Global Information Lookup Global Information

Rijeka Thermal Power Station information


TE Rijeka
Map
Official nameTermoelektrana Rijeka
CountryCroatia
LocationKostrena
Coordinates45°17′10″N 14°31′14″E / 45.28611°N 14.52056°E / 45.28611; 14.52056
StatusMothballed
Construction began1974
Commission date1978
Owner(s)Hrvatska elektroprivreda
Thermal power station
Primary fuelFuel oil
Power generation
Units operational1 × 320 MW
Make and modelAnsaldo Energia
Nameplate capacity320 MW
External links
CommonsRelated media on Commons

The Rijeka Thermal Power Station (Croatian: Termoelektrana Rijeka, TE Rijeka, also known as TE Urinj[1]) is an oil-fired power station east of Rijeka at Kostrena, Croatia. It was built between 1974 and 1978 and it has one generation unit with capacity of 320 MW.[2][3][4][5] The height of the boiler house including its rooftop flue gas stack is 250 metres (820 ft).[2]

Turbine for the power station was supplied by Ansaldo Energia. Ansaldo Energia was also awarded engineering, procurement and construction contract. Boilers were supplied by Waagner-Biro.[2][4]

The power station is owned and operated by Hrvatska elektroprivreda.[2][4] Its annual production varies, averaging 917 GWh, but only 141 GWh in 2011.[6] It is expected to undergo decommissioning in 2020, but it is doubtful that it will remain operational until then because of its pollution problem.[1] As of 2015, Rijeka Thermal Power Station is offline, ready to resume generation within 160 hours of notice.[7] On 18 October 2022, it was unofficially reported that HEP plans to restart the operation of the power plant in order to cover the losses incurred during the energy crisis.[8]

On December 15, 2023, HEP issued a notice on the start-up of the Rijeka Thermal Power Plant and related operations, which are planned for December 18, 2023, in accordance with the Intervention Plan on measures to protect the security of the gas supply of the Republic of Croatia (NN 127/22) with the aim of ensuring electricity stability of the Republic of Croatia. During operation, additional tests of process systems will be carried out with burner adjustment for optimal operation at higher loads, which could not be tested during short-term operation during February 2023. The duration of the operation will be determined by the completion of the test and measurement program and the target consumption of stored fuel. In order to determine compliance with the measures given in the environmental permit, measurements of pollutant emissions into the air will be carried out.[9]

  1. ^ a b Reščec, Fedor (February 2011). "Oil products demand to decline in Croatia". Nafta Scientific Journal. 62 (1–2). Croatian Academy of Sciences and Arts - Scientific Council for Petroleum: 54. ISSN 0027-755X.
  2. ^ a b c d Izvješće o sigurnosti za Pogon TE Rijeka [Safety Report for the TE Rijeka] (PDF) (Report) (in Croatian). Ministry of Environmental and Nature Protection. 1998-04-27. Archived from the original (PDF) on 2013-12-31. Retrieved 2014-01-12.
  3. ^ "Kraj zagađenju i uvozu: Termoelektrana Rijeka u roku četiri godine prelazi na plin" [End to pollution and import: within four years TE Rijeka transfers to gas]. Novi list (in Croatian). 2013-01-24. Retrieved 2014-01-12.
  4. ^ a b c "Gas- and Oil-Fired Plants in Croatia". industcards.com. Archived from the original on 2009-07-18. Retrieved 2013-08-25.
  5. ^ "Hidraulička analiza rashladnog sustava TE Rijeka" [Hydraulic analysis of the cooling system of TE Rijeka]. Department of Fluid Mechanics and Computational Engineering (in Croatian). Retrieved 2014-01-12.
  6. ^ "TE Rijeka (Rijeka Thermal Power Plant)". Official website HEP Proizvodnja. Hrvatska elektroprivreda. Retrieved 2013-08-25.
  7. ^ "Novi list".
  8. ^ "Dnevnik Nove TV neslužbeno doznaje: HEP planira ponovno aktivirati termoelektranu kod Rijeke" [Dnevnik Nova TV unofficially finds out: HEP plans to reactivate the thermal power plant near Rijeka]. Dnevnik.hr (in Croatian). 18 October 2022. Retrieved 19 October 2022.
  9. ^ "HEP pokreće termoelektranu Rijeka, moguće zagađenje zraka i povećana buka" [HEP starts the thermal power plant Rijeka, possible air pollution and increased noise]. Fiuman (in Croatian). 18 December 2023. Retrieved 18 December 2023.

and 15 Related for: Rijeka Thermal Power Station information

Request time (Page generated in 0.8022 seconds.)

