Global Information Lookup Global Information

Vaughan Metropolitan Centre station information


Vaughan Metropolitan Centre
General information
Location3150 Highway 7 West
Vaughan, Ontario
Canada
Coordinates43°47′39″N 79°31′39″W / 43.79417°N 79.52750°W / 43.79417; -79.52750
PlatformsCentre platform
Tracks2
Connections YRT  77  Highway 7 (on-street)
Bus interchange SmartVMC Terminal
Bus rapid transit Highway 7 Rapidway
Construction
Structure typeUnderground
Parking900 spaces
AccessibleYes
ArchitectGrimshaw Architects
Architectural styleContemporary architecture
Other information
WebsiteOfficial station page
History
OpenedDecember 17, 2017; 6 years ago (2017-12-17)[1]
Passengers
2022[2]21,186
Rank51 of 75
Services
Preceding station Toronto Transit Commission Following station
Terminus Line 1 Yonge–University Highway 407
towards Finch
Location
Map

Vaughan Metropolitan Centre (also known as Vaughan, Vaughan Metro Centre or VMC) is a rapid transit station in Vaughan, Ontario, Canada. Opened on December 17, 2017,[3] it is the north terminus of the western section of the Toronto subway's Line 1 Yonge–University. It is operated by the Toronto Transit Commission (TTC) and is one of two subway stations in the system outside of Toronto's city limits. It provides connections to a York Region Transit (YRT) Viva bus rapid transit route along the Highway 7 Rapidway, which is also used by a Brampton Transit Züm route, as well as several local YRT bus routes.

Located in Vaughan Metropolitan Centre, the suburban city's planned downtown, the station is designated by Metrolinx as a mobility hub, one of several multimodal transit terminals in the Greater Toronto and Hamilton Area.[4] The station has a 900-space park-and-ride lot, which is privately owned and operated by SmartCentres, unlike other TTC rapid transit station parking lots which are owned and operated by the TTC itself.[5][6]

  1. ^ Beattie, Samantha; Spurr, Ben (December 16, 2017). "After delays, cost overruns, and tragedy, a subway to Vaughan is complete". Toronto Star. Archived from the original on December 17, 2017. Retrieved July 29, 2019.
  2. ^ "Subway ridership, 2022" (PDF). Toronto Transit Commission. Retrieved May 4, 2024. This table shows the typical number of customer-trips made on each subway on an average weekday and the typical number of customers travelling to and from each station platform on an average weekday.{{cite web}}: CS1 maint: url-status (link)
  3. ^ "Justin Trudeau joins premier, mayor at TTC line 1 extension opening". CBC News. December 15, 2017. Retrieved September 16, 2023.
  4. ^ "Vaughan Corporate Centre" (PDF). Mextrolinx.com. September 19, 2012. Archived (PDF) from the original on February 6, 2017. Retrieved October 27, 2017. this hub is planned to integrate subway, rapid transit and local bus service
  5. ^ "subwayparking.com". SmartCentres REIT. December 17, 2017. Archived from the original on January 18, 2018. Retrieved January 17, 2018.
  6. ^ "Paid parking will be available for subway riders at Vaughan station". yorkregion.com. November 29, 2017. Archived from the original on January 18, 2018. Retrieved January 17, 2018.

and 22 Related for: Vaughan Metropolitan Centre station information

Request time (Page generated in 1.1693 seconds.)

Vaughan Metropolitan Centre station

Last Update:

Vaughan Metropolitan Centre (also known as Vaughan, Vaughan Metro Centre or VMC) is a rapid transit station in Vaughan, Ontario, Canada. Opened on December...

Word Count : 2577

Vaughan Metropolitan Centre

Last Update:

Vaughan Metropolitan Centre is the city centre of Vaughan, Ontario, Canada. Measuring 179 hectares (442 acres), the district is located at the intersection...

Word Count : 935

Highway 407 station

Last Update:

outside the city of Toronto, the other being Vaughan Metropolitan Centre station. The design team for the station was AECOM as the prime consultant, Aedas...

