Global Information Lookup Global Information

BARD Offshore 1 information


BARD Offshore 1
Map
Country
  • Germany
Coordinates54°21′30″N 5°58′30″E / 54.3583°N 5.975°E / 54.3583; 5.975
StatusOperational
Commission date
  • 2010
Wind farm
Type
  • Offshore
Hub height
  • 60 m (200 ft)
Rotor diameter
  • 122 m (400 ft)
Power generation
Units operational80 × 5 MW
Make and modelBARD 5.0 (80)
Nameplate capacity
  • 400 MW
External links
Websitewww.bard-offshore.de/en/projects/offshore/bard-offshore-1
CommonsRelated media on Commons
Map
Wind farm layout
BARD Offshore 1's location in the wind farms of the German Bight

BARD Offshore 1 is a 400 megawatt (MW) North Sea offshore wind farm with 80 BARD 5.0 turbines. Since the owner could not buy such 5MW offshore wind turbines in sufficient numbers in 2006, Dr. Bekker set up its own production of turbines. This should serve as the legacy for his children. The systems were developed by aerodyn Energiesysteme GmbH. A plant for rotor blades and nacelle assembly was built in Emden and a plant for the offshore foundations in Cuxhaven. Two turbine prototypes were set up at the Rysumer Nacken in 2007, and another prototype in Hooksiel in 2008. Construction was finished in July 2013[1] and the wind farm was officially inaugurated in August 2013.[2] The wind farm is located 100 kilometres (60 mi) northwest of the isle Borkum in 40-metre (130 ft) deep water.[3]

Laying of cables to connect the wind farm started on 23 July 2009.[4] The 200 km connection is the longest of its kind in the world. It is also the first connection of an offshore wind park realized as HVDC-transmission. Construction of the wind turbines began in March 2010.[5] The first turbine became operational at the beginning of December 2010. Construction was assisted by the purpose-built Wind Lift 1 barge / platform, which placed the 470 ton, 21 meter foundations on the sea bed.

The project has run into serious and unclear problems, including being three years behind schedule and, at a cost of €3 billion, run significantly over budget. A diver[6] and a worker died during construction.[7][8] The farm was supposed to go online in August 2013, but a series of setbacks, including a fire at a transmission station in March 2014, have delayed its activation.[9] BARD went bankrupt in November 2013.[10] Problems include overvoltage and harmonics[11] between BARD and the BorWin 1 grid link and BorWin Alpha HVDC converter platform.[12]

BARD's original owner had decided to make all components within the company, and troubles from the custom transformer are unrelated to standard equipment used elsewhere.[13]

As of January 2015, most of the turbines were not supplying power to shore, costing ratepayers €2million per day.[14]

In September 2015, StatKraft and Ocean Breeze extended their contract for two years.[15]

By May 2016, the company website stated that the wind farm had produced 3 terawatt-hours (11 PJ), and was running stably at full capacity.[16]

Availability increased from 66% in 2014 to 95% by 2017. The feed-in tariff is €150/MWh to €190/MWh until 2024.[17] Macquarie Infrastructure and Real Assets purchased the facility in 2019.[18]

  1. ^ Press release: Pioneering wind farm project BARD Offshore 1 successfully completed on the high seas Archived 2014-08-21 at the Wayback Machine
  2. ^ German Federal Minister Inaugurates BARD Offshore 1
  3. ^ 5-MW BARD Near-shore Wind Turbine Erected in Germany
  4. ^ DDP: Laying cables to wind farm started (in German)
  5. ^ Wind farm in the ocean ready to go (in German)
  6. ^ "Tauchunfall im Windpark" Diving accident in the wind farm Die Welt, 27 July 2010. Accessed: 25 February 2015.
  7. ^ Pressemitteilung der BARD-Gruppe vom 27. Januar 2012 Archived 2015-04-02 at the Wayback Machine (PDF; 117 kB)
  8. ^ Mitteilung der DGzRS, retrieved, 4 February 2012[permanent dead link]
  9. ^ Germany's Expensive Gamble on Renewable Energy by Matthew Karnitschnig, The Wall Street Journal, August 26, 2014.
  10. ^ "Bard is bankrupt". renewablesinternational.net. Archived from the original on 2016-03-04. Retrieved 2015-11-02.
  11. ^ "Rätselhafter Defekt legt größten Windpark lahm" Enigmatic defect paralyzes largest wind farm Die Welt, 3 September 2014. Accessed: 25 February 2015.
  12. ^ Knight, Sara (29 May 2015). "Politics block German offshore wind link". windpowermonthly.com. Archived from the original on 6 September 2015.
  13. ^ "Größter deutscher Meereswindpark fällt aus" The largest German offshore wind park falls out Die Welt, 7 July 2014. Accessed: 25 February 2015.
  14. ^ "Im größten Meereswindpark dreht sich wenig" In the largest offshore wind park little turns Die Welt, 26 January 2015. Accessed: 25 February 2015.
  15. ^ "Statkraft vermarktet Strom aus Bard Offshore 1 für weitere zwei Jahre". windmesse.de.
  16. ^ "Ocean Breeze | Home". Archived from the original on 2016-07-05.
  17. ^ Heap, Richard (30 July 2020). "Bard Offshore 1: 'How we turned it around' - Richard Heap". www.awordaboutwind.com. Archived from the original on 14 August 2020.
  18. ^ "Macquarie to acquire 400MW BARD Offshore 1 wind farm from Unicredit". 8 August 2019. Archived from the original on 21 October 2020.

and 23 Related for: BARD Offshore 1 information

Request time (Page generated in 0.8412 seconds.)

