This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these template messages)
This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed. Find sources: "Northeast Power Coordinating Council" – news · newspapers · books · scholar · JSTOR(August 2022) (Learn how and when to remove this message)
The topic of this article may not meet Wikipedia's notability guidelines for companies and organizations. Please help to demonstrate the notability of the topic by citing reliable secondary sources that are independent of the topic and provide significant coverage of it beyond a mere trivial mention. If notability cannot be shown, the article is likely to be merged, redirected, or deleted. Find sources: "Northeast Power Coordinating Council" – news · newspapers · books · scholar · JSTOR(July 2022) (Learn how and when to remove this message)
(Learn how and when to remove this message)
Northeast Power Coordinating Council
Six regional entities (2021)
Abbreviation
NPCC
Founded
January 19, 1966; 58 years ago (1966-01-19)[1]
Type
501(c)(6)[2]
Legal status
Nonprofit corporation
Purpose
To promote and improve the reliability of the international, interconnected bulk power systems in northeastern North America through its Regional Entity and Criteria Services divisions.[3]
Area served
Maine, Vermont, New Hampshire, Massachusetts, New York, Connecticut, Rhode Island, Ontario, Québec, New Brunswick, Nova Scotia, Prince Edward Island
President, Chief Executive Officer
Charles Dickerson[4]
The Northeast Power Coordinating Council (NPCC) was formed January 19, 1966, as a successor to the Canada–United States Eastern Interconnection (CANUSE).[1] It was formed in order to improve reliability of electric service.[1] NPCC is one of six regional entities under North American Electric Reliability Corporation (NERC) authority. NERC and the regional reliability councils were formed following the Northeast Blackout of 1965. NPCC's offices are located in New York City, New York.
The NPCC region lies within the Eastern Interconnection and occupies the greater New England region of North America, covering all of the States of Maine, Vermont, New Hampshire, Massachusetts, New York, Connecticut, Rhode Island, and the Provinces of Ontario, Québec, New Brunswick, Nova Scotia and Prince Edward Island. NPCC also has ties to non-NERC systems in eastern Canada. In terms of load served, NPCC covers 20% of the Eastern interconnection's total load demand, and 70% of Canada's entire demand.
The Hydro-Québec system, which encompasses all of Québec, is commonly[when?] considered[by whom?] as part of the Eastern Interconnection even though it technically is a separate interconnection. It is tied to rest of the NPCC and Eastern Interconnection through four high voltage direct current ties.
At the time of its formation in 1966, NPCC had 22 utility systems as members.[5] As of 2019, NPCC has 90 members.[2]
^ abc"Power Firms Form Council for Service Reliability". Transcript-Telegram (Holyoke, Massachusetts). January 20, 1966. p. 2.
^ ab"Form 990: Return of Organization Exempt from Income Tax". Northeast Power Coordinating Council Inc. Internal Revenue Service. December 31, 2019. Retrieved August 17, 2022.
^"Audited Financial Statements, December 31, 2021 and 2020". Northeast Power Coordinating Council, Inc.. April 29, 2022. Retrieved August 17, 2022.
^"Leadership Team". Northeast Power Coordinating Council. Retrieved August 17, 2022.
^"22 Utilities Form Power Council". Democrat and Chronicle (Rochester, New York). January 20, 1966. p. B1.
and 26 Related for: Northeast Power Coordinating Council information
The NortheastPowerCoordinatingCouncil (NPCC) was formed January 19, 1966, as a successor to the Canada–United States Eastern Interconnection (CANUSE)...
Chiefs' Council, a co-ordinating body for policing in the UK (replacing the previous Association of Chief Police Officers) NortheastPowerCoordinating Council...
the NortheastPowerCoordinatingCouncil (NPCC) formed to improve system reliability. Concerned about the system's reliability, the Northeast'spower companies...
The Florida Reliability CoordinatingCouncil (FRCC) was (until 2019) one of the Regional Entities (REs) that were delegated authority to ensure reliability...
The Northeast blackout of 2003 was a widespread power outage throughout parts of the Northeastern and Midwestern United States, and most parts of the...
of northeastern Maine. The NBSO was part of the Northeast Power CoordinatingCouncil, which oversaw electricity reliability in the Northeastern United...
the Maritime provinces, Quebec and Ontario are part of the NortheastPowerCoordinatingCouncil (NPCC) with utilities in New England and in New York State...
wrested state power. The Coordinating Committee of the Armed Forces formed in June 1974, later called the Derg, which decided to seize power from the emperor...
Victorville, California. Path 61 is part of the Western Electricity CoordinatingCouncil's links of electrical intertie paths in the western United States...
Northeastern United States, also referred to as the Northeast, the East Coast, or the American Northeast, is a geographic region of the United States located...
Power's ability to meet the reliability standards defined by North American Electric Reliability Corporation (NERC) and NortheastPowerCoordinating Council...
"civilianized" the administration but stayed in power until 1991. The Derg was established on 21 June 1974 as the Coordinating Committee of the Armed Forces, Police...
Mongolia. All top government and party leaders of the Northeast gathered with the purpose of coordinating and integrating their regional development strategies...
Defense Council. Archived from the original on 7 November 2017. Retrieved 1 November 2017. NTPC commissioned 50 MW of NP Kunta Ultra Mega Solar Power Project...
Hulunbuir. Premier Wen Jiabao held a State Council meeting on 10 September 2003 regarding the issue of reviving northeast China. The meeting saw the drafting...
power of competence housing and planning, including mayoral development areas and corporations, land and acquisition powers finance, through council precepts...
disconnection had never occurred before. Neither the Western Electricity CoordinatingCouncil (WECC), in charge of the system's reliability; nor the California...