Global Information Lookup Global Information

Navajo Generating Station information


Navajo Generating Station
Navajo Generating Station
Map
CountryUnited States
LocationNavajo Nation, near Page, Arizona
Coordinates36°54′12″N 111°23′25″W / 36.90333°N 111.39028°W / 36.90333; -111.39028
StatusShutdown
Commission date1974 (50 years ago) (1974)
1975 (49 years ago) (1975)
1976 (48 years ago) (1976)
Decommission dateNovember 18, 2019
Construction cost$650 million (1976) ($2.71 billion in 2023 dollars[1])
Owner(s)U.S. Bureau of Reclamation (24.3%)
Salt River Project (21.7%)
LADWP (former) (21.2%)
Arizona Public Service (14.0%)
NV Energy (11.3%)
Tucson Electric Power (7.5%)
Operator(s)Salt River Project
Thermal power station
Primary fuelCoal
Power generation
Units operational3 × 803 MW[2]
Nameplate capacity2,250 MW
Annual net output12,059 GW·h (2016)
External links
CommonsRelated media on Commons

Navajo Generating Station was a 2.25-gigawatt (2,250 MW), coal-fired power plant located on the Navajo Nation, near Page, Arizona, United States. This plant provided electrical power to customers in Arizona, Nevada, and California. It also provided the power for pumping Colorado River water for the Central Arizona Project, supplying about 1.5 million acre feet (1.85 km3) of water annually to central and southern Arizona. As of 2017 permission to operate as a conventional coal-fired plant was anticipated until 2017–2019,[3] and to December 22, 2044, if extended.[4] However, in 2017, the utility operators of the power station voted to close the facility when the lease expires in 2019.[5][6] In March 2019, the Navajo Nation ended efforts to buy the plant and continue running it after the lease expires.[7]

On November 18, 2019, the plant ceased commercial generation. Full decommissioning of the site is projected to take approximately three years.[8] On December 18, 2020, the three smokestacks were demolished.[9]

  1. ^ Johnston, Louis; Williamson, Samuel H. (2023). "What Was the U.S. GDP Then?". MeasuringWorth. Retrieved November 30, 2023. United States Gross Domestic Product deflator figures follow the MeasuringWorth series.
  2. ^ "Existing Electric Generating Units in the United States, 2007" (Excel). Energy Information Administration, U.S. Department of Energy. 2007. Retrieved 2009-07-09.
  3. ^ Cite error: The named reference randaz1 was invoked but never defined (see the help page).
  4. ^ Cite error: The named reference DOI72613 was invoked but never defined (see the help page).
  5. ^ Randazzo, Ryan (February 13, 2017). "Utilities vote to close Navajo coal plant at end of 2019". AZCentral. USA Today Network. Arizona Republic. Retrieved April 19, 2017.
  6. ^ Cindy Yurth (December 27, 2018). "2018: Year of Schism". Navajo Times. p. A1.
  7. ^ Randazzo, Ryan; Smith, Noel Lyn (March 22, 2019). "Navajo Nation votes to end efforts to purchase coal-fired power plant, sealing its fate". Arizona Republic. Retrieved August 16, 2019.
  8. ^ Locke, Katherine (November 18, 2019). "Navajo Generating Station shuts down permanently". Navajo-Hopi Oberserver. Retrieved November 19, 2019.
  9. ^ Randazzo, Ryan (18 December 2020). "3 massive coal stacks that long towered over Lake Powell demolished as crowds watched". AZ Central. Retrieved 18 December 2020.

and 28 Related for: Navajo Generating Station information

Request time (Page generated in 0.8673 seconds.)

Navajo Generating Station

Last Update:

Navajo Generating Station was a 2.25-gigawatt (2,250 MW), coal-fired power plant located on the Navajo Nation, near Page, Arizona, United States. This...

Word Count : 6829

Black Mesa and Lake Powell Railroad

Last Update:

the Navajo Nation which transported coal 78 miles (126 km) from the Peabody Energy Kayenta Mine near Kayenta, Arizona to the Navajo Generating Station power...

Word Count : 611

Best Available Retrofit Technology

Last Update:

to Navajo Generating Station" (PDF). Department of the Interior. July 25, 2013. Locke, Katherine (November 18, 2019). "Navajo Generating Station shuts...

Word Count : 491

Four Corners Generating Station

Last Update:

from the Navajo Nation government. The Four Corners Generating Station originally consisted of five generating units with a total rated generating capacity...

Word Count : 926

Navajo water rights

Last Update:

gallons of water/day from the Navajo aquifer, reducing the number of springs on the reservation. The Navajo Generating Station also consumed about 11 billion...

Word Count : 1116

Navajo Nation

Last Update:

The Navajo Nation (Navajo: Naabeehó Bináhásdzo), also known as Navajoland, is a Native American reservation of Navajo people in the United States. It...

