Global Information Lookup Global Information

Capitol Corridor information


Capitol Corridor
A Capitol Corridor train in Fremont, California, in 2024
Overview
Service typeInter-city rail, commuter rail
LocaleNorthern California
First serviceDecember 12, 1991 (1991-12-12)
Current operator(s)Capitol Corridor Joint Powers Authority, in partnership with Amtrak, BART, Caltrans and Transit Services America
Annual ridership921,112 (FY23) Increase 36.7%[a][1]
Websitecapitolcorridor.org
Route
TerminiAuburn
San Jose
Stops17
Distance travelled168 miles (270 km)
Average journey time314 hours
Service frequency15 round trips (weekdays)
11 round trips (weekends)
Train number(s)520–553, 720–751
On-board services
Class(es)Coach Class
Disabled accessTrain lower level, all stations
Catering facilitiesCafé
Baggage facilitiesOverhead bins, luggage racks
Technical
Rolling stock
  • California Car
  • EMD F59PHI
  • Siemens Charger
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
Track owner(s)UP, JPBX
Route map
Map Capitol Corridor highlighted in black
Legend
Capitol Corridor
California Zephyr
to Chicago
Capitol Corridor
Colfax
discontinued
2000
Capitol Corridor
0 mi
0 km
Auburn
Capitol Corridor
14 mi
23 km
Rocklin
Capitol Corridor
18 mi
29 km
Roseville
Capitol Corridor
American River
Capitol Corridor
Capitol Corridor
Capitol Corridor
Capitol Corridor
Capitol Corridor
San Joaquins to Bakersfield Right arrow
Left arrowCoast Starlight to Seattle
Capitol Corridor
35 mi
56 km
Sacramento Sacramento RT Light Rail
Capitol Corridor
Capitol Corridor
Capitol Corridor
I Street Bridge
over Sacramento River
Capitol Corridor
49 mi
79 km
Davis
Capitol Corridor
Fairfield–Vacaville
Capitol Corridor
75 mi
121 km
Suisun–Fairfield
Capitol Corridor
Capitol Corridor
Capitol Corridor
Benicia–Martinez Bridge
over Carquinez Strait
Capitol Corridor
Capitol Corridor
San Joaquins
to Bakersfield
Capitol Corridor
93 mi
150 km
Martinez
Capitol Corridor
Hercules
planned
Capitol Corridor
112 mi
180 km
Richmond Bay Area Rapid Transit
Capitol Corridor
118 mi
190 km
Berkeley
Capitol Corridor
120 mi
193 km
Emeryville
Capitol Corridor
Oakland–16th Street
closed
1994
Capitol Corridor
Oakland Maintenance Facility
Capitol Corridor
125 mi
201 km
Oakland–Jack London Square
Capitol Corridor
130 mi
209 km
Oakland Coliseum Bay Area Rapid Transit Oakland International Airport
Capitol Corridor
Capitol Corridor
planned reroute
via Coast Line
Capitol Corridor
Capitol Corridor
Capitol Corridor
138 mi
222 km
Hayward
Capitol Corridor
Capitol Corridor
Alameda Creek
Capitol Corridor
Capitol Corridor
Capitol Corridor
ACE
to Stockton–Downtown
Capitol Corridor
Capitol Corridor
Ardenwood
planned
Capitol Corridor
Capitol Corridor
Capitol Corridor
150 mi
241 km
Fremont Altamont Corridor Express
Capitol Corridor
Capitol Corridor
Capitol Corridor
161 mi
259 km
Santa Clara–Great America Altamont Corridor Express Santa Clara Valley Transportation Authority
Capitol Corridor
Capitol Corridor
Caltrain
to San Francisco
Capitol Corridor
165 mi
266 km
Santa Clara Caltrain Altamont Corridor Express
Capitol Corridor
168 mi
270 km
San Jose Santa Clara Valley Transportation Authority Caltrain Altamont Corridor Express
Capitol Corridor
222 mi
357 km
planned extension to
Salinas
Capitol Corridor
222 mi
357 km
planned extension to
Salinas
Capitol Corridor
Tamien Santa Clara Valley Transportation Authority Caltrain
Capitol Corridor
Morgan Hill Caltrain
Capitol Corridor
Gilroy Caltrain
Capitol Corridor
Santa Clara County
Monterey County
Capitol Corridor
Pajaro/Watsonville
planned
Capitol Corridor
Castroville
planned
Capitol Corridor
Salinas
Capitol Corridor
Coast Starlight
to Los Angeles

Handicapped/disabled access All stations are accessible

The Capitol Corridor is a 168-mile (270 km) passenger train route in Northern California operated by Amtrak between San Jose, in the Bay Area, and Auburn, in the Sacramento Valley. The route is named after the two points most trains operate between, San Jose (which was the first state capital of California) and Sacramento (the current capital, with the State Capitol building). The route runs roughly parallel to I-880 and I-80. Some limited trips run between Oakland and San Jose. A single daily round trip runs between San Jose and Auburn, in the foothills of the Sierra Nevada. Capitol Corridor trains started in 1991.

Like all regional trains in California, the Capitol Corridor is operated by a joint powers authority. The Capitol Corridor Joint Powers Authority (CCJPA) is governed by a board that includes two elected representatives from each of eight counties the train travels through. The CCJPA contracts with the San Francisco Bay Area Rapid Transit District to provide day-to-day management of the service, Amtrak to operate the trains, and Transit Services America to maintain the rolling stock (locomotives and passenger cars). The California Department of Transportation (Caltrans) provides the funding to operate the service and also owns the rolling stock.