Rijeka Thermal Power Station

Last Update:

The Rijeka Thermal Power Station (Croatian: Termoelektrana Rijeka, TE Rijeka, also known as TE Urinj) is an oil-fired power station east of Rijeka at Kostrena...

Word Count : 578

List of power stations in Croatia

Last Update:

hydroelectric, 4 thermal and 3 cogenerating power plants with the total installed electrical power of 3.654 MW. The Jaruga Hydroelectric Power Plant is the...

Word Count : 391

Plomin Power Station

Last Update:

Plomin Power Station (Croatian: Termoelektrana Plomin) is a coal-fired power station near Plomin, Croatia. As of 2021, its production corresponded to...

Word Count : 1962

Elektroprivreda Crne Gore

Last Update:

that is, one of the highest in Europe (220 m). Thermal power plant In 1982, Pljevlja Power Station was built with a capacity of 210 MW. Electric network...

Word Count : 910

List of tallest chimneys

Last Update:

with heights of 200 m (660 ft) or more are part of thermal, especially coal-fired power stations. This is to increase the stack effect and disperse pollutants...

Word Count : 3103

Energy in Croatia

Last Update:

hydro and thermal power plants, and partly from the Krško nuclear power plant, which is co-owned by Croatian and Slovenian state-owned power companies...

Word Count : 3200

Bechtel

Last Update:

world's largest solar thermal project, the Ivanpah Solar Electric Generating System in California, which began producing power in February 2014. In 2015...

Word Count : 9946

Economy of Croatia

Last Update:

within the Pan-European transport corridor Vb and corridor X connecting Rijeka to Budapest and Ljubljana to Belgrade, both via Zagreb. All rail services...

Word Count : 8268

Adriatic Sea

Last Update:

Pescara and Bari in Italy; Vlorë and Durrës in Albania; Split, Zadar and Rijeka in Croatia; Koper in Slovenia. In total, more than 3.5 million people live...

Word Count : 18455

Torpedo

Last Update:

commission placed by Giovanni Luppis, an Austro-Hungarian naval officer from Rijeka (modern-day Croatia), at the time a port city of the Austro-Hungarian Monarchy...

Word Count : 12196

Rizzani de Eccher

Last Update:

Delta, Nigeria) Lagos Osborne Bridge (Lagos, Nigeria) El Ain Sokhna Thermal Power Plant (Egypt) ENR Best Bridge or Tunnel Project 2020: Matagarup Pedestrian...

Word Count : 1551

List of tallest structures by country

Last Update:

Venets Transmitter, 302 m (991 ft) Chimney of Plomin Power Station, 340 m (1,115 ft) Chimney of TE Rijeka, 250 m (820 ft) Zagreb TV Tower, 169 m (554 ft) Zagreb...

Word Count : 10570

Berlin Brandenburg Airport

Last Update:

60 kilometres (37 mi) of cooling pipes were allegedly installed with no thermal insulation. To correct this, the demolition of numerous walls may be necessary...

Word Count : 20585

List of inventors

Last Update:

Luppis or Ivan Vukić (1813–1875), Austrian Empire (ethnical Croatian, from Rijeka) – self-propelled torpedo Gustave Lyon (1857–1936), France – chromatic harp...

Word Count : 11964

Legnano

Last Update:

of the Italian provincial capitals, including the coats of arms of Pula, Rijeka and Zadar, which belonged to Italy between the two world wars. Sanatorio...

Word Count : 10641

PDF Search Engine © AllGlobal.net