Global Information Lookup Global Information

West Coast Expressway information


Expressway 32 shield}}
Expressway 32
Lebuhraya Pesisiran Pantai Barat
West Coast Expressway
Map
Route information
Maintained by West Coast Expressway Sdn Bhd
Length233.0 km (144.8 mi)
Status6 sections opened:
Perak section:
  • All 4 section completed, and opened for traffic

Selangor section:
  • Section 5: Bandar Bukit Raja–Kapar
  • Section 6: Kapar–Assam Jawa
Existed2014–present
HistoryOpened in stages from June 2019, expected completion in 2026; 2 years' time (2026).
Major junctions
North endWest Coast Expressway FT 60 Federal route 60 and West Coast Expressway North–South Expressway Northern Route North–South Expressway Northern Route at Changkat Jering, Perak
Major intersectionsWest Coast Expressway FT 5 Federal route 5
West Coast Expressway FT 58 Federal route 58
West Coast Expressway Kuala Lumpur–Kuala Selangor Expressway Kuala Lumpur–Kuala Selangor Expressway
West Coast Expressway New North Klang Straits Bypass New North Klang Straits Bypass
West Coast Expressway FT 2 Federal Highway
West Coast Expressway FT 3216 Jalan Batu Tiga Lama
West Coast Expressway Shah Alam Expressway Shah Alam Expressway
West Coast Expressway South Klang Valley Expressway South Klang Valley Expressway
South endWest Coast Expressway FT 31 Jalan Banting–Dengkil at Banting, Selangor
Location
CountryMalaysia
Primary
destinations
Taiping, Pantai Remis, Beruas, Sitiawan, Teluk Intan, Hutan Melintang, Sabak Bernam, Sekinchan, Kuala Selangor, Kapar, Sungai Besar, Bukit Raja, Klang, Banting
Highway system
  • Highways in Malaysia
  • Expressways
  • Federal
  • State

The West Coast Expressway (E32), abbreviated WCE, is an interstate controlled-access highway running along the west coast of Peninsular Malaysia. The 233-kilometre (145-mile) expressway is currently under construction, with several sections open for public use. Once completed, the expressway will run between Changkat Jering, Perak and Banting, Selangor, following federal routes 5 and 60 for most of its route. The expressway will operate in three sections, with sections of federal route 5 completing the missing connections; these sections will be upgraded to limited-access roads. The expressway is expected to be fully completed by the end of 2025,[1][2] except for a 10 km stretch from Section 7B which is expected to be completed by June 2026.[3]

The expressway is being built by Konsortium Lebuhraya Pantai Barat. Approval was given by the government for the construction, which was to begin from 20 December 2013 and was to be completed within five years.[4] It originally was given route code E28 but later changed to E32, and E28 was used by Sultan Abdul Halim Muadzam Shah Bridge. The project was delayed and actual construction began in May 2014. Currently, a 31.5-kilometre (19.6 mi) segment between Kapar and Assam Jawa,[5] a 19-kilometre (12 mi) segment from Hutan Melintang to Teluk Intan[6] and a 80-kilometre (50 mi) segment from Lekir to Taiping[7] are opened to traffic.

Once the expressway is completed, it will be the fourth longest in Peninsular Malaysia, after the North-South Expressway Northern Route, the East Coast Expressway and the North-South Expressway Southern Route.

  1. ^ "Hot spots coming up along WCE". Edgeprop.my. Retrieved 19 December 2019.
  2. ^ TAHIR, MOHD IZZATUL IZUAN (6 December 2022). "Lebuhraya Taiping-Banting beroperasi sepenuhnya 2025". Sinar Harian (in Malay). Retrieved 1 June 2023.
  3. ^ "Bumpy path to profitability | The Star". www.thestar.com.my. Retrieved 20 August 2020.
  4. ^ http://www.wce.com.my/media-updates/New-beginning-for-KEuro [dead link]
  5. ^ Cite error: The named reference :2 was invoked but never defined (see the help page).
  6. ^ Arif, Zahratulhayat Mat (3 May 2019). "Section 8 of West Coast Expressway opens today". NST Online. Retrieved 19 December 2019.
  7. ^ Bernama (2 September 2019). "Sections 9, 10 of WCE now open". NST Online. Retrieved 19 December 2019.

and 23 Related for: West Coast Expressway information

Request time (Page generated in 0.8342 seconds.)

West Coast Expressway

Last Update:

The West Coast Expressway (E32), abbreviated WCE, is an interstate controlled-access highway running along the west coast of Peninsular Malaysia. The...

Word Count : 1315

East Coast Expressway

Last Update:

East Coast Expressway (ECE; Malay: Lebuhraya Pantai Timur, LPT) is an interstate controlled-access highway running parallel to the northeastern coast of...

