You can help expand this article with text translated from the corresponding article in German. (August 2013) Click [show] for important translation instructions.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Consider adding a topic to this template: there are already 9,146 articles in the main category, and specifying|topic= will aid in categorization.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing German Wikipedia article at [[:de:Wienerwaldtunnel]]; see its history for attribution.
You may also add the template {{Translated|de|Wienerwaldtunnel}} to the talk page.
For more guidance, see Wikipedia:Translation.
Wienerwald Tunnel
Entrance to the Wienerwald Tunnel from the Tullnerfeld side
Overview
Status
Active
Operation
Opened
9 December 2012 (2012-12-09)
Technical
Line length
13,356 m (8.299 mi)
Track gauge
1,435 mm (4 ft 8+1⁄2 in) standard gauge
The Wienerwald Tunnel (German: Wienerwaldtunnel) is a 13.35 km (8.30 mi) long railway tunnel near Vienna, passing underneath the northern part of Wienerwald. It is part of a 250-kilometre-per-hour (160 mph) section between Vienna and St. Pölten which is part of Austria's Western Railway.
The Wienerwald Tunnel was constructed as part of a major expansion of Austria's most important rail corridor, it was intentionally built as a measure to minimise gradients and facilitate high speed traffic, as well as for better accessibility to the newly constructed Wien Hauptbahnhof central station in Vienna. It is divided into two distinct sections, comprising a single bore accommodating a pair of tracks and two parallel bores each carrying a single track; it also meets up with several other neighbouring tunnels, including the Lainzer Tunnel. Construction of the Wienerwald Tunnel commenced in autumn 2004, largely relying on conventional methods. Breakthrough was achieved in early 2010, after which fitting out commenced. The tunnel has been in operational use since 9 December 2012.
The WienerwaldTunnel (German: Wienerwaldtunnel) is a 13.35 km (8.30 mi) long railway tunnel near Vienna, passing underneath the northern part of Wienerwald...
Scheitel Tunnel (3,489 m) WienerwaldTunnel (13,350 m) Bosruck Tunnel (5,500 m) Falkenberg Tunnel (3,000 m, in planning) Ganzstein Semmering Tunnel (3,489...
one part of a wider tunnel network that includes the neighbouring WienerwaldTunnel, it connects Austria's Western, Southern, Eastern and Donauländebahn...
speed of 250 km/h (155 mph) is to be completed in 2015, including the WienerwaldTunnel. In Vienna, the former Südbahnhof terminal station was demolished...
chain of the Alps follows the watershed from the Mediterranean Sea to the Wienerwald, passing over many of the highest and most well-known peaks in the Alps...
Autobahn and Ostautobahn, and is the busiest road in Vienna. The protected Wienerwald forest area in the West and Northwest of the city has been left mostly...
World War II subterranean command bunker situated in the densely forested Wienerwald western parts of Ottakring, the 16th district of Vienna. Commonly known...
Notes Metric Imperial 500 mm 19+3⁄4 in Austria Geriatriezentrum Am Wienerwald Feldbahn Argentina Tren del Fin del Mundo, Ushuaia - Parque Nacional Tierra...