Railway project in the north-west of Victoria, Australia
The Murray Basin Rail Project is a major railway project in the north-west of Victoria, Australia. The project includes the conversion of a substantial portion of the Victorian freight rail network from the historical broad gauge to the standard gauge used in other parts of Australia, and the upgrading of track to enable higher axle loads for more efficient intrastate freight transfer.
The project is part of the Regional Rail Revival program and is being delivered by V/Line in its role as infrastructure manager of the Victorian rail network, under the direction of Public Transport Victoria. The project is jointly funded by the Victorian and Australian governments. Construction commenced in 2016 and was supposed to be completed by late 2018. However, the project stalled in 2018–2019, with half of the project still uncompleted. The project resumed in 2021, with majority of works completed by late 2023.
and 23 Related for: Murray Basin Rail Project information
The MurrayBasinRailProject is a major railway project in the north-west of Victoria, Australia. The project includes the conversion of a substantial...
May 2017). "Rail freight Victoria: Works to cause more delays for grain". The Weekly Times. Retrieved 22 June 2017. "MurrayBasinrailproject". Phoenix...
resources. In mid-2018, it was reported that RPV would take over the MurrayBasinRailProject from V/Line, following problems with the latter's management of...
clearly visible nearby as can the rail lines themselves. In 2017, there is a proposal entitled the, MurrayBasinrailproject designed to link Mildura to Portland...
was a rail station in Elmhurst, Victoria, Australia on the Avoca railway line. In 2017, there is a proposal entitled the, MurrayBasinrailproject designed...
crossing and signalling upgrades drainage structure upgrades MurrayBasinRailProject upgrades to the Victorian freight network including sleeper replacement...
platform and goods shed. In 2017, there was a proposal entitled the, MurrayBasinrailproject designed to link Mildura to Portland with standard gauge track...
commencement of the new rail link. The Avoca line was reopened in 2018 after a complete rebuild as part of the MurrayBasinRailProject, which also extended...
It was then reopened to regular traffic in 2019 as part of the MurrayBasinRailProject. The Navarre line opened from Ben Nevis to Navarre in 1914 and...
May 2017). "Rail freight Victoria: Works to cause more delays for grain". The Weekly Times. Retrieved 22 June 2017. "MurrayBasinrailproject". Archived...
January 2005, the Maryborough line was booked out of use. The MurrayBasinRailProject, which began in 2016, included reopening of the line from Ararat...
upgrade rail freight lines". business.theage.com.au. Archived from the original on 6 December 2012. Retrieved 27 April 2008. "MurrayBasinRailProject has...
Seymour and Albury providing double track along the section. The MurrayBasinRailProject, commenced in 2014, aimed to convert the Mildura, Manangatang...
crossing, located at the up end of the station, in 1973. Following MurrayBasinRailProject works, involving the conversion of the Mildura line to standard...
for the MurrayBasinRailproject, taken from the Federal Government's Asset Recycling Initiative. The $4 billion sale of the Australian Rail Track Corporation...
river basin and Murray–Darling Basin and the adjacent eastern highlands. The basin also extends into the upper coastward Burdekin river basin and Fitzroy...
Review report, released in April 2023, “confirmed that Inland Rail is an important project to meet Australia’s growing freight task, improve road safety...
Murrumbidgee River (/mʌrəmˈbɪdʒi/) is a major tributary of the Murray River within the Murray–Darling basin and the second longest river in Australia. It flows through...
Sydney, New South Wales, Australia. The project included the conversion of the existing Epping to Chatswood rail link to metro standards and connects the...
a tunnel. A tunnel project has been discussed several times in the Irish parliament. The idea for a 34-kilometre (21 mi) long rail bridge or tunnel continues...
initiatives are also outlined, including the already-underway MurrayBasinRailProject and improvements to regulation of interstate traffic. The second...
27 November 2010. "Jasper supports Oaklands rail line upgrade". Australia: Ken Jasper MLA, Member for Murray Valley. 9 July 2008. Archived from the original...
athabascau.ca/About-the-Athabasca-River-basin/Index.php About the Athabasca River Basin, Athabasca River Basin Research Institute Kelly, EN; Schindler...