Word Count : 3257

Malaysian Expressway System

Last Update:

three new highways linking the east and west coasts. On 27 March 1974, the Kuala Lumpur–Seremban Expressway was constructed. Funded by a loan by the...

Word Count : 4585

Expressways of Singapore

Last Update:

latest expressway completed is the 5 km Marina Coastal Expressway (MCE), which links the East Coast Parkway and Kallang-Paya Lebar Expressway to Marina...

Word Count : 1066

List of expressways and highways in Malaysia

Last Update:

This is a list of expressways and highways in Malaysia. List of the expressways which are under the administration of the federal Malaysian Highway Authority...

Word Count : 114

Shah Alam Expressway

Last Update:

Expressway is the third east–west-oriented expressway in the Klang Valley after the Federal Highway and New Klang Valley Expressway. This expressway is...

Word Count : 479

Ayer Rajah Expressway

Last Update:

the MCE and the East Coast Parkway (ECP), it forms a second east-west link to complement the role played by the Pan Island Expressway (PIE). As from 29 December...

Word Count : 506

Malaysian National Projects

Last Update:

South Kedah Expressway (LEKAS) Sungai Besi–Ulu Klang Elevated Expressway (SUKE) completed Sarawak Sabah Link Road (SSLR) West Coast Expressway George town...

Word Count : 516

Sultan Yusuf Bridge

Last Update:

bridge in Hilir Perak District, Perak, Malaysia. It is located on West Coast Expressway and Federal Route 5 crossing Perak River between Batak Rabit and...

Word Count : 351

Seohaean Expressway

Last Update:

The Seohaean Expressway (Korean: 서해안 고속도로; Seohaean Gosok Doro), meaning "West Coast Expressway", is a freeway in South Korea, connecting Mokpo to Gunsan...

Word Count : 469

Pan Island Expressway

Last Update:

other segments of the expressway were carried out in the 1970s. The initial expressway, from Jalan Boon Lay to the East Coast Parkway, was completed...

Word Count : 1889

East Coast Parkway

Last Update:

The East Coast Parkway (Abbreviation: ECP) is an expressway that runs along the southeastern coast of Singapore. It is approximately 20 kilometres (12 mi)...

Word Count : 1487

Malaysia Federal Route 5

Last Update:

the long-anticipated West Coast Expressway E32 began its construction after numerous delays. The 233-km controlled-access expressway from Changkat Jering...

Word Count : 2126

Highway system in Taiwan

Last Update:

limited to 1–27. In 1992, planning started for 12 east–west expressways and the West Coast Expressway, indicated by route numbers greater than 60, to ease...

Word Count : 2993

Chronology of the Malaysian Expressway System

Last Update:

Malaysian Expressway System. The Malaysian Expressway System is a network of controlled-access highways in Malaysia. Malaysian Expressway System List...

Word Count : 35

South Klang Valley Expressway

Last Update:

Klang Valley Expressway is the fifth east–west-oriented expressway in the Klang Valley after the Federal Highway, the New Klang Valley Expressway (NKVE), the...

Word Count : 590

Changkat Jering

Last Update:

Taiping to the North–South Expressway via the southern exit, as well as being the northern terminus of the West Coast Expressway. Changkat Jering is famed...

Word Count : 126

Road signs in Malaysia

Last Update:

Expressway route number and then exit number (Example: West Coast Expressway West Coast Expressway Exit 23 Teluk Intan (Exit 3223)) Federal Roads only use...

Word Count : 3084

List of toll roads

Last Update:

Kitakyūshū Expressways Hanshin Expressway Hiroshima Expressway (urban) Nagoya Expressway Shuto Expressway Tokyo Expressway East Coast Expressway Kajang–Seremban...

Word Count : 2660

List of Infinite Challenge episodes

Last Update:

Fabrication Team #2 306 253 June 11, 2011 2011 Infinite Challenge West Coast Expressway Song Festival #1 Jung Jae-hyung, Lee Juck, Psy, Sweet Sorrow, 10cm...

Word Count : 859

Florida State Road 528

Last Update:

Florida Expressway Authority (CFX), and the Florida Department of Transportation (FDOT). Spanning approximately 53 miles (85 km) along a west–east axis...

Word Count : 4461

Pangkor Island

Last Update:

accessible through the Ipoh–Lumut 4-lane dual carriage highway and the West Coast Expressway. Buses frequently arrive at the main jetty in Lumut. No bridges...

Word Count : 953

New North Klang Straits Bypass

Last Update:

Utara Baru or Lebuhraya Shapadu) is an expressway in Klang, Selangor, Malaysia. The 17.5 km (10.9 mi) expressway also acts as the North Klang Straits Bypass...

Word Count : 241

PDF Search Engine © AllGlobal.net