Cite error: There are <ref group=lower-alpha> tags or {{efn}} templates on this page, but the references will not show without a {{reflist|group=lower-alpha}} template or {{notelist}} template (see the help page).

  1. ^ "Amtrak Fiscal Year 2023 Ridership" (PDF). Amtrak. November 27, 2023. Retrieved November 30, 2023.

and 23 Related for: Capitol Corridor information

Request time (Page generated in 0.8236 seconds.)

Capitol Corridor

Last Update:

The Capitol Corridor is a 168-mile (270 km) passenger train route in Northern California operated by Amtrak between San Jose, in the Bay Area, and Auburn...

Word Count : 2910

Capitol

Last Update:

Capitoline Hill in Rome (from which the word capitol derives) Capitols, former name of the Capitol Corridor passenger train route in California, United...

Word Count : 391

Amtrak California

Last Update:

three state-supported Amtrak regional rail routes in California – the Capitol Corridor, the Pacific Surfliner, and the San Joaquins – and their associated...

Word Count : 1885

Oakland Coliseum station

Last Update:

Orange, Green, and Blue lines; the Amtrak station is served by the Capitol Corridor service. The BART station opened in 1972, serving the then-new Oakland...

Word Count : 2597

List of Amtrak routes

Last Update:

Lake Shore Limited split into two sections to serve branches. On the Capitol Corridor, Cascades, Empire Service, Keystone Service, Northeast Regional, and...

Word Count : 1884

San Joaquins

Last Update:

structure was modeled after the Capitol Corridor Joint Powers Authority, which has been operating the Capitol Corridor regional train in Northern California...

Word Count : 4758

Siemens Charger

Last Update:

Northeast Corridor in September 2016 which resulted in federal certification for 125-mile-per-hour (201 km/h) operations. Revenue testing on the Capitol Corridor...

Word Count : 4048

New Hampshire Rail Transit Authority

Last Update:

the state. The initial focus of the NHRTA has been on the proposed Capitol Corridor, which would connect Concord, New Hampshire, with Boston, Massachusetts...

Word Count : 1118

List of Amtrak stations in California

Last Update:

and operating assistance for three corridors: the Pacific Surfliner, the San Joaquins and the Capitol Corridor. This is the list of 74 active Amtrak...

Word Count : 378

Coast Starlight

Last Update:

There is also a proposal in the Capitol Corridor Vision plan to improve the right-of-way shared by the Capitol Corridor and Coast Starlight between Oakland...

Word Count : 2574

Dumbarton Rail Corridor

Last Update:

Dumbarton Rail Corridor would provide service between Union City in the East Bay (where passengers could connect with BART, ACE and Capitol Corridor trains)...

Word Count : 6997

Texas Capitol View Corridors

Last Update:

The Capitol View Corridors are a series of legal restrictions on construction in Austin, Texas, aimed at preserving protected views of the Texas State...

Word Count : 1923

Monterey County Rail Extension

Last Update:

discussions with the Capitol Corridor Joint Powers Authority (CCJPA) and the Caltrans Division of Rail to extend Capitol Corridor service south from San...

Word Count : 4014

Caltrain

Last Update:

opened discussions with the Capitol Corridor Joint Powers Authority and the Caltrans Division of Rail to extend Capitol Corridor service south from San Jose...

Word Count : 15940

North Valley Rail

Last Update:

Future plans include a connection to the Capitol Corridor in Sacramento.[citation needed] Capitol Corridor and North Valley Rail cross in Sacramento —...

Word Count : 260

Northern California megaregion

Last Update:

Retrieved 2019-02-01. "CCJPA Vision Plan, What the Capitol Corridor Can Become". Capitol Corridor. Retrieved 2019-02-01. "Northern California Mega-Region...

Word Count : 931

California Zephyr

Last Update:

Vurek, Matthew Gerald (2016). Images of Modern America: California’s Capitol Corridor. Arcadia Publishing. pp. 42, 43. ISBN 9781467124171. "Service Adjustments...

Word Count : 2441

Emeryville station

Last Update:

California, United States. The station is served by the California Zephyr, Capitol Corridor, Coast Starlight, and San Joaquins. The station is the primary connection...

Word Count : 911

Pacific Surfliner

Last Update:

Springs and Indio; and to San Jose or Oakland (with connections to Capitol Corridor trains) via Paso Robles. Because the stations at the ends of the line...

Word Count : 2416

Martinez station

Last Update:

round trips of the San Joaquin corridor service, and fifteen daily round trips (eleven on weekends) of the Capitol Corridor service. Martinez is also served...

Word Count : 1153

Fremont station

Last Update:

States. The station is served by Amtrak Capitol Corridor commuter rail/intercity rail service and the Altamont Corridor Express (ACE) commuter rail service...

Word Count : 705

United States Capitol

Last Update:

The United States Capitol, often called the Capitol or the Capitol Building, is the seat of the United States Congress, the legislative branch of the federal...

Word Count : 9522

Texas State Capitol

Last Update:

proposing a list of protected "Capitol View Corridors" along which construction would not be permitted, so as to protect the capitol's visibility from a series...

Word Count : 2806

PDF Search Engine © AllGlobal.net