Tulu Moye Geothermal Power Station information


Tulu Moye Geothermal Power Station
Map
CountryEthiopia
LocationTulu Moye, Oromia Region
Coordinates08°09′41″N 39°07′46″E / 8.16139°N 39.12944°E / 8.16139; 39.12944
StatusUnder construction
Construction began2021
Commission date2023 (Expected)
Owner(s)Tulu Moye Geothermal Operations Plc. (TMGO)
Thermal power station
Primary fuelGeothermal
Power generation
Nameplate capacity50 MW (67,000 hp), Expandable to 150 MW (200,000 hp)

The Tulu Moye Geothermal Power Station, is a 50 MW (67,000 hp) geothermal power station, under construction in Ethiopia. When fully developed, the power station will be the first grid-ready independently developed geothermal power station in the country. The developers of this power plant, plan to expand it to 150 megawatts in the second phase, planned for the following five years.[1][2]

  1. ^ ESI-Africa (8 April 2021). "First drilling of the 150MW Tulu Moye Geothermal project completed". ESI-Africa. Rondebosch, South Africa. Retrieved 3 July 2021.
  2. ^ Alexander Richter (15 October 2020). "U.S. funding of $1.6 million announced for Tulu Moye geothermal project, Ethiopia". ThinkGeoEnergy. Reykjavik, Iceland. Retrieved 3 July 2021.

and 5 Related for: Tulu Moye Geothermal Power Station information

Request time (Page generated in 0.9248 seconds.)

Tulu Moye Geothermal Power Station

Last Update:

Tulu Moye Geothermal Power Station, is a 50 MW (67,000 hp) geothermal power station, under construction in Ethiopia. When fully developed, the power station...

Word Count : 487

Corbetti Geothermal Power Station

Last Update:

portal List of power stations in Ethiopia Tulu Moye Geothermal Power Station Energy in Ethiopia NS Energy (2018). "Corbetti Geothermal Power Project". NSEnergyBusiness...

Word Count : 713

List of power stations in Ethiopia

Last Update:

working at the Tulu Moye geothermal sites with ~520 MW in four phases, Tulu Moye I with 50 MW until 2021 and after a GO decision, Tulu Moye II-IV with 470...

Word Count : 4973

Renewable energy in Ethiopia

Last Update:

sector, the country is also developing geothermal projects in Oromia, specifically in Corbetti and Tulu Moye. These projects, revised in 2017 to a capacity...

Word Count : 1729

Mannvit Engineering

Last Update:

September 2022. "Tulu Moye Geothermal | Reykjavik Geothermal". 20 October 2021. Retrieved 27 September 2022. "Tulu Moye, Ethiopia, geothermal power project"....

Word Count : 976

PDF Search Engine © AllGlobal.net