C1: 1 August 1993 (1993-08-01) C2: 27 December 2005 (2005-12-27) C3: 28 April 2011 (2011-04-28) C4: 18 December 2011 (2011-12-18) C5: 14 July 2023 (2023-07-14)
Commission date
C1: 14 September 2000 (2000-09-14) C2: 17 May 2011 (2011-05-17) C3: 6 December 2016 (2016-12-06) C4: 19 September 2017 (2017-09-19)
Construction cost
C1: US$900 million (1993)[1] C2: US$860 million C3 & C4: US$2.37 billion C5: US$3.48 billion
Owner(s)
Government of Pakistan
Operator(s)
Pakistan Atomic Energy Commission (Reactor management) China–Pakistan Power Corp. (Site and energy management)
Nuclear power station
Reactors
4 (operational) 1 (planned)
Reactor type
Pressurized Water Reactor (PWR)
Reactor supplier
Pakistan Nuclear Fuel Complex China National Nuclear Corp.
Cooling source
Indus River
Power generation
Units operational
C1: 325 MW C2: 325 MW C3: 340 MW C4: 340 MW
Make and model
C1-C4: CNP-300 C5: Hualong One
Units under const.
C5: 1200 MW
Nameplate capacity
1,330 MW (operational) 2,530 MW (planned)
Capacity factor
90.3% (lifetime)
External links
Website
Chashma Nuclear Power Plant
[edit on Wikidata]
The Chashma Nuclear Power Plant (or CHASNUPP) is a large commercial nuclear power plant located at Chashma in Mianwali, Punjab, Pakistan.[2]
Officially known as Chashma Nuclear Power Complex, the nuclear power plant is generating energy for industrial usage with four nuclear reactors with one being in construction phase in cooperation with China.[3] The energy site is covered under the International Atomic Energy Agency (IAEA) monitoring and safeguards which also provide funding for the site expansion.[4] Planning of the Chashma Nuclear Power Plant took place with France in 1973 but the site was completed with China's joining the project, and later providing the reactor in 1993.[5]
With growing demands of energy that was recognized in November 2006, the IAEA approved an agreement with Pakistan for new nuclear power plants to be built in the country with Chinese assistance when its Board of Governors of unanimously approved the safeguards agreement for any future Nuclear Power Plants that Pakistan will be constructing.[6]
^Chandra, Dr Suresh (2016). China-Pakistan Relations : Implications for India(googlebooks). New Delhi: Vij Books India Private Limited. ISBN 978-93-86019-94-3. Retrieved 19 August 2020.
^"Contract for Chashma nuclear plant unit-2 signed". DAWN.COM. 5 May 2004. Retrieved 14 August 2020.
^Kulkarni, Tanvi. "Sino-Pak Nuclear Engagement -I: The Big 'Deal' | IPCS". www.ipcs.org. Institute of Peace and Conflict Studies. Retrieved 19 August 2020.
^"Pakistan gets IAEA approval for new N-plant". Archived from the original on 27 July 2011. Retrieved 1 February 2010.
^Mahmood, S. B., Munir Ahmad Khan Memorial Reference, a memorial speech delivered at the Memorial Reference held in the memory of Munir Ahmed in Islamabad, 28 April 2007, access date: 18 August 2020.
^"Pakistan gets approval for nuke plant". 25 November 2006.
and 19 Related for: Chashma Nuclear Power Complex information
Officially known as ChashmaNuclearPowerComplex, the nuclearpower plant is generating energy for industrial usage with four nuclear reactors with one...
Chashma Nilore Karachi In Pakistan, nuclearpower is provided by six commercial nuclearpower plants with a net capacity of 3,262 megawatts (3.262 GW)...
Officially known as Karachi NuclearPowerComplex, the power generation site is composed of three commercial nuclearpower plants. The K-1 commenced its...
Officially known as ChashmaNuclearPowerComplex, the nuclearpower plant is generating energy for industrial usage with four nuclear reactors with one...
production and nuclear reprocessing facilities are being expanded at Khushab, New Labs and Chashma. Pakistan's first indigenous nuclear reactor was commissioned...
industrial complex that consisted of separate uranium enrichment and a fuel fabrication plant to support the grid operations of the ChashmaNuclearPower Plant...
ensure that Nuclear proliferation is not repeated and have assured the IAEA about the transparency of Pakistan's upcoming ChashmaNuclearPower Plant. In...
The Kundian Nuclear Fuel Complex is located near the location of the ChashmaNuclearPower Plant. Pakistan portal Energy portal Nuclearpower in Pakistan...
Zaporizhzhia NuclearPower Plant The Gravelines NuclearPower Station The Cattenom NuclearPower Plant The Hamaoka NuclearPower Plant The Ōi NuclearPower Plant...
levelled up the nuclear energy programme up ~ 78% for two combined 664 MW commercial nuclear plants, C-3 and C-4 at ChashmaNuclearPowerComplex to be completed...
assistance at the close vicinity of Chashmanuclearpowercomplex. Aziz termed this project as "milestone" in the history of nuclear technology in Pakistan. In...
The Nuclear Institute for Food and Agriculture, known as NIFA, (جوہری ادارہ برائے خوراک و زراعت) is one of four agriculture and food irradiation research...
Pakistan's Nuclear Energy Vision 2050 targets a capacity of 40,000 MWe, with 8,900 MWe expected by 2030. In June 2008, the nuclearcomplex at Chashma in Punjab...
the heavy water is located in Multan, that it sells to nuclearpower plants in Karachi and Chashma. In early 1980s, Pakistan succeeded in acquiring a tritium...
for production of reactor-grade plutonium, and a commercial nuclearpower plant in Chashma, advising the federal government on key matters regarding the...
Pakistan, four reactors are planned at Karachi NuclearPowerComplex and one reactor at ChashmaNuclearPower Plant, out of which two are under construction...
River System Authority Pakistan Commissioner for Indus Waters Water and Power Development Authority "The Official Web Gateway to Pakistan". The Official...
2001] 2. Habib Bank A.G.Zurich [1 stamp Rs.5 20 March 2001] 3. The ChashmaNuclearPower Plant [1 stamp Rs.2 29 March 2001] 4. 9th SAF Games [2 stamp Rs...