Global Information Lookup Global Information

Pennsylvania Railroad class L6 information


Pennsylvania Railroad L6
L6 #7825
Type and origin
Power typeElectric
BuilderPRR Altoona Works
Build date1932–1933
Total produced3
Specifications
Configuration:
 • Whyte2-8-2
 • AAR1-D-1
 • UIC1'Do'1
Gauge4 ft 8+12 in (1,435 mm) standard gauge
Driver dia.62 in (1.575 m)
Adhesive weight220,000 lb (99,800 kg)
Loco weight300,000 lb (136,000 kg)
Electric system/s11 kV, 25 Hz AC
Current pickup(s)Pantograph
Traction motors4x 625 hp (466 kW)
TransmissionAC current fed via a transformer tap changer to AC traction motors.
Train heatingNone
Loco brakeAir
Train brakesAir
Safety systemsCab signalling
Performance figures
Maximum speed54 mph (87 km/h)
Power output2,500 hp (1,900 kW)
Tractive effort55,000 lbf (244.65 kN)
Career
OperatorsPennsylvania Railroad
Number in classL6: 2, L6a: 1
Scrapped1966–1967
DispositionAll scrapped

The Pennsylvania Railroad's class L6 comprised three electric locomotives of 2-8-2 wheel arrangement in the Whyte notation. The intention was to build a whole class of freight boxcab locomotives using this design, but the displacement of class P5a to freight work after the introduction of the GG1 meant that there was little need for more electric freight locomotives.

Two L6 class locomotives were built at Altoona Works as prototypes in 1932. Numbered 7825–7826, they were renumbered 5938–5939 in 1933. Sixty production L6a locomotives were planned, with the car bodies of thirty subcontracted to Lima Locomotive Works (order number 1128, construction numbers 7587–7616). One was completed as PRR 5940, while the other 29 car bodies remained in store at Altoona until scrapped in 1942 for the war effort.

The 5939 and 5940 were renumbered 4790 and 4791 in 1966, with the 5938 scrapped the same year. The last two were scrapped in 1967.

and 6 Related for: Pennsylvania Railroad class L6 information

Request time (Page generated in 0.8007 seconds.)

Pennsylvania Railroad class L6

Last Update:

The Pennsylvania Railroad's class L6 comprised three electric locomotives of 2-8-2 wheel arrangement in the Whyte notation. The intention was to build...

Word Count : 229

Pennsylvania Railroad locomotive classification

Last Update:

Locomotive classification on the Pennsylvania Railroad took several forms. Early on, steam locomotives were given single-letter classes. As the 26 letters were...

Word Count : 1693

Richard Speck

Last Update:

joining the 33-member crew of Inland Steel's Clarence B. Randall, an L6-S-B1 class bulk ore lake freighter, on April 30. Speck's first voyage on the Clarence...

Word Count : 7618

Tanks of the United States

Last Update:

the Army's primary tank training center at Camp Colt in Gettysburg, Pennsylvania. Eisenhower became the #3 leader of the new tank corps and rose to the...

Word Count : 14823

M4 Sherman

Last Update:

and weight so that it could be transported via typical bridges, roads, railroads, and landing craft without special accommodation. Army Regulation 850-15...

Word Count : 17409

Linda Tillery

Last Update:

rop ed.). Los Angeles, California. January 7, 1998. p. L.A. Life section, L6. Armstrong Jr., Toni (September 1994). "Ten Years in the Lives of HOT WIRE's...

Word Count : 8946

PDF Search Engine © AllGlobal.net