Takt time, or simply takt, is a manufacturing term to describe the required product assembly duration that is needed to match the demand. Often confused with cycle time, takt time is a tool used to design work and it measures the average time interval between the start of production of one unit and the start of production of the next unit when items are produced sequentially. For calculations, it is the time to produce parts divided by the number of parts demanded in that time interval.[1] The takt time is based on customer demand; if a process or a production line are unable to produce at takt time, either demand leveling, additional resources, or process re-engineering is needed to ensure on-time delivery.
For example, if the customer demand is 10 units per week, then, given a 40-hour workweek and steady flow through the production line, the average duration between production starts should be 4 hours, ideally. This interval is further reduced to account for things like machine downtime and scheduled employee breaks.
^Liker, Jeffrey K. (2004). The Toyota way: 14 management principles from the world's greatest manufacturer. New York: McGraw-Hill. ISBN 0-07-139231-9. OCLC 54005437.
Takttime, or simply takt, is a manufacturing term to describe the required product assembly duration that is needed to match the demand. Often confused...
2015-02-09. "TaktTime vs Cycle Time vs Lead Time". toggl. Retrieved October 19, 2018. Tim Heston (July 24, 2012). "Turnaround time versus on-time delivery...
Takt Op (Japanese: タクトオーパス, Hepburn: Takuto Ōpasu, stylized as takt op. or {tákt: op.}) is a mixed-media project about classical music produced by Bandai...
of takttime, which ensures that products are produced just in time to meet customer demand. Sepheri provides a list of methodologies of just-in-time manufacturing...
subcontractor use and so on. Pull to visualize takttime through the flow: pulling work from upstream at takttime through visual devices such as kanban cards...
conditions are met, expected throughput can be equaled to the inverse of takttime. Besides volume, heijunka also means attaining mixed-model production...
Kanban will require setup and run-time to be managed from a common pool of resource time. Takt-time is the ratio of time to volume at capacity and in DFT...
Two Hearts in Waltz Time (Original title: Zwei Herzen im 3/4 Takt or Zwei Herzen im Dreivierteltakt, literally Two Hearts in 3/4 Time) is a 1930 German...
Theory of Constraints Time and motion study Value Stream Mapping Modern Concepts and related Terminology: Production levelling Takttime Direct labor cost...
rate dictated by an average of customer demand (this rate is called the takttime). This is referred to as the Pacemaker Process. Despite the advantages...
Bryning-with-Warton (6500 employees). BAE builds a Eurofighter every two weeks (takttime). Rolls-Royce make turbofan blades in Barnoldswick (950 employees). Nearby...
be reconfigured easily to allow the adaptation of the process to fit takttime. This flexibility allows the work content to be adapted as demand or product...
1001 Danish Delights (Danish: Takt og tone i himmelsengen) is a 1972 Danish comedy film directed by Sven Methling and starring Dirch Passer and Axel Strøbye...
(called Taktplatz in German, or Takt for short), each carrying out one part of the assembly process. Two bays, Takt 9 and Takt 10, were underneath box-like...
geographical time zone?". Iceland Magazine. Retrieved 5 May 2021. Þorleifsdóttir, Björg (15 March 2019) "Gengur líkamsklukkan alltaf í takt við venjulega...
"DFB-Pokal 2012/13, Finale in Berlin: Bayern München 3:2 VfB Stuttgart: Takt. aufstellung" [DFB-Pokal 2012/13, Final in Berlin: Bayern Munich 3:2 VfB...
Hazra, Adriana (April 24, 2022). "Crunchyroll Reveals English Dub Cast for takt op. Destiny Anime". Anime News Network. Archived from the original on April...
domination". Metal Hammer. No. 207. "Christoph Schneider: Fakten über die Takt-Maschine von Rammstein". ROCK ANTENNE (in German). 11 May 2022. Retrieved...
"DFB-Pokal 2016/17, Finale in Berlin: Eintracht Frankfurt 1:2 Borussia Dortmund: Takt. aufstellung" [DFB-Pokal 2016/17, Final in Berlin: Eintracht Frankfurt 1:2...