Global Information Lookup Global Information

Osagyefo Barge information


Osagyefo Barge
Map
CountryGhana
LocationEffasu
Coordinates5°04′46″N 3°02′18″W / 5.0794°N 3.0383°W / 5.0794; -3.0383
StatusExisting; never operated
Thermal power station
Primary fuelNatural gas
Secondary fuelDiesel
Power generation
Nameplate capacity125 MW

The Osagyefo Barge is a 125 MW barge-mounted gas turbine electric power generating station located at Effasu in the Western Region of Ghana.

The 77 m long barge is equipped with a pair of single-cycle heavy-duty gas turbine units built by Ansaldo that have a combined generating capacity of 125 MW.[1] It is designed to burn either natural gas or diesel fuel.[2]

The 125 MW power barge was ordered by the Ghanaian government in 1995 with financial assistance from the Overseas Economic Cooperation Fund of Japan.[1] It was intended to generate electricity from natural gas obtained from offshore production fields. The project development called for 450 MW of combined cycle power barges to belated in a man made lagoon. The barge was built in Italy at Navalmare Yard, completed in 1999, and delivered to Ghana in October 2002. It was then moored at the Sekondi Naval Base in Sekondi until 2005, when it was moved to Effasu after the completion of dredging necessary to allow it to enter the harbor there.[2][3] The offshore oil and gas fields did not develop as quickly as expected, so the power barge sat idle and its condition deteriorated.[2] There was a proposal to move the barge to Tema, but that proposal was dropped in 2007.[4] During this period, there was little maintenance conducted on the power barge or on the site, resulting in the deterioration of many of the systems.

The power barge project was initially under the management of Western Power, a subsidiary of GNPC the Ghana National Petroleum Corporation; responsibility was transferred to the Volta River Authority in 2003.[5] In July 2007, the government of Ghana entered an unsolicited 20-year lease agreement with the company Balkan Energy Ghana to refurbish and operate the power barge, initially using diesel fuel and later using gas to be delivered by the West African Gas Pipeline. Ghana sought additional electricity supplies from the barge to alleviate electricity shortages resulting from reduced water levels at the Akosombo Dam hydroelectric project. The company promised to begin operations within 90 days. Also, plans were announced to increase the barge's generating capacity by 60 MW, bringing it from its current capacity of 125 MW up to 185 MW.[3][6] The unit has never operated and the expansion was not completed.[7] The government of Ghana sued in Ghanaian court, seeking to nullify the contract with Balkan Energy.[7][8] Balkan Energy blamed ProEnergy, a U.S. company with which it had contracted, for Balkan's inability to bring the generating station online when promised.[7] Balkan Energy and ProEnergy sued each other in U.S. courts and the government of Ghana later filed a lawsuit against ProEnergy in U.S. court.[7][9]

The name "Osagyefo" commemorates Kwame Nkrumah, the first president of Ghana.[6]

  1. ^ a b "Power barge arrives at Effasu Mangyea mini harbour". modernghana.com. 10 March 2005.
  2. ^ a b c "Energy From Osagyefo Barge". modernghana.com. 4 March 2008.
  3. ^ a b Nehemia Owusu Achiaw (4 March 2008). "More Power From Osagyefo Barge Soon". modernghana.com.
  4. ^ "Gov`t decision to stay Osagyefo barge at Effasu". modernghana.com. 7 September 2007.
  5. ^ "Volta River Authority Takes Over Effasu Power Project". AllAfrica.com. 15 October 2003.
  6. ^ a b "Ghana signs agreement for more electricity". AfricaNews.com. 30 July 2007.
  7. ^ a b c d J. Ato Kobbie (23 May 2012). "'Osagyefo Barge', Balkan Energy: Fraudulent Claims & A PPA That Never Was". modernghana.com.
  8. ^ Stephen Kwabena Effah (22 March 2012). "Court To Give Ruling On Ghana And Balkan Energy Case". Ghanaian Times.
  9. ^ "Government of Ghana v ProEnergy Services, LLC; Case No. 11-2714 (C.A. 8, May. 1, 2012)". The Judicial View.

and 14 Related for: Osagyefo Barge information

Request time (Page generated in 0.7788 seconds.)