BARD Offshore 1

Last Update:

BARD Offshore 1 is a 400 megawatt (MW) North Sea offshore wind farm with 80 BARD 5.0 turbines. Since the owner could not buy such 5MW offshore wind turbines...

Word Count : 797

List of offshore wind farms in Germany

Last Update:

"Equinor sells stake in Arkona offshore wind farm". www.energy-infrastructure-partners.com. 23 November 2021. BARD Offshore 1 (Germany) wind farm 4C. Retrieved:...

Word Count : 992

List of offshore wind farms in the North Sea

Last Update:

Retrieved: 27 October 2010. Alpha Ventus (Germany) offshore wind farm 4C . Retrieved: 19 August 2010. BARD Offshore 1 (Germany) wind farm 4C. Retrieved: 17 February...

Word Count : 1169

Anholt Offshore Wind Farm

Last Update:

400 megawatts (MW), it is one of the largest offshore wind farm in the world (along with BARD Offshore 1) and was the largest in Denmark from 2013 to...

Word Count : 1283

List of offshore wind farms

Last Update:

eröffnet Offshore-Windpark Bard 1 Archived 2013-08-28 at the Wayback Machine Retrieved 2013-08-26 German Federal Minister Inaugurates BARD Offshore 1 Archived...

Word Count : 3594

HVDC BorWin1

Last Update:

an offshore wind park to shore, and the first to use voltage source converters (VSC) in Germany. It connects the offshore wind park BARD Offshore 1 and...

Word Count : 492

Israel

Last Update:

Archived from the original on 18 September 2016. Retrieved 4 September 2016. Bard, Mitchell (2003). The Founding of the State of Israel. Greenhaven Press....

Word Count : 39126

Wind power in Germany

Last Update:

2 GW from offshore installations. In 2020, 23.3% of the country's total electricity was generated through wind power, up from 6.2% in 2010 and 1.6% in 2000...

Word Count : 2229

Steve Curtis

Last Update:

Steve Curtis MBE (born 9 June 1964, in Wimbledon) is a British eight time offshore powerboat racing World Champion. Curtis's father Clive ran boat-building...

Word Count : 435

Bard Ventures

Last Update:

Bard Ventures Ltd. (TSX-V: CBS) was a Canadian mining and exploration company headquartered in Vancouver. The company conducted exploratory drilling to...

Word Count : 612

Aerovide

Last Update:

Goldwind, Pfleiderer, AREVA Multibrid, WinWind, CSIC HZ Windpower, BARD Offshore, SANY, Shanghai Electric, CNBM, Mingyang Wind Power, Goudian United...

Word Count : 635

Gulf War

Last Update:

War Over the Price of Oil". International Journal of Global Energy Issues. Bard, Mitchell. "The Gulf War". Jewish Virtual Library. Retrieved 25 May 2009...

Word Count : 27837

Ottawa

Last Update:

Pittman Lett: Ottawa's first city clerk and bard (1819–1892). B.D.C. Ottawa Consulting. p. 412. ISBN 978-1-771363-42-6. Ottawa City Council, 31 May 1875...

Word Count : 16154

Boston Scientific

Last Update:

October 8, 2012. Vessix Vascular, November 8, 2012. Bard Electrophysiology, November 1, 2013. C.R. Bard Electrophysiology, June 28, 2013. IoGyn, May 6, 2014...

Word Count : 7633

Climate of France

Last Update:

575–588. Bibcode:2008JQS....23..575H. doi:10.1002/jqs.1212. S2CID 56429143. Bard, Édouard (2013). "Le dernier réchauffement climatique". La Recherche (474):...

Word Count : 13085

Svalbard

Last Update:

Norwegian analogue of Svalbarði, which in turn derives from svalr ('cold') and barð ('edge', 'ridge', 'turf', 'beard'). The Icelandic Annals record that Svalbarði...

Word Count : 9867

Denmark

Last Update:

of Greenland (Senior project). Bard College. Archived from the original on 23 October 2020. Retrieved 21 October 2020. [1] Archived 23 October 2020 at the...

Word Count : 20165

California oil and gas industry

Last Update:

Battle over Offshore Drilling (SUNY Albany, 1994) Hutchinson, W. H. Oil, Land, and Politics: The California Career of Thomas Robert Bard (2 vol 1965)...

Word Count : 4736

Hamas

Last Update:

hierarchical command chain and political leadership in Gaza. Ilana Kass and Bard O'Neill, likening Hamas's relationship with the Brigades to the political...

Word Count : 39606

Class 1 World Powerboat Championship

Last Update:

premier class of offshore powerboat racing in the world. Class 1 is considered one of the most spectacular marine motorsports. A Class 1 race-boat has twin...

Word Count : 1228

Crane vessel

Last Update:

653 short tons) for modern ships. The largest crane vessels are used for offshore construction. The cranes are fitted to conventional monohulls and barges...

Word Count : 3794

Wales

Last Update:

excluded, religious denominations came to dominate the competitions, with bardic themes becoming scriptural and didactic. Developments in 19th-century Welsh...

Word Count : 21928

Marine energy

Last Update:

i.e. obtained from the kinetic energy of large bodies of moving water. Offshore wind power is not a form of marine energy, as wind power is derived from...

Word Count : 1351

PDF Search Engine © AllGlobal.net