An Urgent Operational Requirement (UOR) is a system used by the British Ministry of Defence (MOD) to obtain urgent equipment for operations.
Supplementing the MOD's long term planned equipment programme are Urgent Operational Requirements (UOR), funded by extra Treasury money.[1]
Urgent Operational Requirements (UORs) arise from the identification of previously unprovisioned and emerging capability gaps as a result of current or imminent operations or where deliveries under existing contracts for equipment or services require accelerating due to an increased urgency to bring the capability they provided into service. These capability shortfalls are addressed by the urgent procurement of either new or additional equipment, enhancing existing capability, within a time scale that cannot be met by the normal acquisition cycle.[2]
Examples of this include;
L129A1 Sharpshooter rifle - procured when British Army operations in Afghanistan found that ground units required a weapon platform with accurate lethality out past the range of the standard issue rifle the NATO 5.56mm chambered L85A2.[3]
MTP Camouflage Uniform - during the same operations as above, British combat units found their current issues of either woodland or desert DPM where unsuitable for the varied terrain they found themselves in. After successful trials of Crye Precisions MultiCam the decision was made to procure a multicam style camouflage which later became standard issue.[4]
Mk 7 Helmet - introduced in June 2009 the MK 7 was procured to allow the soldier more practical head protection when it was found the previous issue Mk 6 interfered with new body armour and could tip over the soldiers eyes obscuring vision when lying prone. Now succeeded by the Mk 8.[5]
^"Standing commitments". Ministry of Defence. Retrieved 3 March 2014.
^"Defence factsheet". Ministry of Defence. Archived from the original on 26 November 2009. Retrieved 27 February 2010.
^"L129A1 Sharpshooter Rifle". Armament Research Services. Retrieved 7 October 2021.
^"British Army to get first new uniform in 40 years". CNN. Retrieved 7 October 2021.
^"UK Troops get new helmet and body armour". BBC. Retrieved 7 October 2021.
and 25 Related for: Urgent Operational Requirement information
An UrgentOperationalRequirement (UOR) is a system used by the British Ministry of Defence (MOD) to obtain urgent equipment for operations. Supplementing...
conflicts, with any shortcomings in equipment addressed as UrgentOperationalRequirements (UOR), which supplements planned equipment programmes. Each...
Hirtenberger AG M6-895 60 mm Mortar was procured in 2007 as an UrgentOperationalRequirement (UOR) to replace the current 51 mm Mortar on current operations...
All Terrain Tracked Carriers for use in Afghanistan under an UrgentOperationalRequirement (UOR). The vehicles, known as Warthog in British service, supplemented...
LM308MWS was submitted for the British Ministry of Defence's UrgentOperationalRequirement (UOR) for immediate deployment of a semi-automatic 7.62 NATO...
872 m The Hirtenberger M6-895 60 mm mortar was procured as an urgentoperationalrequirement (UOR) for the British Army. It can be fired in both the direct-lay...
Introduced in December 2006, the Bulldog was designed to meet an urgentoperationalrequirement for extra armoured vehicles for use in counter-insurgency campaigns...
United States Light utility vehicle 1,000 Introduced as an urgentoperationalrequirement to replace the Peugeot P4. Land Rover Defender United Kingdom...
targeting pod replaced the less accurate TIALD in 2007, under an UrgentOperationalRequirement (UOR) for Afghanistan. Capability E would have included a Link...
LM308MWS, was chosen by the MoD in 2010 to meet a £1.5 million urgentoperationalrequirement in the Afghanistan conflict for a semi-automatic 7.62mm rifle...
into the UK MOD's WARTHOG vehicle, a vehicle developed as an UrgentOperationalRequirement (UOR) for Operation Herrick in Afghanistan. The company went...
Aerospace. The Mk 7 helmet was introduced in June 2009 as an UrgentOperationalRequirement. It was first shown through the Defence Vehicle Dynamics (DVD)...
and a new vortex style flash eliminator was introduced as an UrgentOperationalRequirement; initially introduced for use by selected units in 2007, the...
forty-year old MILAN. This was particularly in response to a French urgentoperationalrequirement which had also led to the purchase of the US-made Javelin in...
June 2016: APKWS deployed on USAF F-16 and A-10 as part of an urgentoperationalrequirement. October 2016: Production rate increased to 5,000 a year. June...
All Terrain Tracked Carrier vehicles would be purchased as an UrgentOperationalRequirement to replace the Viking vehicles in use in Afghanistan. The new...
the requirements of the Romanian Army but as of late 2007 no production orders had been placed for the Saur. To meet an UrgentOperationalRequirement (UOR)...
Tornados. The Sniper pod replaced TIALD on Harriers following an urgentoperationalrequirement in 2007. Ripley, Tim (October 2000). "Laser Bombers". AirForces...
Rover Snatch The Land Rover Snatch-Vixen vehicle on show at the UrgentOperationalRequirement (UOR) Equipment Demonstration in Salisbury, Wiltshire. Type...
unofficial designation Tornado EF3, were converted under a UrgentOperationalRequirement (UOR) as part of the build up to Operation Telic, the 2003 invasion...
62×51mm NATO round, providing accurate fire of up to 1000m as an urgentoperationalrequirement (UOR) in Afghanistan. The Indian Army uses a locally manufactured...
Western Uganda Union of Orthodox Rabbis Universal Orlando Resort UrgentOperationalRequirement Uchilishche Olimpiyskogo Rezerva (UOR, училище олимпийского...
M72 rocket was reintroduced into British service under the UrgentOperationalRequirement program, with the M72A9 variant being designated the light anti-structure...