Circumferential rail transit route in Massachusetts
This article needs to be updated. Please help update this article to reflect recent events or newly available information.(May 2019)
MBTA Urban Ring
Parent
Massachusetts Bay Transportation Authority
Founded
Suspended, but partial implementation of some segments is proceeding
Headquarters
10 Park Plaza, Boston, MA 02116
Locale
Boston, Massachusetts
Service area
Boston, Chelsea, Everett, Medford, Somerville, Cambridge, and Brookline
Service type
Bus rapid transit
Routes
1 circumferential, with 2 major spurs
Stations
31 proposed
Daily ridership
282,000–293,000 passengers per day in 2025 (estimated)
Fuel type
Diesel
Operator
MBTA
Website
www.massdot.state.ma.us/theurbanring/
The Urban Ring was a proposed project of the Massachusetts Bay Transportation Authority and the Massachusetts Department of Transportation, to develop new public transportation routes that would provide improved circumferential connections among many existing transit lines that project radially from downtown Boston.[1] The Urban Ring Corridor is located roughly one to two miles from downtown Boston, passing through the Massachusetts cities of Boston, Chelsea, Everett, Medford, Somerville, Cambridge, and Brookline.[1] The project was expected to convert 41,500 car trips to transit trips daily.[2]
The Major Investment Study split the project into three phases, the first of which (enhanced bus service) was partially implemented. The planning of Phase 2 was suspended in January 2010 because MBTA and the Commonwealth of Massachusetts have insufficient funding to build a substantial portion of that phase (projected to cost $2.4 billion).[2][3] As of 2019[update], some interim bus service improvements have been implemented or are underway, in the absence of major funding.
^ abeot Urban Ring Notice
^ ab"Urban Ring Phase 2: Fact Sheet", Executive Office of transportation, Commonwealth of Massachusetts, January 2009 (archived 2011)
^Mullan, Jeffery B. (January 22, 2010). "Re: Urban Ring Phase 2, EOEEA #12565" (PDF). Massachusetts Executive Office of Energy and Environmental Affairs. Archived from the original (PDF) on March 23, 2020. Retrieved October 31, 2019.
and 15 Related for: Urban Ring Project information
The UrbanRing was a proposed project of the Massachusetts Bay Transportation Authority and the Massachusetts Department of Transportation, to develop...
CT4 through CT11 were proposed as part of an interim phase of the UrbanRingProject to provide circumferential service bypassing the crowded downtown...
Plaza. The "locally preferred alternative" [citation needed] for the UrbanRingproject as of June 2008 calls for routing bus rapid transit along the Grand...
Newburyport/Rockport Line in 1985. Prior to its 2010 cancellation, the UrbanRingProject planned for a circumferential BRT line with a stop at Mystic Mall...
for Dombivli MIDC roads. Kalyan Ring Road Project to Connect Kalyan Rural, Titwala, Dombivli Travelling to the urban area from Kalyan rural is hectic...
formally proposed as a MBTA project and is not in active development. UrbanRingProject North-South Rail Link "'Indigo Line' advocates keep pushing for a...
tunnel. Harvard Square was planned to be the terminus of a spur of the UrbanRingProject, a circumferential bus rapid transit line. Under draft plans released...
distribution of social groups within urban areas. This concentric ring model depicts urban land usage in concentric rings: the Central Business District (or...
the Peripheral Ring Road (PRR) project, the Bangalore Development Authority (BDA) barely managed to acquire 3.21 acres of land. Urban Development Minister...
street access from Broadway and from Highland Street. Plans for the UrbanRingProject called for a busway along the former Grand Junction Branch, but without...
limited-stop crosstown routes were created in 1994 as a prelude to the UrbanRingProject, a never-implemented circumferential bus rapid transit (BRT) corridor...
UrbanRingProject called for a busway along the former Grand Junction Branch, but with a station further north at Griffin Way. After the UrbanRing was...
Urban structure is the arrangement of land use in urban areas, in other words, how the land use of a city is set out. Urban planners, economists, and...
Seoul Ring is the English nickname for the Millennium Gate project, which was planned to be built along the Han River (Korea) in Peace Park, Mapo District...
matters including Metro Rail Projects at the central level. All the interventions in urban transport by the Ministry of Urban Development are carried out...