Word Count : 11230

Kayenta Mine

Last Update:

year, providing about 8 million tons of coal annually to the Navajo Generating Station.: 1  The Kayenta mine was located near the northern edge of Black...

Word Count : 2342

List of tallest demolished freestanding structures

Last Update:

Demolition - Thunder Bay Generating Station - 650 Foot Stack Blast - Sept 09, 2021". YouTube. Retrieved 2022-05-02. "US Naval Radio Station Pearl Harbor - NPM"...

Word Count : 326

Navajo Mine and Railroad

Last Update:

New Mexico. The Navajo Mine Railroad has 13.8 miles (22.2 km) of track between the Four Corners Generating Station and Navajo Mine. Navajo Mine's coal lease...

Word Count : 1236

Grand Canyon

Last Update:

indicated that emissions of SO2, a sulfate precursor, from the Navajo Generating Station affected visibility in the canyon, mainly in the winter.: p.C-2...

Word Count : 13394

San Juan Generating Station

Last Update:

water supply to Navajo homes and businesses. The reservoir was renamed the Frank Chee Willetto Reservoir. "San Juan Generating Station". Enchant Energy...

Word Count : 423

Pinnacle West Capital

Last Update:

is generated by these plants. Pinnacle West owns three coal plants Cholla Power Plant, Four Corners Generating Station, and Navajo Generating Station (operated...

Word Count : 2064

Colorado River

Last Update:

building of the coal-fired Navajo Generating Station near Page, Arizona, in 1976. In 2019, the Navajo Generating Station ceased operation. The CAP was...

Word Count : 25097

List of tallest structures in the United States

Last Update:

Hayden Smelter Height: 1,001 ft (305 m) Flue gas stacks of the Navajo Generating Station Height: 775 ft (236 m) Page (36°54′12″N 111°23′25″W / 36.90333°N...

Word Count : 5218

Black Mesa Peabody Coal controversy

Last Update:

to a silo from where it was loaded and shipped by train to the Navajo Generating Station coal plant. The Black Mesa Mine's last day of operation was December...

Word Count : 766

Salt River Project

Last Update:

Mesquite Generating Station Navajo Generating Station (owns 42.9%). Commercial generation ceased November 2019. Palo Verde Nuclear Generating Station (owns...

Word Count : 2828

North Valmy Generating Station

Last Update:

ENVIRONMENTAL PROTECTION FACTSHEET" (PDF). Retrieved November 19, 2012. "Navajo Generating Station and Air Visibility Regulations: Alternatives and Impacts" (PDF)...

Word Count : 381

Central Arizona Project

Last Update:

to 24.3 percent of the power produced at the non-federal Navajo Generating Station, Navajo Project. The agreement also includes the delivery of power...

Word Count : 1253

Glen Canyon Dam

Last Update:

of the Pacific Southwest Water Plan, in 1968. The coal-fired Navajo Generating Station was built near Page, to make up for the electric power that was...

Word Count : 14104

History of the Grand Canyon area

Last Update:

stationary sources of Grand Canyon air pollution. In the 1980s the Navajo Generating Station at Page, Arizona, (15 miles away) was identified as the primary...

Word Count : 5820

List of power stations in Arizona

Last Update:

This is a list of electricity-generating power stations in the U.S. state of Arizona, sorted by type and name. In 2021, Arizona had a net summer capacity...

Word Count : 1153

Environmental impact of electricity generation

Last Update:

solutions exist, such as sewage cooling at the Palo Verde Nuclear Generating Station. Hydroelectricity's main cause of water usage is both evaporation...

Word Count : 8336

GE E60

Last Update:

transport coal from the Black Mesa Mine near Kayenta, Arizona to the Navajo Generating Station power plant at Page, Arizona. It was 78 miles (125.5 km) long...

Word Count : 2964

Los Angeles Department of Water and Power

Last Update:

would become coal-free by 2025 by divesting its 21% stake in Navajo Generating Station in 2016 and converting the Intermountain Power Plant to run on...

Word Count : 4657

Western Area Power Administration

Last Update:

the United States’ 547-megawatt entitlement from the coal-fired Navajo Generating Station near Page, Arizona until its closure on 18 November 2019. Hydropower...

Word Count : 1351

Colorado River Storage Project

Last Update:

comparable to a large coal-fired generating station such as the Navajo Generating Station. The Blue Mesa and Navajo Dams, built primarily to function...

Word Count : 2816

Railroad electrification in the United States

Last Update:

rail network. The Navajo Mine Railroad (reporting mark TNMR) operates between the Four Corners Generating Station and BHP's Navajo Coal Mine in New Mexico...

Word Count : 5366

List of tallest chimneys

Last Update:

skyscraperpage.com. "Conemaugh Generating Station Unit 1, State College – SkyscraperPage.com". skyscraperpage.com. "Conemaugh Generating Station Unit 2, State College...

Word Count : 3103

PDF Search Engine © AllGlobal.net