 D Line Subway Extension Project D Line 
The interior of Wilshire/La Brea station, under construction in November 2023.
Overview
StatusUnder construction
LocaleMid-Wilshire, Westwood, Century City, Los Angeles and Beverly Hills
Termini
  • Wilshire/Western (current)
  • Westwood/VA Hospital (future)
Stations7
Websitemetro.net/projects/westside
Service
TypeRapid transit
SystemLos Angeles Metro Rail
Operator(s)D Line Extension Metro (LACMTA)
History
Planned opening
  • 2025; 1 year's time (2025) (Section 1)[1]
  • 2026; 2 years' time (2026) (Section 2)[2]
  • 2027; 3 years' time (2027) (Section 3)[3]
Technical
Line length9 mi (14 km)
Number of tracks2
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
Route map
Map Section 1 highlighted in red, 2 in green, 3 in blue
Legend
D Line Extension
Westwood/VA Hospital
D Line Extension
D Line Extension
D Line Extension
I-405 (1961).svg I-405
D Line Extension
Westwood/UCLA
D Line Extension
Up arrow Section 3 (2027)
Down arrow Section 2 (2026)
D Line Extension
Century City/Constellation
D Line Extension
Wilshire/Rodeo
D Line Extension
Up arrow Section 2 (2026)
Down arrow Section 1 (2025)
D Line Extension
Wilshire/La Cienega
D Line Extension
Wilshire/Fairfax
D Line Extension
Wilshire/La Brea
D Line Extension
Wilshire/Western
D Line Extension
D Line 
D Line
to Union Station

Handicapped/disabled access All stations are accessible

The D Line Subway Extension Project, formerly known as the Westside Subway Extension, the Subway to the Sea, and the Purple Line Extension, is a construction project in Los Angeles County, California, extending the rapid transit D Line (formerly the Purple Line) of the Los Angeles Metro Rail system from its current terminus at Wilshire/Western in Koreatown, Los Angeles, to the Westside region.[4] The project is being supervised by the Los Angeles County Metropolitan Transportation Authority (Metro). The subway has been given high priority by Metro in its long-range plans,[5] and funding for the project was included in two county sales tax measures, Measure R and Measure M.[6]

The project's draft environmental impact statement was completed in September 2010, and a locally preferred alternative was selected in October 2010. Metro released the D Line (then the Purple Line) Extension's final environmental impact report in 2012. The entire project was approved at the Metro Board of Directors meeting on April 26, 2012, and construction has been separated into three sections.[7][8]

This project's first, second, and third sections are under construction. Combined, these three sections will add nearly 9 miles (14 km) of heavy rail service to the cities of Los Angeles and Beverly Hills. Construction on Section 1, between the existing Wilshire/Western station and the planned Wilshire/La Cienega station, started on November 11, 2014.[9] Section 2 pre-construction work between Wilshire/La Cienega station and Century City/Constellation station began in April 2017, and the official Section 2 groundbreaking ceremony took place on February 23, 2018.[10] Section 3 advanced utility relocation pre-groundbreaking work began in February 2018 for the future Westwood/UCLA and Westwood/VA Hospital stations.[11] The Section 3 groundbreaking ceremony took place on May 24, 2021. On April 2, 2024, the Los Angeles Daily News reported that the tunneling for the project had been completed.[12]

A fourth section has long been discussed, which would extend the D Line from the Westwood/VA Hospital station 3.5 miles under Wilshire Boulevard to Santa Monica beach, terminating at or near the E Line or future Lincoln Boulevard Transit Corridor terminus.[13]

