Global Information Lookup Global Information

Stadler Citylink information


A Sheffield Supertram Citylink on test at Donetsk Way, Sheffield, April 2017

The Stadler Citylink (known as the Vossloh Citylink until 2015) is a series of tram-trains manufactured by Stadler Rail at its Valencia factory since 2011. The design was introduced by Vossloh España before their takeover by Stadler Rail in 2015. They are currently used in Germany, Hungary, Mexico, Spain and the United Kingdom, with more on order in Austria.

The Class 399 variant was placed into service on the Sheffield Supertram network from September 2017 as the United Kingdom's first tram-train; following the success of this trial, the Class 398 variant has been ordered and is due to enter service on the South Wales Metro from 2022. The largest order to date for Citylinks was placed as part of the VDV Tram-Train Project in January 2022, with a consortium of six Austrian and German operators ordering 246 vehicles with an option to order a further 258 afterwards. The deal is worth €4 billion (£3.3 billion), and is the largest contract in Stadler's history.[1]

  1. ^ "Stadler to deliver up to 504 tram-trains to German-Austrian project consortium" (PDF). Stadler Rail. 17 January 2022.

and 21 Related for: Stadler Citylink information

Request time (Page generated in 0.8091 seconds.)

Stadler Citylink

Last Update:

The Stadler Citylink (known as the Vossloh Citylink until 2015) is a series of tram-trains manufactured by Stadler Rail at its Valencia factory since 2011...

Word Count : 1940

South Yorkshire Supertram

Last Update:

tram-train operations, using a purpose-built fleet of new Class 399 Stadler Citylink electric multiple units, was repeatedly delayed, but on 25 October...

Word Count : 6548

Citylink

Last Update:

also goes by CityLink Stadler Citylink, a series of tram-trains Scottish Citylink, intercity coach operator in Scotland Irish Citylink, intercity coach...

Word Count : 259

Transport for Wales Rail

Last Update:

diesel-electrics), along with 36 Class 398 Stadler Citylink tram-trains. These units will be manufactured at Stadler's factory in Szolnok, Hungary, and assembled...

Word Count : 2817

Stadler Rail

Last Update:

purchasing Vossloh España in 2016, Stadler Rail have additionally manufactured the following former Vossloh designs: The Citylink, a tram-train in service in...

Word Count : 2753

British Rail Class 398

Last Update:

Class 398 Citylink is a fleet of 36 tram-train multiple units being built for Transport for Wales Rail by Swiss rolling stock manufacturer Stadler Rail. The...

Word Count : 561

University of Sheffield

Last Update:

South Yorkshire Passenger Transport Executive (1994–1997) Vehicles Siemens-Duewag Supertram (101–125) Stadler Citylink (201–207) Depots Nunnery Square...

Word Count : 15578

Birley

Last Update:

South Yorkshire Passenger Transport Executive (1994–1997) Vehicles Siemens-Duewag Supertram (101–125) Stadler Citylink (201–207) Depots Nunnery Square...

Word Count : 628

Sheffield station

Last Update:

South Yorkshire Passenger Transport Executive (1994–1997) Vehicles Siemens-Duewag Supertram (101–125) Stadler Citylink (201–207) Depots Nunnery Square...

Word Count : 4006

Sheffield City Hall

Last Update:

South Yorkshire Passenger Transport Executive (1994–1997) Vehicles Siemens-Duewag Supertram (101–125) Stadler Citylink (201–207) Depots Nunnery Square...

Word Count : 753

Trams in Szeged

Last Update:

KT4D, 2005- 13 ČKD Tatra T6A2, 1997- 4 ČKD SZKT B6A2D-M, 1997- 12 Stadler CityLink, (in the MÁV's fleet) 2021- 1 FVV1100-type vintage tram No. 609, ex-Budapest...

Word Count : 377

Sheffield Cathedral

Last Update:

South Yorkshire Passenger Transport Executive (1994–1997) Vehicles Siemens-Duewag Supertram (101–125) Stadler Citylink (201–207) Depots Nunnery Square...

Word Count : 3174

List of United Kingdom tramcar stock

Last Update:

Sheffield Supertram Siemens-Duewag Supertram Stadler Citylink tram-trains Tramlink Bombardier CR4000 Stadler Variobahn Blackpool Tramway Standard English...

Word Count : 203

Crystal Peaks

Last Update:

South Yorkshire Passenger Transport Executive (1994–1997) Vehicles Siemens-Duewag Supertram (101–125) Stadler Citylink (201–207) Depots Nunnery Square...

Word Count : 506

British Rail Class 399

Last Update:

The British Rail Class 399 Citylink is a type of rail vehicle built by Vossloh on its Citylink platform for operation by Sheffield Supertram. Primarily...

Word Count : 2754

The Sheffield College

Last Update:

South Yorkshire Passenger Transport Executive (1994–1997) Vehicles Siemens-Duewag Supertram (101–125) Stadler Citylink (201–207) Depots Nunnery Square...

Word Count : 1979

South Yorkshire Passenger Transport Executive

Last Update:

South Yorkshire Passenger Transport Executive (1994–1997) Vehicles Siemens-Duewag Supertram (101–125) Stadler Citylink (201–207) Depots Nunnery Square...

Word Count : 1179

Hillsborough Interchange

Last Update:

South Yorkshire Passenger Transport Executive (1994–1997) Vehicles Siemens-Duewag Supertram (101–125) Stadler Citylink (201–207) Depots Nunnery Square...

Word Count : 339

Meadowhall Interchange

Last Update:

South Yorkshire Passenger Transport Executive (1994–1997) Vehicles Siemens-Duewag Supertram (101–125) Stadler Citylink (201–207) Depots Nunnery Square...

Word Count : 1510

Public Transport in South Yorkshire

Last Update:

South Yorkshire Passenger Transport Executive (1994–1997) Vehicles Siemens-Duewag Supertram (101–125) Stadler Citylink (201–207) Depots Nunnery Square...

Word Count : 927

Attercliffe

Last Update:

South Yorkshire Passenger Transport Executive (1994–1997) Vehicles Siemens-Duewag Supertram (101–125) Stadler Citylink (201–207) Depots Nunnery Square...

Word Count : 800

PDF Search Engine © AllGlobal.net