Nadikudi-Pagidipalli section Nadikudi-Macherla branch line
Nadikudi-Srikalahasti section
Platforms
4
Tracks
5
Construction
Structure type
Standard
Parking
Available
Accessible
[citation needed]
Other information
Status
Functioning
Station code
NDKD
Zone(s)
South Central Railway
Division(s)
GunturTooltip Guntur railway division
History
Opened
1930; 94 years ago (1930)[citation needed]
Electrified
Yes
Location
Nadikude Junction
Location in Andhra Pradesh
Show map of Andhra Pradesh
Nadikude Junction
Location in India
Show map of India
Preview warning: Page using Template:Infobox station with deprecated parameter "ADA". Replace with "accessible".
Nadikudi railway station (station code:NDKD[1]), is a railway junction in Guntur district, Andhra Pradesh, India.[2]
^"Distances in kilometers between stations on the Nadikude Jn. – Vishnupuram section" (PDF). Indian Railways. 12 September 2009. p. 62. Archived from the original (PDF) on 14 April 2017. Retrieved 30 April 2019.
^Jonathan, P. Samuel (4 May 2019). "Delay in land acquisition emerges bottleneck for Nadikudi-Srikalahasti rail line". The Hindu. ISSN 0971-751X. Retrieved 26 May 2019.
and 24 Related for: Nadikudi railway station information
Nadikudirailwaystation (station code:NDKD), is a railway junction in Guntur district, Andhra Pradesh, India. Historically, Nadikudi was a metre-gauge...
(station code: SC) is an NSG–1 category Indian railwaystation in Secunderabad railway division of South Central Railway zone. It is the major Railway...
Macherla railwaystation (station code: MCLA), is an Indian Railwaysstation in Macherla of Andhra Pradesh. It lies on the Nadikudi–Macherla branch line...
Pagidipall railwaystation (station code:PGDP), is a railway junction located near Bibinagar in Bhuvanagiri district where Nadikudi line meets Secunderabad–Kazipet...
Railway (SCR). The railwayStation code for Piduguralla is PGRL. The railway line is an electrified single line one and a new railway track (Nadikudi-Srikalahasti...
SCR Railway Map 2018 Under construction: Nadikudi-Srikalahasti railway line The list includes the stations under the jurisdiction of Guntur railway division...
Venkatagiri railwaystation connects the new Nadikudi–Srikalahasti section with Gudur–Katpadi branch line. "Distances in kilometers between stations on the...
Nalgonda railwaystation (station code: NLDA) is the major railwaystation in Nalgonda district of Telangana state. A 152 km long Nadikudi-Pagidipalli...
India. Miryalaguda Railwaystation was opened in 1989, after the completion of Nadikudi-Pagidipalli section. It is one of the stations in the division to...
list of railwaystations in India. The railway operations are managed by Indian Railways (IR) in the country. List of Indian Railwaysstations whose names...
2016. "Surveys" (PDF). South Central Railway, Indian Railways. 24 July 2015. p. 14. Retrieved 3 May 2019. "Nadikudi – Srikalahasti line to ensure better...
Krishnapatnam railwaystation (station code:KAPT), is an Indian Railwaysstation in Krishnapatnam of Nellore district in the state of Andhra Pradesh. It...
Lankojanapalli Roads intersect. APSRTC bus station is in Auto Nagar on Darsi - Addanki Road. The railway line, Nadikudi-Srikalahasthi will pass through the town...
15 km away from Kandukur. A new RailwayStation is coming up in Kanigiri under the new Railway Line project of the Nadikudi–Srikalahasti section. Vijayawada...
projects allocated or being part of the region such as, Nandyal–Yerraguntla, Nadikudi–Srikalahasti, Kadapa–Bangalore sections are the under development projects...
Buses Hyderabad MGBS, Bangalore, Channai,and other destinations. Railway line, Nadikudi-Srikalahasthi is passing (under construction) through the town.and...
Pradesh State Road Transport Corporation, Operated by its own depot. Railway line. Nadikudi-srikalahasthi is passing (under construction) through the town....
65 km away from the Kanigiri Municipality. There is a proposed railway line from Nadikudi to Srikalahasti which would pass through Kanigiri. Air Vijayawada...
under the South Central Railway division. The rate of construction was only 2 km per year in the preceding five years. The Nadikudi–Srikalahasti line of...
Morarjee Mandan of Khedoi. The tracks starting from Machrela runs through Nadikudi, Piduguralla, Bellamkonda, Sattenapalle, Gudipudi, Peddakurapadu, Lingamguntla...
Venkaiah Naidu on Aug 21, 2019. Rapur became a railway junction with 4 routes in 2022 after completion of Nadikudi-Srikalahastri line. Kandaleru dam, the longest...