Global Information Lookup Global Information

Second Avenue Subway information


Second Avenue Subway
"Q" train
The Second Avenue Line is served by the Q.
Limited service is also provided by the N and R.
The T (turquoise) will serve the full line in the future if Phase 3 is completed.
Overview
StatusOpen from 72nd Street to 96th Street
Phase 2 to Harlem–125th Street in design
OwnerCity of New York
LocaleManhattan, New York City, United States
Termini
  • Harlem–125th Street
  • Hanover Square
Stations3 (13 more planned)
Service
TypeRapid transit
SystemNew York City Subway
Operator(s)New York City Transit Authority
Daily ridership45,367[1]
History
OpenedJanuary 1, 2017 (2017-01-01) (first phase)
Technical
Line length8.5 miles (13.7 km)
Track length17 miles (27 km)
Number of tracks2
CharacterFully underground
Track gauge4 ft 8+12 in (1,435 mm)
Electrification600 V DC third rail
Route map

Legend
Second Avenue Subway
Yard tracks & provision for Bronx expansion
Second Avenue Subway
Second Avenue Subway
Lexington Avenue Line
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Harlem–125th Street
(planned)
Second Avenue Subway
Second Avenue Subway
Lexington Avenue Line
Second Avenue Subway
116th Street
(planned)
Second Avenue Subway
106th Street
(planned)
Second Avenue Subway
Line end for Phase 1
Second Avenue Subway
96th Street
Second Avenue Subway
86th Street
Second Avenue Subway
72nd Street
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
63rd Street Lines
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Broadway Line
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
55th Street
(proposed)
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Lexington Avenue–53rd Street (53rd Street Line)
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
42nd Street
(proposed)
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Grand Central–42nd Street (Flushing Line)
Second Avenue Subway
34th Street
(proposed)
Second Avenue Subway
23rd Street
(proposed)
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
14th Street
(proposed)
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Third Avenue (BMT Canarsie Line)
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Houston Street
(proposed)
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Second Avenue (Sixth Avenue Line)
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Chrystie Street Connection to Williamsburg Bridge
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Nassau Street Line
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Grand Street
(proposed)
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Chrystie Street Connection to Manhattan Bridge
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Broadway Line to Manhattan Bridge
Second Avenue Subway
Chatham Square
(proposed)
Second Avenue Subway
Seaport
(proposed)
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Eighth Avenue Line
Second Avenue Subway
Second Avenue Subway
Second Avenue Subway
Broadway–Seventh Avenue Line
Second Avenue Subway
Hanover Square
(proposed)
Second Avenue Subway
provision for Brooklyn expansion

The Second Avenue Subway (internally referred to as the IND Second Avenue Line by the MTA and abbreviated to SAS) is a New York City Subway line that runs under Second Avenue on the East Side of Manhattan. The first phase of this new line, with three new stations on Manhattan's Upper East Side, opened on January 1, 2017. The full Second Avenue Line (if it will be funded) will be built in three more phases to eventually connect Harlem–125th Street in East Harlem to Hanover Square in Lower Manhattan. The proposed full line would be 8.5 miles (13.7 km) and 16 stations long, serve a projected 560,000 daily riders, and cost more than $17 billion.

The line was originally proposed in 1920 as part of a massive expansion of what would become the Independent Subway System (IND). In anticipation of the Second Avenue Subway being built to replace them, parallel elevated lines along Second Avenue and Third Avenue were demolished in 1942 and 1955, respectively, despite several factors causing plans for the Second Avenue Subway to be cancelled. Construction on the line began in 1972 as part of the Program for Action. It was halted in 1975 because of the city's fiscal crisis, leaving only a few short segments of tunnels completed. Work on the line restarted in April 2007 following the development of a financially secure construction plan. The first phase of the line, consisting of the 96th Street, 86th Street and 72nd Street stations, as well as 1.8 mi (2.9 km) of tunnel, cost $4.45 billion. A 1.5-mile (2.4 km), $6 billion second phase from 96th to 125th Streets is almost ready to start construction as of 2024.

Phase 1 is served by the Q train at all times and limited rush-hour N and R trains. Phase 2 will extend the line's northern terminus from 96th Street to Harlem–125th Street. Both the Q and limited N services will be extended to 125th Street. Phase 3 will extend the line south from 72nd Street to Houston Street in Manhattan's Lower East Side. Upon completion, a new T train will serve the entire line from Harlem to Houston Street. Phase 4 will again extend the line south from Houston Street to Hanover Square, maintaining the T designation for the entire line. The T will be colored turquoise since it will use the Second Avenue Line through Midtown Manhattan.

  1. ^ "Annual Subway Ridership (2018–2023)". Metropolitan Transportation Authority. 2023. Retrieved April 20, 2024.

and 11 Related for: Second Avenue Subway information

Request time (Page generated in 0.884 seconds.)

Second Avenue Subway

Last Update:

The Second Avenue Subway (internally referred to as the IND Second Avenue Line by the MTA and abbreviated to SAS) is a New York City Subway line that...

Word Count : 15463

Construction of the Second Avenue Subway

Last Update:

The Second Avenue Subway, a New York City Subway line that runs under Second Avenue on the East Side of Manhattan, has been proposed since 1920. The first...

Word Count : 16341

Unbuilt plans for the Second Avenue Subway

Last Update:

The Second Avenue Subway, a New York City Subway line that runs under Second Avenue on the East Side of Manhattan, has been proposed since 1920; the first...

Word Count : 11640

Proposed expansion of the New York City Subway

Last Update:

better shape, the construction of the Second Avenue Subway was looked into again. Construction of the Second Avenue Subway started in 2007, and the first phase...

Word Count : 18167

Second Avenue station

Last Update:

The Second Avenue station is a station on the IND Sixth Avenue Line of the New York City Subway, located at the intersection of Second Avenue and Houston...

Word Count : 1700

IRT Lexington Avenue Line

Last Update:

construction of the parallel Second Avenue Subway, which opened in 2017, to relieve congestion on the Lexington Avenue line. Four stations along this...

Word Count : 5097

History of the New York City Subway

Last Update:

the 2000s, expansions include the 7 Subway Extension that opened in September 2015, and the Second Avenue Subway, the first phase of which opened on January...

Word Count : 29498

Program for Action

Last Update:

Third Avenue Line in the Bronx; build the Second Avenue Subway in Manhattan and the Bronx with a 48th Street spur; extend the IRT Nostrand Avenue Line...

Word Count : 15185

IRT Second Avenue Line

Last Update:

(February 6, 2017). "The Second Avenue Subway Is Here!". The New Yorker. Retrieved February 24, 2017. "Second Avenue Subway Project - History". mta.info...

Word Count : 1162

63rd Street lines

Last Update:

City Subway system. The two lines run under 63rd Street in the Upper East Side of Manhattan, with a cross-platform interchange at the Lexington Avenue–63rd...

Word Count : 9201

Independent Subway System

Last Update:

constructed as the Eighth Avenue Line in Manhattan in 1932. It was originally also known as the Independent City-Owned Subway System (ICOSS) or the Independent...

Word Count : 7297

PDF Search Engine © AllGlobal.net