The High Marnham Test Track is a linear railway test track created in 2009 and centred on Lodge Lane, Tuxford, in Nottinghamshire in the United Kingdom.[1]: 4, 8 It houses Network Rail's Rail Innovation & Development Centre (RIDC),[2]: 1 originally known as the Rail Vehicle Development Centre (RVDC).[3] The main route is approximately 14 miles (23 km) long[3] and rated for speeds up to 75 miles per hour (120 km/h).[4] It is primarily formed of a 10+1⁄2-mile (17 km) former section of the Lancashire, Derbyshire and East Coast Railway running between Thoresby Colliery Junction at the western end, and High Marnham Power Station at the eastern end.[2]: 2 [3] Additionally a 4-mile (6 km) branchline diverges northwards over the Bevercotes Colliery Branch via Boughton Brake Tunnel to Bevercotes.[1]: 4 [2]: 2
The main test track passes on a bridge directly over the East Coast Main Line, at the location of the former Dukeries Junction interchange station, but without a rail connection being provided.[5] Instead the test track is accessed from the national British railway network via Shirebrook Junction on the Robin Hood Line and the existing line from there to Thoresby Colliery Junction.[1]: 4 [5]
Access for trains is protected by an Annett's key under the supervision of an Engineering Technical Officer.[2]: 2 There is no signalling on the line owing to theft and vandalism, including the previous destruction of the Ollerton Colliery signal box.[3]
^ abc"Rail Innovation and Development Centre" (PDF). 21 June 2012. Archived from the original (brochure) on 21 May 2012. Retrieved 1 September 2012.
^ abcd"Rail Innovation & Development Centre – Site Data" (PDF). Network Rail. 6 August 2010. Archived from the original (presentation) on 21 May 2012. Retrieved 31 August 2012.
^ abcdO'Connor, Adam (18 September 2009). "Testing times at High Marnham". Rail Staff. Retrieved 31 August 2012.
^Cite error: The named reference bbc-trespassers was invoked but never defined (see the help page).
^ abRail Innovation and Development Centre, High Marnham(PDF) (Map). Network Rail. 3 August 2010. Archived from the original (map) on 21 May 2012. Retrieved 1 September 2012.
and 24 Related for: High Marnham Test Track information
HighMarnham Power Station was a coal fuelled power station in Nottinghamshire, to the west of the River Trent, approximately 0.5 miles (0.8 km) north...
Test Track High MarnhamTestTrack Maglev – AMT TestTrack, Powder Springs, Georgia Transportation Technology Center – Four testtracks, total length 48...
the Research Division used the Old Dalby TestTrack, and at Mickleover in Derby and The HighMarnhamTestTrack, the former LD&ECR from Shirebrook to Tuxford...
with sets of platforms on both lines. The high-level location is now part of the HighMarnhamTestTrack. There were three Tuxford stations, though none...
August 2009 as the HighMarnhamTestTrack. The line is used by Network Rail to test new engineering trains and on-track plant. The new test line runs from...
reopened by Network Rail in 2009 as the HighMarnhamTestTrack for testing trains between Thoresby Jn and HighMarnham at speeds of up to 75 mph, with extensive...
of the finest remaining limestone flora in Nottinghamshire. The HighMarnhamtesttrack run by Network Rail passes to the south of the village. This reuses...
The Robin Hood Line passes between Sookholme and Shirebrook. The HighMarnhamtesttrack run by Network Rail passes to the north of the village. It reuses...
August 2009 as the HighMarnhamTestTrack. The line is used by Network Rail to test new engineering trains and on-track plant. The new test line runs from...
deep-mined coal industry and have been chosen for Network Rail's HighMarnhamTestTrack which includes a short electrified section. Former Services The...
the line gives access to UK Coal's Thoresby Colliery and to the HighMarnhamTestTrack. There is some hope of reopening the line as a branch off the Robin...
access from Shirebrook to UK Coal's Thoresby Colliery and to the HighMarnhamTestTrack. There have been hypothetical suggestions of reopening the line...
Archived from the original on 22 August 2017. Retrieved 7 August 2017. Marnham, Patrick (4 February 2017). "Who's behind the mysterious rise of Emmanuel...
became redundant when HighMarnham Power Station closed in 2003; however, the line reopened in 2009 as HighMarnhamTestTrack. Former Services Stewart-Smith...
junction with a freight branch line that was used for coal traffic to HighMarnham power station via Warsop, Edwinstowe and Ollerton. Following closure...
immediate closure of the line from HighMarnham Power Station through Fledborough to Pyewipe Junction. These tracks were subsequently lifted. Today the...
invented in 1960. The Motor Industry Research Association has an important testtrack at Higham on the Hill near Hinckley. Hendrickson Europe make truck suspensions...
Saul Axton, James Aubrey as Lord 'Tiger' Harper, Sean Blowers as Ronny Marnham, Stuart Ong as Han, Martin Troakes as Glen Priddy, Anna Lauren as Katie...
Douglas Derbyshire who had recently completed the build of the nearby HighMarnham Power Station. In a bid to combine efforts at the design and construction...
the label's founder and programmer) and all films are newly mastered to High Definition from the best available film materials from the BFI National Archive...
locomotives that had been categorised as Type 5, these being a relatively high-powered locomotive suited to heavy freight trains, the newest of which being...