Osagyefo Barge

Last Update:

The Osagyefo Barge is a 125 MW barge-mounted gas turbine electric power generating station located at Effasu in the Western Region of Ghana. The 77 m long...

Word Count : 605

Jubilee Oil Field

Last Update:

field Jubilee oil field FPSO Kwame Nkrumah FPSO John Evans Atta Mills FPSO John Agyekum Kufour MT Bonsu Gas plants Atuabo Gas Plant Related Osagyefo Barge...

Word Count : 1337

Effasu

Last Update:

Ghana, about 150 km west of Takoradi. The Osagyefo Barge is located at Effasu. "Gas Taskforce inspects Osagyefo Badge at Efasu". modernghana.com. Retrieved...

Word Count : 69

Ghana National Petroleum Corporation

Last Update:

field Jubilee oil field FPSO Kwame Nkrumah FPSO John Evans Atta Mills FPSO John Agyekum Kufour MT Bonsu Gas plants Atuabo Gas Plant Related Osagyefo Barge...

Word Count : 804

Ghana Oil Company

Last Update:

field Jubilee oil field FPSO Kwame Nkrumah FPSO John Evans Atta Mills FPSO John Agyekum Kufour MT Bonsu Gas plants Atuabo Gas Plant Related Osagyefo Barge...

Word Count : 1293

Tema Oil Refinery

Last Update:

field Jubilee oil field FPSO Kwame Nkrumah FPSO John Evans Atta Mills FPSO John Agyekum Kufour MT Bonsu Gas plants Atuabo Gas Plant Related Osagyefo Barge...

Word Count : 890

Volta River Authority

Last Update:

Companies portal Electricity sector in Ghana Ministry of Energy (Ghana) Osagyefo Barge "Akosombo Dam could serve Ghana for another 50 years if well maintained...

Word Count : 264

Ghana National Gas Company

Last Update:

field Jubilee oil field FPSO Kwame Nkrumah FPSO John Evans Atta Mills FPSO John Agyekum Kufour MT Bonsu Gas plants Atuabo Gas Plant Related Osagyefo Barge...

Word Count : 85

Atuabo Gas Plant

Last Update:

field Jubilee oil field FPSO Kwame Nkrumah FPSO John Evans Atta Mills FPSO John Agyekum Kufour MT Bonsu Gas plants Atuabo Gas Plant Related Osagyefo Barge...

Word Count : 815

FPSO Kwame Nkrumah

Last Update:

field Jubilee oil field FPSO Kwame Nkrumah FPSO John Evans Atta Mills FPSO John Agyekum Kufour MT Bonsu Gas plants Atuabo Gas Plant Related Osagyefo Barge...

Word Count : 408

Domunli Gas Processing Project

Last Update:

field Jubilee oil field FPSO Kwame Nkrumah FPSO John Evans Atta Mills FPSO John Agyekum Kufour MT Bonsu Gas plants Atuabo Gas Plant Related Osagyefo Barge...

Word Count : 120

MT Bonsu

Last Update:

field Jubilee oil field FPSO Kwame Nkrumah FPSO John Evans Atta Mills FPSO John Agyekum Kufour MT Bonsu Gas plants Atuabo Gas Plant Related Osagyefo Barge...

Word Count : 61

Saltpond Oil Field

Last Update:

field Jubilee oil field FPSO Kwame Nkrumah FPSO John Evans Atta Mills FPSO John Agyekum Kufour MT Bonsu Gas plants Atuabo Gas Plant Related Osagyefo Barge...

Word Count : 1154

FPSO John Evans Atta Mills

Last Update:

field Jubilee oil field FPSO Kwame Nkrumah FPSO John Evans Atta Mills FPSO John Agyekum Kufour MT Bonsu Gas plants Atuabo Gas Plant Related Osagyefo Barge...

Word Count : 174

PDF Search Engine © AllGlobal.net