  1. ^ @numble (January 29, 2024). "December 2023 status report for LA Metro's D Line Extension Section 1. 89.53% as of 12/29/23, +0.4% since 12/1/23. They will install normal gates and then replace them later with paddle gates. Contractor added 9 days to forecast completion (now 7/17/25)" (Tweet). Retrieved February 16, 2024 – via Twitter.
  2. ^ @numble (January 29, 2024). "December 2023 status report for LA Metro's D Line Extension Section 2. 63.8% as of 12/29/23, +0.9% since 12/1/23. Contractor forecasts completion to be 16 days later than prior forecast, around late October 2026 instead of early October" (Tweet). Retrieved February 16, 2024 – via Twitter.
  3. ^ @numble (January 29, 2024). "December 2023 status report for LA Metro's D Line Extension Section 3. 50% as of 12/29/23, -1.24% since 12/1/23. $106.7m of change orders were added, decreasing completion percentage ($52 of $100 contract is 52%, add $4 to contract and $52 of $104 is 50%)" (Tweet). Retrieved February 16, 2024 – via Twitter.
  4. ^ Cite error: The named reference MetroProjectSite was invoked but never defined (see the help page).
  5. ^ Cite error: The named reference LRTP was invoked but never defined (see the help page).
  6. ^ Cite error: The named reference MeasureR was invoked but never defined (see the help page).
  7. ^ "Westside Subway Extension Final EIR/EIS". Metro (LACMTA). February 6, 2013. Archived from the original on March 24, 2012. Retrieved July 12, 2013.
  8. ^ Steve Hymon (April 26, 2012). "Metro Board approves final environmental study for Westside Subway Extension". The Source. Metro. Retrieved April 26, 2012.
  9. ^ Dave Sotero (November 10, 2014). "Long wait over: groundbreaking held for Wilshire Boulevard subway extension". The Source. Metro. Retrieved November 19, 2014.
  10. ^ "Purple Line phase 2 groundbreaking!". February 23, 2018.
  11. ^ "Update on construction progress for the Purple Line Extension". Thesource.metro.net. January 11, 2018. Retrieved January 30, 2018.
  12. ^ Scauzillo, Steve (April 2, 2024). "Tunneling is finished on LA Metro D Line extension, a milestone for $9.5B project". Los Angeles Daily News. Retrieved April 3, 2024.
  13. ^ January 31, 2017, 10:00AMScott Frazier Comments (August 24, 2014). "Does L.A. Need the Santa Monica Purple Line Extension?". Urbanize LA. Retrieved May 18, 2022.{{cite web}}: CS1 maint: multiple names: authors list (link) CS1 maint: numeric names: authors list (link)

and 16 Related for: D Line Extension information

Request time (Page generated in 0.9315 seconds.)

D Line Extension

Last Update:

The D Line Subway Extension Project, formerly known as the Westside Subway Extension, the Subway to the Sea, and the Purple Line Extension, is a construction...

Word Count : 5333

Green Line Extension

Last Update:

The Green Line Extension (GLX) was a construction project to extend the Massachusetts Bay Transportation Authority (MBTA) Green Line light rail system...

Word Count : 11626

Los Angeles County Metropolitan Transportation Authority

Last Update:

G Line in the San Fernando Valley and the D Line at Westwood/UCLA Heavy Rail or Monorail extension from the D line at Westwood/UCLA to LAX Extension of...

Word Count : 4157

K Line Northern Extension

Last Update:

The K Line Northern Extension Project, formerly known as the Crenshaw Northern Extension Project, is a project planning a Los Angeles Metro Rail light...

Word Count : 1541

Los Angeles Metro Rail

Last Update:

opening of K Line south segment on 7/31/24 instead of first opening south segment in Fall 2023" (Tweet) – via Twitter. "Purple (D Line) Extension Transit Project"...

Word Count : 4994

Piccadilly line

Last Update:

Electric Railways of London (UERL) took over the line, it was renamed the Piccadilly line. Subsequent extensions were made to Cockfosters, Hounslow West and...

Word Count : 14926

Foothill Extension

Last Update:

Extension Project, formerly known as the Gold Line Foothill Extension Project, is an extension of the Los Angeles Metro Rail A Line light rail line from...

Word Count : 2028

History of Los Angeles Metro Rail and Busway

Last Update:

provisions to extend the line north to the D Line and Hollywood as part of the K Line Northern Extension project. Additionally, this alternative also...

Word Count : 14677

Link light rail

Last Update:

station in September 2016. An extension to Northgate station opened on October 2, 2021. The first phase of the 2 Line opened on April 27, 2024, between...

Word Count : 8364

CRRC HR4000

Last Update:

minute train frequency, and extensions of the D Line over three phases. Shortly after the groundbreaking of the D Line Extension in 2014, procurement started...

Word Count : 1255

Product line extension

Last Update:

A product line extension is the use of an established product brand name for a new item in the same product category. Line extensions occur when a company...

Word Count : 1539

East London line extension

Last Update:

The East London line extension (ELLX) project was a British railway engineering project in London, managed by Transport for London. The project involved...

Word Count : 3760

List of Los Angeles Metro Rail stations

Last Update:

@numble (November 27, 2023). "October 2023 status report for LA Metro's D Line Extension Section 2. 61.9% as of 10/27/23, +1.3% since 9/29/23. Contractor forecasts...

Word Count : 1420

Metro Line

Last Update:

Government of Canada. It was the first new line that was not an extension of the existing line. The line was expected to add 13,200 riders per weekday...

Word Count : 2385

Green Line D branch

Last Update:

The Green Line D branch (also referred to as the Highland branch or Riverside Line) is a light rail line in Boston, Brookline, Cambridge, Newton, and Somerville...

Word Count : 4015

LRT Line 2

Last Update:

network's revenue line to accommodate more passengers is set on tackling this problem. Future plans include a three-station westbound extension in Manila by...

Word Count : 8555

PDF Search Engine © AllGlobal.net