". In Proctor...
Pyeongtaek. The tunnel itself takes up about 82% of the total new line. The Yulhyeon Tunnel was built using the NewAustriantunnellingmethod (NATM) and is...
Rocce e nei Suoli (ADECO-RS), also known as The New Italian TunnelingMethod (NITM), is a modern tunnel design and construction approach. ADECO-RS was...
the NewAustrianTunnelingmethod (NATM). During the later years of his career, he was involved in nearly 90% of all tunnel constructions in Austria. After...
New AustrianTunnelingmethod Pedestrians, bicycles, and specialized small vehicles are prohibited. 50cc motorbikes can be ridden through the tunnel. Hazardous...
Discussions began in 1998 and construction started in 2014, using the NewAustrianTunnelingMethod. Breakthrough was achieved in January 2016 and it was inaugurated...
Cost : Approximately ₹3,200 crore The tunnel was built using the NewAustriantunnellingmethod and has been equipped with a semi-transverse ventilation system...
He is notable for being one of three men who developed the New AustrianTunnelingmethod. He lived in Iran along with his family to build Veresk Bridge...
Tunnel in Switzerland, opened in 2016. The tunnel was constructed using conventional construction methods (partly TBM method and newAustriantunnel method)...
accomplished using the New Austrian tunnelingmethod without disrupting the traffic moving on the street above. The tunnel was mined through glacial till,...
southern tube driving started in May 1997 from both portals using NewAustrianTunnellingmethod (NATM). Works were slowed in 1999 due to cost cutting for motorway...
(northbound) tunnel is rectangular, as it used the older dig-and-blast technique, while the new tube is oval, having been constructed using the NewAustrian tunnelling...
open-cut stations and one station in tunnel using NewAustrianTunnelingmethod (NATM). To complete the seven km bored tunnel sections between stations, the...
to ensure continuous operation of the tunnel. The tunnel was excavated using the NewAustrianTunnellingmethod, by means of drilling and explosive blasting...
using cut-and-cover, and the decomposed rock sections used the NewAustriantunnelingmethod (NATM). On 6 August 1985 Toa Payoh was the first MRT station...
indicating an alternative route. The tunnel was built through the Newhaven Chalk layer using the NewAustrianTunnellingmethod. The structure uses shotcrete...