Word Count : 1598

Toronto Rocket

Last Update:

the opening of the Spadina Subway extension to Vaughan Metropolitan Centre station (signed as "Vaughan" on the TR train's exterior destination signs for...

Word Count : 3029

Toronto subway trackage

Last Update:

following stations. Unless otherwise described, they are diamond crossings. Yonge–University line South of Vaughan Metropolitan Centre (terminal station) South...

Word Count : 2098

Pioneer Village station

Last Update:

Avenue. Pioneer Village, Highway 407 and Vaughan Metropolitan Centre stations are the first Toronto subway stations fully or partially located outside the...

Word Count : 1859

Vaughan Mills

Last Update:

Region Transit bus routes at the Vaughan Mills Terminal, with frequent service to Vaughan Metropolitan Centre subway station, the northern terminus of Line...

Word Count : 1335

York Region Transit

Last Update:

Langstaff GO train station SmartVMC Bus Terminal – adjacent to Vaughan Metropolitan Centre subway station Vaughan Metropolitan Centre Vivastation – covered...

Word Count : 3389

Greater Toronto Area

Last Update:

in Vaughan, the latter of which began to be served by the system in December 2017 with an extension of Line 1 to Vaughan Metropolitan Centre station on...

Word Count : 9888

Wilson Yard

Last Update:

do so by deadheading southbound from Vaughan Metropolitan Centre station, instead of northbound from Wilson station. This avoids northbound trains going...

Word Count : 1099

Toronto subway

Last Update:

having two northern terminals – at Vaughan Metropolitan Centre and Finch – and its southern end at Union station in downtown Toronto. Line 2 Bloor–Danforth...

Word Count : 12851

York University station

Last Update:

It opened in 2017, as part of the extension of the subway to Vaughan Metropolitan Centre. The official groundbreaking ceremony for the Toronto–York Spadina...

Word Count : 2197

Viva Silver

Last Update:

to Vaughan Metropolitan Centre station on the Line 1 Yonge–University subway in Toronto. The planned route is from the Vaughan Metropolitan Centre Terminal...

Word Count : 437

Toronto Transit Commission

Last Update:

Dupont stations on Line 1, and between Castle Frank and Keele stations on Line 2. The stations and tunnels between Vaughan Metropolitan Centre station and...

Word Count : 9366

Vaughan

Last Update:

and major commercial development. It is served by the Vaughan Metropolitan Centre subway station, which is the northwestern terminus of Line 1 Yonge–University...

Word Count : 5837

Paul Raff

Last Update:

designed many private residences and public artworks such as at Vaughan Metropolitan Centre station in Toronto. Raff was awarded the Allied Arts Medal by the...

Word Count : 324

Jane LRT

Last Update:

north into York Region and terminating at Vaughan Metropolitan Centre station. Bloor Street West at Jane station (connection to Line 2 Bloor–Danforth) Ardagh...

Word Count : 755

VMC

Last Update:

visual flight rules flight is permitted Vaughan Metropolitan Centre station, a Toronto Transit Commission subway station, Canada Vevey–Montreux–Chillon–Villeneuve...

Word Count : 286

Regional Municipality of York

Last Update:

Shopping Mall (Markham) Markville Shopping Centre (Markham) Pacific Mall (Markham) The Promenade Shopping Centre (Vaughan) Times Square (Richmond Hill) Langham...

Word Count : 4312

Grimshaw Architects

Last Update:

Transportation + Infrastructure Design Excellence Awards—Vaughan Metropolitan Centre station SCUP Outstanding Achievement in Integrated Planning and Design—Duke...

Word Count : 1736

Public transportation in Toronto

Last Update:

outside of Toronto city limits at Steeles Avenue to Vaughan at Vaughan Metropolitan Centre station. Line 5 Eglinton is a 19-kilometre (12 mi) light rail...

Word Count : 1904

Yonge Street

Last Update:

kilometers from Finch Station into York Region. This expansion project will cover areas within the cities of Markham, Vaughan, and Richmond Hill. Upon...

Word Count : 6888

PDF Search Engine © AllGlobal.net